RFQ: Terminal Restroom Renovations
Project Information
- Bid Title
- RFQ: Terminal Restroom Renovations
- Issuing Agency
- Birmingham Airport Authority
- Location
- Alabama
- Published Date
- Jan 22, 2026
- Closing Date
- Feb 26, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
RFQ: Terminal Restroom Renovations (01/22/2026)
- Attachment Preview
-
Request for Qualifications (RFQ)Architectural and Construction Administration ServicesTerminal Restroom RenovationsBirmingham Airport AuthorityJanuary 2026I. IntroductionA. Project DescriptionThe Birmingham Airport Authority (BAA) is soliciting Statements of Qualifications (SOQ)and Project Proposals from qualified architectural firms (firms) for the design, bidding,and construction administration services associated with the proposed renovation of 14public restrooms (5 female, 5 male, and 4 family) within the terminal facility at BHM.See Exhibit A for approximate project limits.The selected firm shall be obligated to perform the necessary work through completionof construction and the closeout process for the project. This project is anticipated toreceive an Airport Improvement Program (AIP) grant from the Federal AviationAdministration (FAA). The selected firm will need to be familiar with the process andrequired documentation associated with the AIP grant process. This includes, but is notlimited to, FAA grant assurances, FAA airport design and construction standards, ADAdesign standards, state and local permitting requirements, as well as familiarization withother FAA Orders, Advisory Circulars (AC), and the National Environmental Policy Act(NEPA) process.B. Project BackgroundTerminal Restroom RenovationsThis project will provide design and construction administration services for the secondround of the Terminal Restroom Renovations project within the terminal facility at BHM.Our aim is to renovate 14 restrooms (5 female, 5 male, and 4 family) in vital need ofimprovement by addressing aging infrastructure and optimizing the respective layoutsfor better circulation.The goal of the project is to complete a full renovation including, but not limited to, newflooring, vents, fixtures, stalls, and lighting to each public restroom within the terminalfacility. Each restroom will be stripped to the studs and reconstructed with enhancedfixtures and features that meet ADA design standards and provide for an enhancedpassenger experience to the approximately 3 million passengers at BHM.This effort will complete BAA’s mission to fully modernize all public restrooms within theterminal, bringing them into conformity with current standards and enhancing theexperience for the flying community and their families.II. Scope of ServicesA. Goalsi. To enter into a contract with the most qualified architectural firm for professionalservices pertaining to the design and construction administration of the proposedrenovations to 14 public restrooms within the terminal facility at BHM.ii. To provide professional services to design, bid, and construct the proposedproject in FY 2026-2027.2iii. To issue bid-ready plans in early September 2026.B. Architectural Servicesi. Design Phase: Complete project design including preparation of architecturalreports and recommendations, as well as, preparing detailed plans,specifications, cost estimates, and project schedules (design and construction)ii. Bidding and Negotiation Phase: Advertising and securing bids, administering, andattending pre-bid conferences, analyzing bid results, negotiation for services,furnishing recommendations for award, and preparation of contract documentsiii. Construction Phase: Consultation and guidance during construction, as well asconstruction administration servicesiv. Project Closeout Phase: Services rendered after the completion of the projectincluding final inspections and preventative maintenanceIII. Submittal RequirementsA. Selection ProcessThis qualification-based selection process shall be in accordance with FAA AdvisoryCircular 150/5100-14E, Architectural, Engineering, and Planning Consultant Services forAirport Grant Projects.Award of this project would not preclude the awarded firm from future planning,environmental, design and/or construction services award with BAA. This applies to bothprime firms and subconsultants.A Statement of Qualifications (SOQ) and Project Proposal will be solicited from allinterested firms. The SOQ will allow the opportunity to provide data relating to theexperience and qualifications of the interested firm as it relates to the proposed project.The Project Proposal will include information to illustrate the firm’s categoryunderstanding, approach, and project management / communication plan.Firms may be interviewed. However, BAA reserves the right to select the highest rankedconsultant based solely upon submittals if sufficient information is included in the SOQand project proposals.B. Statement of Qualifications / Project ProposalPlease submit five (5) hard copies and one (1) electronic copy of your SOQ and ProjectProposal submittal to the address below.Contact:Ed Seoane, VP of PurchasingE-mail:eseoane@flybhm.comAddress:Birmingham Airport Authority Receiving Warehouse5500 Airline DriveBirmingham, AL 35212Hard copies may be shipped via U.S. Postal Service or any other reputable courier service(e.g., Federal