North Central Correctional Facility AHU & Condenser Replace Unit A&B
Project Information
- Bid Title
- North Central Correctional Facility AHU & Condenser Replace Unit A&B
- Issuing Agency
- State Government of Iowa
- Location
- Iowa
- Published Date
- Jan 21, 2026
- Closing Date
- Feb 13, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFP950100-01
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid InformationBid Number
RFP950100-01
Solicitation
North Central Correctional Facility AHU & Condenser Replace Unit A&B
Solicitation Type
Request for Proposals
CountyDescriptionDescription
The State of Iowa Department of Administrative Services (DAS) is seeking professional design services to remove and replace the existing AHU and exterior condensing coils in Living Unit A & B at North Central Correctional Facility.
Agency InformationNumber
005
Name
Administrative Services, Dept
Address 1
1305 E. Walnut St.
Address 2
City/State/Zip
Des Moines, IA 50319
Contact InformationContact Name
Construction Procurement
Contact Title
Michael Bradbury
Contact Email
Contact Phone Number
(515) 823-9327
Contact Phone Extension
Contact Other Number
Contact Fax NumberValid DatesFrom
1/21/2026 8:00:00 AM
Until
2/13/2026 2:00:00 PM
Documents/Attachments - Attachment Preview
-
RFP COVER SHEETAdministrative InformationSTATE OF IOWAREQUEST FOR PROPOSALSPROFESSIONAL DESIGN SERVICESRFP Number RFP 950100-01Title of RFPDOC NCCF Air Handler Replacement and CondenserCoils Unit A & BAgencyIowa Department of Administrative Services (DAS)ProjectDescriptionThe State of Iowa Department of Administrative Services (DAS) is seeking professionaldesign services to remove and replace the existing AHU and exterior condensing coilsin Living Unit A & B at North Central Correctional Facility.State Issuing Officer:Michael BradburyIssuing OfficerIowa Department of Administrative ServicesHoover State Office Building, Level 31305 East Walnut, Des Moines, IA 50319-0105 Phone: 515-823-9327Email: construction.procurement@iowa.govPROCUREMENT TIMETABLE—Event or ActionDate/Time (Central Time)State Posts Notice of RFP on TSB website1/19/2026State Issues RFP1/21/2026Pre-Proposal Conference Location and Address:Is Pre-Proposal Conference mandatory? No, but recommended.If a map is needed, contact the Issuing Officer.2/4/2026 @ 11:45am at NorthCentral Correctional Facility orMicrosoft TeamsJoin the meeting nowQuestions, requests for clarification, and suggested changes fromRespondents due to Construction Procurement2/6/2025 at 2:00pmProposals Due2/13/2025 at 2:00pmRelevant WebsitesWebsite where Addenda to this RFP will be posted http://bidopportunities.iowa.govWebsite where contract terms and conditions are postedhttps://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdfNumber of Copies of Proposals Required to be Submitted: 1 DigitalFirm Proposal TermsThe minimum number of days following the deadline for submitting Proposals that the firm guaranteesall proposal terms, including price, will remain firm is 120 Days.1.1 INTRODUCTIONThe Iowa Department of Administrative Services (DAS) is seeking proposals from qualified andavailable Design companies for services, per RFP cover page, and as outlined in the following(Sections 1.2 - 1.3). The successful proposal must:● For the staff that will be assigned, identify and describe qualifications, experience, andexpertise in providing services for similar, or relevant, projects.● For the staff that will be assigned, provide a list of past similar or relevant projectscompleted in the last 5 years, and include brief descriptions of what the projects entailedand a contact name and phone number (reference). In addition provide estimated projectcost, final project cost at acceptance, and whether it was completed on time.● Describe the composition of your team. Identify staff to be assigned. Provide resumes of keyindividual(s)includingeducation,relevantexperience,andcertifications/licensing. NOTE: Any responding company and/or consultant that is part of theproject design services cannot receive an award from the resulting request for bid ofconstruction services.● Describe the cost estimating, status reporting, and cost reporting procedures you utilize.● Describe computer program/software capabilities and expertise you utilize. Please describeyour experience.● Provide a copy of your organizational chart.● Describe your experience, if any, on designing similar or relevant projects for the State ofIowa.● Provide the hourly rates, and anticipated hours by position, for all persons (including sub-consultants) that will be assigned to the project. Also provide an estimated fee total.● Identify desired reimbursable charges (the State has limitations, per State of Iowa AccountingPolicies and Procedures 210.245), and all other charges.1.2 SCHEDULEDAS is seeking a firm that can commence work upon execution of a contract. Time is of theessence.Execution of Designer’s ContractTentative Design Kick-Off Meeting100% Design Development Documents and Cost Opinion By50% Construction Documents and Cost Opinion By95% Construction Documents and Cost Opinion By100% Construction Documents and Cost Opinion ByContractor BiddingExecution of Contractor’s Contract(s)Submittals, Procurement and ConstructionClose outWeek of February 16th, 2025Week of February 23rd, 2025Design professional to proposein RFP ScheduleDesign professional to proposein RFP ScheduleDesign professional to proposein RFP ScheduleApril 29th, 2026May, 2026June, 2026June, 2026 to October, 2026November, 2026 to December,20261.3 PROJECT DESCRIPTIONConstruction Manager (McGough Construction) has been engaged for this Project to serve asadvisor to DAS and to provide assistance in administrating the Contract for Design between DASand the Designer according to separate contract between DAS and Construction Manager. DAS iscurrently seeking design services from qualified firms for a project consisting of removal andreplacement of the existing AHU and exterior condensing unit located in both Living Unit A andLiving Unit B at North Central Correctional Facility. This work consists of modifications to theductwork, plumbing, electrical and potentially site work for new equipment pad in two separatelocations on campus that will take place under the same project scope.Design services shall include:1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover pagefor a sample contract.1.3.2 All design disciplines necessary to complete the scope of work.1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with theOwner, Construction Manager, and Owner’s