Addendum No 01_E_Rate Category 2 Equipment RFQ No. 06-25/26

Project Information

Bid Title
Addendum No 01_E_Rate Category 2 Equipment RFQ No. 06-25/26
Issuing Agency
Lake Elsinore Unified School District
Location
California
Published Date
Dec 16, 2025
Closing Date
Jan 13, 2026
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Attachment Preview
LAKE ELSINORE UNIFIED SCHOOL DISTRICT
ADDENDUM NUMBER ONE
E-RATE CATEGORY 2 EQUIPMENT
RFQ NO. 06-25/26
December 15, 2025
General: The following changes, additions and clarifications have been made to the original
Documents for the above referenced request for quotes and shall be incorporated into the Vendor’s
response. All documents provided with, and referenced in, the District’s RFQ No. 06-25/26,
including contract documents and specifications (collectively, the “Bid Documents”) shall remain
unchanged with the exception of those elements added, revised, deleted, or clarified by this
Addendum. In case of conflict between the Bid Documents and this Addendum, this Addendum
shall govern and shall supersede any term in the Bid Document that contradicts or otherwise
clashes with this Addendum.
Vendor must acknowledge receipt of Addendum Number One on the Pricing Sheet and
failure to do so may subject Vendor to disqualification.
REVISION TO RFQ DOCUMENTS:
Pricing Sheet – Page 20 of RFQ No. 06-25/26
The Pricing Sheet has been revised to include a section for Vendors that are submitting a quote to
acknowledge receipt of any Addenda issued.
The revised RFQ Documents are posted on the District Website and the revised Pricing Sheet
(page 20 of RFQ Documents) is included as an attachment in this addendum
RESPONSES TO REQUESTS FOR CLARIFICATIONS:
(7 RFI’s were received)
1) Lift Requirements for Access Point Swaps (Secured Retail Networks, Inc)
The RFQ states the scope includes replacing all indoor and outdoor APs district-wide. To
accurately estimate labor: Indoor AP Mount Heights: Approx. how many indoor APs require
a lift versus those reachable by standard ladders? Outdoor AP Mount Heights: For the 30
outdoor APs, how many require: Pole-mounted lifts? Wall-mounted lifts reaching above 12–
15 feet? Are there any sites with restricted access where a specialty lift (narrow aisle, tow-
behind, etc.) is required? District-Provided vs SRN-Provided Lifts: Does the District provide
lifts at any campuses, or should SRN include lift rentals in installation pricing?
A: There are approximately thirty (30) Indoor APs that require a lift to reach. There are
zero (0) Outdoor AP pole-mounted lifts, approximately twenty-five (25) Outdoor AP
wall-mounted lifts reaching above 12-15 feet. The District does not anticipate that a
specialty lift will be required to reach the AP mounts. The Vendor is expected to provide
their own lifts.
2) Cabling Re-Use and Redundant Power Feeds (Secured Retail Networks, Inc.)
1
The RFQ states: “No additional cable will be necessary”: Existing Cable Verification: Can the
District confirm all existing cabling to current APs is Cat6/Cat6a and supports PoE+ minimum,
with no sites requiring recabling? Redundant Power Requirements: Do any sites require
redundant cabling or dual-Ethernet power feeds for new Wi-Fi 7 APs, since they support dual
10GbE ports for data and power. Is the District expecting: Single-cable PoE+ / PoE++, or Dual-
port active/standby power?
A: Yes, all AP’s have a Cat6 E. No sites require re-cabling. The District is requesting and
expecting Single-cable PoE+ / PoE++.
3) Need for Gateways if Running Aruba Central (Secured Retail Networks, Inc.)
The RFQ lists Aruba 9240 Gateways and licenses. Mandatory vs. Optional: Are the gateways
required for this project, or optional depending on the wireless architecture design? Controller-
Based vs. Controllerless: Since Aruba Central supports full cloud-managed AP operation,
should SRN assume: Controller-managed mode using new 9240 Gateways, or Controllerless
(microservices) mode leveraging Aruba Central only?
A: The gateways required for this project are mandatory. The vendor should assume
Controllerless (microservices) mode leveraging Aruba Central only.
4) Indoor / Outdoor AP Quantity Confirmation per Site? (Secured Retail Networks, Inc.)
The RFQ lists district-wide quantities, but not site breakdowns. Per-Campus AP Counts: Could
the District provide the approximate number of APs per site (indoor and outdoor) so labor
estimates can reflect actual site conditions? AP Model Mapping: Are all current APs 1:1
replacements, or will quantities change due to redesign?
A: The District has attached a Spreadsheet listing the AP’s to this Addendum. Most AP’s are
indoor, with the exception of any AP with EXAP in the name, those are external AP’s.