Express, UPS, etc.). The electronic copy must be included with the hardcopies via a USB flash drive. Deliveries can also be made in-person to the BAA Office3located on the ground level of the Terminal Building (5900 Messer Airport Highway,Birmingham AL 35212).All questions associated with this RFQ must be submitted in writing via e-mail to EdSeoane at eseoane@flybhm.com by the deadline identified for questions/clarifications(see timeline). Questions related to the RFQ directed to any other BAA personnel may begrounds for disqualification.C. Statement of Qualifications / Project Proposal FormatRespondent’s SOQ and Project Proposal shall submitted together as one submittal nolonger than thirty (30) total pages of content (not including back / front cover, tabs /dividers, cover letter, or table of contents). Each page must not be larger than 8.5” x 11”.D. Statement of Qualifications Section RequirementsThe SOQ portion of the submittal must include the following sections:i.Firm Overview and Capability to Perform All Aspects of the Project: Detail theoverall structure of the firm and any unique operating characteristics that mayenhance the project’s overall success. This should include but is not limited to:information such as relevant services provided by firm, office locations, and totalnumber of employees providing relevant services.ii.Recent Company Experience in Relevant Projects: Discuss relevant servicescompleted at other comparable airports within the past five (5) years. This shouldinclude, but is not limited to: project location, start and completion date,description, outcome, quality, and applicability to BAA’s proposed project.Identify the firm’s role as either a prime or subconsultant and specificcontribution to the project. A point of contact for the project’s sponsor must alsobe included. References may be contacted, as necessary.iii. Personnel Qualifications: Discuss the professional qualifications and relevantexperience for key members of the project team (including sub consultants).Include how specific team members will contribute to the project’s overallsuccess. Provide organizational chart depicting project manager, deputy projectmanager, and other project team members in their respective roles. Workloadof project manager must also be identified.iv. Project Partners: Discuss any subconsultants intended to be included on theproject team, if any. Detail their expected contribution to the project and, ifapplicable, number of projects the prime consultant and subconsultant havepreviously completed or are nearing completion.E. Project Proposal Section RequirementsThe Project Proposal portion of the submittal must include the following sections:i.Project Approach: Discuss the Scope of Services and how the firm will provide thedesired services. Identify any potential challenges the firm anticipates during theproject. Identify and mitigate elements, if any, to minimize effects on airportusers and operations for the duration of desired sustainability studies.ii. Project Management / Communication Plan: Discuss any relevant informationwhich would detail how the firm would manage the project process including, but4not limited to, scope of work development, budget, and methodology of baselineanalysis. Prepare a proposed project schedule including major tasks and targetcompletion dates. Additionally, identify the firm’s plan for communicationthroughout the project to BAA.F. Statement of Qualifications / Project Proposal Evaluation CriteriaSOQs and Project Proposals will be evaluated and scored on a scale of 0 (lowest) to 100(highest). In the event SOQs and Project Proposals are not considered sufficient todetermine the highest ranked firms for either project, interviews will be conducted withup to the three (3) highest ranked firms. Additional interview scoring criteria will beprovided in advance of the interview date, if necessary. Each criterion and its portion ofthe maximum scoring value is listed below: Each criterion and its portion of the maximumscoring value is listed below:• Firm’s capability to perform all aspects of the project20/100• Firm’s recent experience in relevant projects15/100• Firm’s demonstration of personnel qualifications10/100• Firm’s proposed approach to the project30/100• Firm’s proposed project management plan15/100• Firm’s proposed communication plan10/100G. Tentative RFQ TimelineAll deadlines are by 2:00 P.M. Central Time on each respective date. Any late submittalswill not be accepted and immediately returned. There will be no deadline extensions inthe event of inclement weather delays.RFQ PostedPre-Submittal MeetingDeadline for SOQ Questions/ClarificationsSOQ DeadlinePotential Recommendation to AwardThursday, January 22nd, 2026Thursday, February 5th, 2026, at 2pmCentralThursday, February 12th, 2026, at 2pmCentralThursday, February 26th, 2026, at 2pmCentralMarch – April 20265
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Troubleshoot/Repairs to Rollu...
Sourcing Project Number: SRC0000034386 Solicitation Label: Troubleshoot/Repairs to Rollup Door at Gadsden MAS/Ira
State Government of Alabama
Bid Due: 7/15/2026
Housing Implementation & Inve...
Project ID: Title: Housing Implementation & Investment Proposal Addenda: 0 Release Date: 6/3/2026
City of Montgomery
Bid Due: 7/15/2026