TOHATCHI SUBSTATION IMPROVEMENTS
Project Information
- Bid Title
- TOHATCHI SUBSTATION IMPROVEMENTS
- Issuing Agency
- Navajo Tribal Utility Authority
- Location
- Arizona
- Published Date
- Mar 9, 2026
- Closing Date
- Apr 23, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
DOWNLOAD
TOHATCHI SUBSTATION IMPROVEMENTS
Date:
April 23, 2026,
at
5:00 p.m. (PDT)
- Attachment Preview
-
LEGAL ADVERTISEMENTFort Defiance, Apache County ArizonaNAVAJO TRIBAL UTILITY AUTHORITYINVITATION FOR BIDTOHATCHI SUBSTATION IMPROVEMENTSBids for the construction and improvements of an electrical substation, including the supply ofnecessary labor and equipment, will be received by the Navajo Tribal Utility Authority (NTUA).The project is titled Tohatchi Substation Improvements and is located approx. 1.5 miles south ofTohatchi, New Mexico in McKinley County (GPS coordinates: 35.831410, -108.763859).Key dates:1. Advertisement:March 06, 20262. Pre-Bid meeting (mandatory in-person): March 17, 2026 1:00 PM MDT3. Questions due:April 9, 2026 5:00 PM PDT4. Answers provided:April 16, 20265. Bids due:April 23, 2026 @ 5:00 PM PDT6. Evaluation of Bidder’s Proposals:April 27 – May 6, 20267. Execution of Contract:June 20268. Energization:July 2027Bidders are expected to be familiar with Rural Utility Service (RUS) rules and regulationspertaining to the construction of RUS electric system structures.Interested bidders may request electronic copies of the Construction Contract Package, asdescribed in Section five of the complete Invitation for Bid, at the office of the Engineer bycontacting Ray Johnson via email at: ray_johnson@selinc.com.Digital copies will be provided at no cost. Requesting a copy of the Construction Contractpackage will be deemed Bidder’s intent to bid.A mandatory pre-bid conference will be held at the office of NTUA, at the address listed below,at 1:00 P.M. Mountain Daylight Time (MDT), Tuesday, March 17, 2026.A site visit to the substation will occur after the meeting. Attendance at the site visit is optional;however, please note that flame-resistant clothing is required to enter within the existingsubstation fence. No bid will be accepted from any bidder who does not attend this pre-bidmeeting at the NTUA office. The official sign-in sheet, including a summary of the discussionsheld at the conference, will be provided to all attendees at the meeting by March 24, 2026 5:00PM MDT.NTUA will receive bids electronically at the office of the Engineer, SEL Engineering Services,Page 1 of 3Inc. 2350 NE Hopkins Court, Pullman, Washington 99163 at the email address:ray_johnson@selinc.comuntil April 23, 2026 at 5:00 PM, Pacific Daylight time (PDT). Bids received after this time willnot be accepted (hard copies of the bid not required).Each bidder must deposit with his bid, a security in the amount of the bid and subject to theconditions provided in the Instructions to Bidders. Attention is called to the requirements of aPower of Attorney of any surety bond and the fact that any surety must appear on the mostcurrent list of sureties listed by the United States Treasury Department as Acceptable Sureties.All bids must be on a unit price basis with a fixed fee total.NTUA reserves the right to waive any informality or reject any and all bids.Bids received will be evaluated by the Engineer on the following factors:Navajo Business and Procurement Act: Preference will be made in accordance with theNavajo Business and Procurement Act (12 N.N.C. § 1501 et seq.); the Navajo NationProcurement Act (12 N.N.C. § 301 et seq.); the Navajo Nation Business Opportunity Act(5 N.N.C. § 201 et seq.) and other applicable statutory and regulatory requirements.Bidders shall submit evidence of their Preference Priority Certification, if applicable.If no Preference Priority Certification: Cost: 30% Compliance with RUS requirements: 40% Bidder’s qualifications: 30%The commencement date of construction shall be no later than 60 days after approval of theContract by NTUA. Construction shall be completed before the energization date of July 31,2027. Liquidated damages of $500.00 per day may be assessed as provided for in Article V,Section 2 of the Contractor's proposal. Dates may be modified because of the weathernecessitated delays. Changes to this timeline requested by the bidder will be considered on acase-by-case basis.Any questions concerning the project should be addressed to:Engineer:SEL Engineering ServicesAttn: Ray Johnson2350 NE Hopkins CourtPullman, WA 99163Phone: (509) 338-3849Email: ray_johnson@selinc.comPage 2 of 3Owner:Navajo Tribal Utility AuthorityAttn: Harrisetta SandovalNorth Navajo Route 12 (GPS coordinates: 35.760645, -109.043663)Fort Defiance, AZ 86504Phone : 800.528.5011 ext. 2500Email: HarrisettaS@ntua.comEND OF LEGAL ADVERTISEMENTPage 3 of 3
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Pioneer Parkway Rubberized Ch...
Pioneer Parkway Rubberized Chip Seal in Yavapai County, AZ - Project #1619226 See
Yavapai County
Bid Due: 7/20/2030