25-013 Bonnie Brae Water Main Relocation and Replacement Project – Phase I

Project Information

Bid Title
25-013 Bonnie Brae Water Main Relocation and Replacement Project – Phase I
Issuing Agency
Temple Terrace city
Location
Florida
Published Date
Oct 31, 2025
Closing Date
Dec 5, 2025
Government Level
State & Local
Status
Closed
Ref. #
25-013
Original Source
Join to Access Full Details
Project Description
Bid Number: 25-013
Bid Title: 25-013 Bonnie Brae Water Main Relocation and Replacement Project – Phase I
Category: 25-013 Bonnie Brae Water Main Relocation and Replacement Project – Phase I
Status: Open
Bid Recipient: City of Temple Terrace Purchasing Department purchasing@templeterrace.com
Description:

Relocate water lines from rear yard easements to public ROWs; install 3,500 LF of 6-inch C900 PVC on Glen Ridge, Park Ridge, Forest Park, and Deer Park; abandon 5,900 LF of old mains (grout-filled); relocate 55 services to new mains.

Submittal Info:

Sealed bids (proposals) received via email by the City of Temple Terrace Purchasing Department at For security reasons, you must enable JavaScript to view this E-mail address. until 2:30 PM EST, Nov 4, 2025.

Bid Opening Info:

Public opening (virtual) at 3:30 PM EST, Nov 25, 2025. GoTo link (from ad): https://meet.goto.com/CoTT-online-meeting/25-013virtualbid-bonniebraewatermainrelocationan Dial-in: +1 (224) 501-3412 | Access Code: 705-403-021

Pre-bid Meeting:

Non-mandatory Information Conference (virtual): 10:00 AM, Oct 16, 2025.

GoTo link (from ad): https://meet.goto.com/CoTT-online-meeting/25-013pre-bid-bonniebraewatermainrelocationandrepl

Dial-in: +1 (571) 317-3122 | Access Code: 286-395-517

Fee:

(No fee stated in the Advertisement for Bids; downloads via DemandStar/City website.)

Addendum Date:

TBD. Addenda will be issued via DemandStar and the City’s website per the Advertisement for Bids.