maintenance staff.1.3.4 Use of the State of Iowa‘s construction management software program for uploading alldocuments, submitting and approving pay apps, and construction administration. Thecost for the use of the software is paid by the Owner.1.3.5 The following design services will be needed:1.3.5.1 Identify and provide opinions on what components can be salvaged or re-used,what components are needed to be replaced.1.3.5.2 Creation of construction drawings and specifications for removal andreplacement of existing AHU and exterior condensing units in Living unit A and B.1.3.5.3 Coordination with the State Historic Preservation Office (SHPO). Submit designto SHPO as needed to confirm the design meets SHPO’s requirements andprovide modifications as necessary based on SHPO commentary.1.3.6 Existing CAD/PDF drawings are not available. PDF drawings for similar replacements inUnit C and Unit D are available.1.3.7 Field examination of the existing buildings.1.3.8 Design for scope of work. Provide material recommendations based on experience,quality, and price. Recommendations for replacements and upgrades shall include non-proprietary equipment and systems.1.3.9 Provide minor drawing work to assist the Construction Manager in the development ofhazardous materials bid package. This shall include providing PDF backgrounds foridentification, by others, of hazardous materials removal.1.3.10 Designer shall include any and all survey work required for completion of project.1.3.11 Coordinate with State agencies to confirm utilities that may be abandoned as well as shutdown requirements where required.1.3.12 Provide detailed input of design schedule to Construction Manager for overallincorporation into master schedule.1.3.13 Designer shall assist Construction Manager in the evaluation of long lead times.1.3.14 Quality control during Design, Preconstruction and Construction.1.3.15 Compliance with all Federal, State, and applicable AHJ codes.1.3.16 Completion of State building and energy code documents, as required.1.3.17 Design review will be conducted at 100% design development documents, 50%construction documents, and 95% construction documents. Dates for design reviewmeetings to be coordinated with the design and project team and set no later than thedesign kickoff meeting. Review will be conducted with DAS Owner Representative,Construction Manager, and Facility Representative, at a minimum. Drawings,specifications and cost opinions shall be provided at least five days prior to each reviewmeeting. An additional review meeting may be required at the end if there arediscrepancies in cost opinions or constructability review questions.1.3.18 Review with the Department of Inspections, Appeals, and Licensing’s Building CodeBureau for approval of plans or exemption from review. All fees associated with theBureau are the responsibility of the designer.1.3.19 Develop and distribute agendas and meeting minutes for all meetings during the designphase.1.3.20 Designer shall provide any information necessary to obtain utility rebates whereapplicable.1.3.21 Construction cost opinions provided by the Design Professional team during Design (at100% design development documents, 50% construction documents, and 95%construction documents) with a Final Estimate for construction included with biddocuments, per Iowa Code.1.3.22 Construction drawings, specifications (the Construction Manager will produce Divisions00 and 01), and addenda.1.3.23 Provide bid alternates as determined during the course of design and bid packagedevelopment.1.3.24 Assist Owner and Construction Manager in obtaining bids from qualified contractors.1.3.25 Construction administration, including creation of the submittal and closeout items log,review of and responses to submittals and closeout documentation, RFIs, proposalrequests, change orders, pay applications, periodic site visits, attendance at projectmeetings as required, participation / development of contractor punch list, closeoutdocumentation review and approval, certificates of substantial completion, andcertificates of final completion, as well as development of Architectural SupplementalInstructions for design revisions, and punch lists within the construction managementsoftware program.1.3.26 Participation with project team during construction progress meetings as required.Designer shall participate in bi-weekly conference calls during the construction period.1.3.27 Field Observation reports, with photos, submitted for each site inspection within five (5)days of the site visit.1.3.28 Acknowledgement that all documents are copyright to the State of Iowa and shall beturned over to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs andaddendums will be expected to be incorporated before final posting. Both the nativecomputer format and PDF versions shall be uploaded to the construction managementsoftware program at the end of the project.1.3.29 The Department requests lump sum pricing from the respondents to this RFP, with thelump sum base scope price being inclusive of all reimbursables, such as printing, mileageand travel expenses. The Department requests the fee proposal from the respondents tothis RFP be broken down as follows. These breakdown prices will be used as the scheduleof values for billing purposes.1.3.29.1 Design Development Documents1.3.29.2 Construction Documents1.3.29.3 Bidding or Negotiation Assistance1.3.29.4 Construction PhaseInclude at a minimum, ten (10) site visits. Design kick off/Building evaluation, 100% designdevelopment document review meeting, 50% document review, Pre-bid meeting, Pre-construction kickoff, Construction Field Observation (2), Substantial completion/punchlist development, Punch list/Final Completion approval, and one year warranty correctionperiod visit. Design Review at 95% construction document development will beconducted via conference call. Beyond these site visits, each proposing firm shall provideadditional visits as they see fit to complete the work of design. In addition to the lumpsum pricing, the Department requests a unit price per construction inspection visit. Thisunit price will be additive or deductive based on the number of actual visits made.
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
2026 Summer Sidewalk Repair P...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of Iowa
Bid Due: 7/15/2026
DAS CC Historical Building El...
DAS CC Historical Building Elevator Replacements PH1 DAS CC Historical Building Elevator Replacements
Iowa Department of Administrative Services
Bid Due: 7/09/2026