All current APs shall be 1:1 replacements.
5) Cutover Scheduling & Site Access (Secured Retail Networks, Inc.)
Summer Installation Option: If funding is awarded, does the District prefer installation: During
Summer 2026, In phases throughout 2026, or as soon as equipment arrives?
A: Ideally installation will begin as soon as equipment arrives and completed as soon as
possible. This depends on the approval date from the SLD for our Form 471.
6) Warehouse / Staging Logistics (Secured Retail Networks, Inc.)
Staging Location: Will the District provide a staging area for pre-config and burn-in testing
before deployment? AP Labeling Requirements: Does the District require: Barcodes?
Site/room labels? Serialized asset tracking before install?
A: Vendor will be expected to have their own staging area. All access points will be labeled
with a label visible to district staff as it hangs in the classroom or office. All labels will
be in accordance with district standards prior to deployment. All labels will be a
minimum of 2”x3”, consisting of the AP name, MAC Address, Serial Number, Date
installed, IDF name, E-Rate Yr XXXX. Asset tracking with District tags will be
dependent on the cost of the individual piece of equipment. Anything over $1,500 will
need an asset tag that the district will provide.
2
7) Disposal of Old Equipment (Secured Retail Networks, Inc.)
Should SRN include the removal and e-waste disposal of existing APs? Or will the District
retain all old hardware?
A: The District will retain the AP’s. The Vendor is only required to replace the AP’s. During
the planning stages, the Vendor is expected to work with the district to determine the best
location at each site.
Attachments: Revised Pricing Sheet (1 page)
LEUSD AP List (33 pages)
END OF ADDENDUM NUMBER ONE
3
LAKE ELSINORE UNIFIED SCHOOL DISTRICT
PRICING FOR SECTION: ___________
DISTRICT CONTACT: Ricardo Felix
RFQ NO: 06-25/26
Please provide pricing in the following format by individual section and site.
QTY UNIT DESCRIPTION
MODEL
MANUFACTURER
UNIT
COST
DUE DATE: January 13, 2026, 3:00 PM PST
EMAIL: Ricardo.felix@leusd.k12.ca.us
EXTENDED
E-RATE
COST
ELIGIBILITY %
TOTAL E-RATE
ELIGIBLE COST
TOTAL E-RATE
INELIGIBLE COST
Describe Standard Manufacturer Warranty Description and any associated
costs:
Addendum Acknowledgement: Add No. 1 ________
(Mark with an X)
SUB-TOTAL
8.75% SALES TAX
SHIP/ HANDLING
TOTAL COST
DELIVERY TIME:
__________ PAYMENT TERMS: _____________DATE: ___________________ E-RATE SPIN #: ___________________________
COMPANY NAME: __________________________________________ REPRESENTATIVE NAME:
_______________________________________
ADDRESS:
______________________________________________________________________ PHONE NO.: ____________________________
EMAIL:
______________________________________________________________________
Name:
AES-LIB-MakerSpace-AP
AES-MainOffice-AP
AES-RM105-AP
AES-RM110-AP
AES-RM115-AP
AES-RM120-AP
AES-RM122-AP *
AES-RM201-01-AP
AES-RM201-02-AP
AES-RM202-AP
AES-RM301-AP
AES-RM302-AP
AES-RM303-AP
AES-RM304-AP
AES-RM305-AP
AES-RM306-AP
AES-RM307-AP
AES-RM308-AP
AES-RM310-AP
AES-RM310N-AP
AES-RM401-AP
AES-RM402-AP
AES-RM403-AP
AES-RM404-AP
AES-RM405-AP
AES-RM406-AP
AES-RM407-AP
AES-RM408-AP
AES-RM408-AP
AES-RM409-AP
AES-RM410-AP
AES-RM412-AP
AES-RM420-01-AP
AES-RM420-02-AP
AES-RM420-03-AP
AES-RM501-AP
AES-RM502-AP
AES-RM503-AP
AES-RM504-AP
AES-RM505-AP
AES-RM506-AP
AES-RM507-AP
AES-RM508-AP
MAC:
F4:2E:7F:CC:F9:10
90:4C:81:CE:5D:32
20:A6:CD:CF:95:8C
F4:2E:7F:CD:0C:D4
F4:2E:7F:CC:F7:E0
F4:2E:7F:CC:F6:1C
F4:2E:7F:CD:12:68
F4:2E:7F:CD:0B:E8
F4:2E:7F:CE:04:8E
F4:2E:7F:CD:6E:9C
F4:2E:7F:CD:12:4E
F4:2E:7F:CC:F2:CE
20:A6:CD:CF:93:1A
F4:2E:7F:CC:F5:C2
F4:2E:7F:CD:08:22
F4:2E:7F:CC:F1:E0
90:4C:81:CE:58:CE
90:4C:81:CE:05:32
90:4C:81:CE:04:36
90:4C:81:CE:04:BA
F4:2E:7F:CC:F0:A4
90:4C:81:CE:05:A4
F4:2E:7F:CC:F8:36
F4:2E:7F:CC:F2:64
F4:2E:7F:CC:F5:F6
F4:2E:7F:CC:F3:D6
F4:2E:7F:CC:F0:B4
90:4C:81:CE:04:5E
F4:2E:7F:CC:F0:84
F4:2E:7F:CC:F4:48
90:4C:81:CE:05:B4
F4:2E:7F:CC:F2:C8
90:4C:81:CE:03:FC
90:4C:81:CE:05:38
90:4C:81:CE:05:52
20:A6:CD:CF:93:38
20:A6:CD:CF:92:E8
F4:2E:7F:CC:F0:F2
F4:2E:7F:CC:F3:06
90:4C:81:CE:58:74
20:A6:CD:CF:91:EA
20:A6:CD:CF:96:D0
F4:2E:7F:CC:F4:50
Naming Convention:
First 3 or 4 letters designate a site.
Next letters after dash are the location.
Any AP with EXAP are external.
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Online Bidding Practice

General Information BAVN ID: 30751 Event ID: 180000910001 Bid Method: Line Items Category:

City of Los Angeles

Bid Due: 6/30/2037

EXT REC | CON27-0002 Harding ...

EXT REC | CON27-0002 Harding Bunker - SF First Events Search Event :

City and County of San Francisco

Bid Due: 12/31/2026