CSP 26.15 - Chiller Replacement Project Addendum No. 1
Project Information
- Bid Title
- CSP 26.15 - Chiller Replacement Project Addendum No. 1
- Issuing Agency
- Beaumont Independent School District
- Location
- Texas
- Published Date
- May 22, 2026
- Closing Date
- Jun 4, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
CSP 26.15 - Chiller Replacement Project
- Attachment Preview
-
May 20, 2026ADDENDUM NO. 1Project:Beaumont ISD – Chiller Replacement Project (Guess E.S.)(CSP 26.15)Prepared by:Salas O’Brien Engineers10930 W. Sam Houston Parkway N., Suite 900Houston, Texas 77064SOBE Project No.: 2650-00566Prepared For:Prospective ProposersPART A:NOTICE TO PROPOSERS1.Receipt of this Addendum shall be acknowledged on the Proposal Form. Failureto do so may subject Proposers to disqualification. Each Proposer shall makenecessary adjustments and submit his proposal with full knowledge of allmodifications, clarifications, and supplemental data included therein.2.This Addendum forms part of the Contract Documents and shall be incorporatedintegrally therewith. Where provisions of the following supplemental data differfrom those of previously issued documents, this Addendum shall govern.3.The following Contract Documents have been issued to date delineating theWork (Project). Contract Documents dated: April 17, 20264.This Addendum consists of 2 typewritten pages and 1 page of attachments for atotal of 3 pages.PART B:PART C:CHANGES TO PRIOR ADDENDUM“Any changes to prior issued addendum materials are listed here.”1.NoneCHANGES TO THE PROJECT MANUAL“Any changes to specifications are listed here.”1.Section 23 07 19 HVAC PIPING INSULATIONa. Part 3 Execution, Article 3.6 Miscellaneous, Revise Item A to read “New basemounted pump shall NOT be insulated. Piping insulation and vapor barriershall stop at flange to new pump.”PART D:CHANGES TO THE DRAWINGS1.Sheet M1.1 - MECHANICAL DEMOLITION FLOOR PLAN – MECHANICALYARDa. Replace keyed #7 in its entirety with the following: “7. EXISTING CHILLEDWATER PUMP SERVING “A&B”, ASSOCATED ISOLATION VALVES ANDAPPARTATUSES SHALL BE REMOVED. EXISTING CONCRETE PADSHALL REMAIN AND BE REUSED.”2.Sheet M2.1 – MECHANICAL FLOOR PLAN – MECHANICAL YARDa. Replace keyed #7 in its entirety with the following: “7. EXISTING 6”CONCRETE PAD SHALL REMAIN AND BE REUSED. EXTEND EXISTINGCOPNCRETE PAD FOR NEW PUMP.”10930 W. Sam Houston Pkwy N, Suite 900Houston, Texas 77064281.664.1900salasobrien.comBeaumont ISD – Chiller Replacement Project (Guess E.S.)Addendum 1PART E:PART F:PART G:PART H:3.Sheet M3.1 – MECHANICAL PIPING DIAGRAMSa. Detail #1 Demolition Chilled Water Piping Diagram, Demolition Keyed Notes,Replace keyed #6 in its entirety with the following: “6. EXISTING CHILLEDWATER PUMP SERVING “A&B”, ASSOCATED ISOLATION VALVES ANDAPPARTATUSES SHALL BE REMOVED. EXISTING CONCRETE PADSHALL REMAIN AND BE REUSED.”b. Detail #2 Chilled Water Piping Diagram, Keyed Notes, Replace keyed #9 in itsentirety with the following: “9. EXISTING 6” CONCRETE PAD SHALLREMAIN AND BE REUSED. EXTEND EXISTING CONCRETE PAD FORNEW PUMP.”4.Sheet M4.1 – MECHANICAL SCHEDULES AND DETAILSa. Delete detail #2 in its entirety.RE-ISSUED DRAWING SHEET (30” x 42”)“Insert the following sheets and omit the previously issued sheets of the same number.”1.NoneNEW DRAWINGS SHEETS (30” x 42”)1.NoneQUESTIONS/CLARIFICATIONS1.Question: If I need an additional site visit is it possible to make that happen?Answer: The district has agreed to provide an additional site visit on 5/27 @10AM.2.Question: Is the district okay with moving the pump over a few feet to help withgetting the new chiller installed sooner or would the district like the new pad inthe same existing location?Answer: The district requests the new pump to be installed in the same locationas the existing pump. The existing concrete pad will be reused and extended asdescribed in the addendum items above.3.Question: Can we get an explanation on why the single point rather than dualpoint? If the manufacturer cannot accommodate a single point connection is it anacceptable modification to return to dual point connection?Answer: The approved manufacturers listed in the specification each requireonly a single-point electrical connection. Additionally, selecting an air-cooledchiller with a single-point connection allows reuse of the existing overcurrentprotection with minimal disruption to the current installation. By contrast, a dual-point connection air-cooled chiller would require a second overcurrent protectivedevice in the MCC or at the branch-circuit tap.ATTACHMENTS1.Pre-Proposal Sign in SheetEND OF ADDENDUM 110930 W. Sam Houston Pkwy N, Suite 900Houston, Texas 77064281.664.1900
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
DYESS AFRC CHILLER REPLACEMENT
DYESS AFRC CHILLER REPLACEMENT Solicitation ID: TMD26-CFMO-0045092 Due Date: 8/11/2026 Due Time: 1:00
State Government of Texas
Bid Due: 8/11/2026
TDCJ - Gist Unit - Procuremen...
TDCJ - Gist Unit - Procurement of HVAC Parts and Accessories Solicitation ID:
State Government of Texas
Bid Due: 7/24/2026