Publication Date/Time:
9/9/2025 12:00 AM
Closing Date/Time:
12/5/2025 11:59 PM
Submittal Information:
Via email: purchasing@templeterrace.com until 2:30 PM EST, Nov 25, 2025
Bid Opening Information:
Virtual at 3:30PM EST, Nov 25
Addendum Date/Time:
TBD
Contact Person:
Purchasing Department purchasing@templeterrace.com (listed in the Advertisement for Bids as the submittal recipient)
Download Available:
Yes
Fee:
None
Plan & Spec Available:
Yes, available electronically via DemandStar and the City’s website.
Plan Holders List:
If obtained from the City website, you will not be listed on the plan holders list and may not receive addenda notifications; DemandStar tracks plan holders.
Qualifications:
Bidders must be certified/registered as a General Contractor or Underground Utility & Excavation Contractor under Chapter 489, F.S., continuously for =3 years prior to bid; submit copy of license. Prime must self-perform =51% of total contract value.
Special Requirements:
Bid security: = 5% of bid (certified check or bid bond).
Performance & payment bonds: 100% of Contract Price.
Contract time: 210 calendar days; LDs: $1,000/day after time expires.
Contractor registration: Must be registered with City Community Development; provide Florida DBPR contractor card prior to starting work.
Related Documents:
Attachment Preview
CITY OF TEMPLE TERRACE
BID # 25-013
BONNIE BRAE WATER MAIN
RELOCATION AND REPLACEMENT PROJECT PHASE I
HILLSBOROUGH COUNTY, FLORIDA
August 2025
5601 Mariner Street
Suite 105
Tampa, FL 33609
Ph. 813.288.0233
THIS PAGE INTENTIONALLY LEFT BLANK
Bid #25-013
August 2025
CONTRACT DOCUMENTS
For
BONNIE BRAE WATER MAIN
RELOCATION AND REPLACEMENT PEOJECT
PHASE I
For
CITY OF TEMPLE TERRACE
TEMPLE TERRACE, FLORIDA
Prepared by:
CPH CONSULTING LLC.
TAMPA, FLORIDA
INDEX
TO
PROJECT MANUAL
CITY of TEMPLE TERRACE
Bid #25-013
BONNIE BRAE WATER MAIN
RELOCATION AND REPLACEMENT PROJECT
PHASE I
CPH Project No. T13010
August 2025
DIVISION 0 - BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF
THE CONTRACT
SECTION A ADVERTISEMENT FOR BID..............................................................................................................A-1
SECTION B INSTRUCTION TO BIDDERS ........................................................................................................... B-1
B-1: Delivery of Proposals...............................................................................................................................................B-1
B-2: Proposal Forms .......................................................................................................................................................B-1
B-3: Irregular Proposals ..................................................................................................................................................B-1
B-4: Signature on Proposals.............................................................................................................................................B-2
B-5: Examination of Contract Documents ......................................................................................................................B-2
B-6: Examination of Site ................................................................................................................................................B-2
B-7: Discrepancies...........................................................................................................................................................B-3
B-8: Interpretation of Plans..............................................................................................................................................B-3
B-9: Interpretation of Plans and Contract Documents Prior to Opening of Bids.............................................................B-3
B-10: Time of Completion & Liquidated Damages.........................................................................................................B-3
B-11: Labor Regulations .................................................................................................................................................B-4
B-12: Certified Check or Bid Bond.................................................................................................................................B-4
B-13: Return of Certified Checks....................................................................................................................................B-4
B-14: Contract Bond or Performance Bond.....................................................................................................................B-4
B-15: Qualification of Bidders ........................................................................................................................................B-5
B-16: Disqualification of Bidders....................................................................................................................................B-5
B-17: Equipment and Subcontractors..............................................................................................................................B-5
B-18: Withdrawal of Proposal.........................................................................................................................................B-6
B-19: Owner's Rights Reserved ......................................................................................................................................B-6
B-20: Public Entity Crime Statement...............................................................................................................................B-6
SECTION C GENERAL CONDITIONS
C-1
C-1: Definitions
C-1
C-2: Award, Execution of Documents, Delivery of Bonds, etc.
C-2
C-3: Progress and Submission Schedules; Preconstruction Conference; Time of Starting the Work
C-3
C-4: Correlation, Interpretation and Intent of Contract Documents
C-3
C-5: Ownership and Copies of Documents; Record Documents
C-4
C-6: Work by Others
C-4
C-7: Subcontracts
C-5
C-8: Materials, Equipment and Labor Substitute Material or Equipment
C-6
C-9: Patent Fees and Royalties
C-7
C-10: Permits, Laws, Taxes and Regulations.................................................................................................................C-7
C-11: Availability of Lands; Physical and Subsurface Conditions; Reference Points................................................... C-7
C-12: Use of Premises ........................................................................................................... ......................................... C-8
C-13: Engineer's Status During Construction ................................................................................................................ C-9
C-14: Engineer's Interpretations and Decisions ............................................................................................................. C-9
C-15: Shop Drawings and Samples .............................................................................................................................. C-10
C-16: Tests and Inspections ......................................................................................................................................... C-11
C-17: Contractor's Supervision & Superintendence .................................................................................................... C-11
C-18: Safety & Protection: Emergencies ..................................................................................................................... C-12
C-19: Access to the Work/Uncovering Finished Work ............................................................................................... C-13
C-20: Changes in the Work .......................................................................................................................................... C-14
C-21: Changes of Contract Price .................................................................................................................................. C-14
C-22: Cash Allowances ......................................................................................................... ....................................... C-15
C-23: Change of the Contract Time ............................................................................................................................. C-16
C-24: Neglected Work.................................................................................................................................................. C-16
C-25: Warranty & Guarantee: Correction, Removal or Acceptance of Defective Work ............................................ C-16
C-26: Applications for Progress Payments .................................................................................................................. C-17
C-27: Approval of Payments ........................................................................................................................................ C-18
C-28: Substantial Completion ...................................................................................................................................... C-19
C-29: Partial Utilization ............................................................................................................................................... C-19
C-30: Final Payment ........................................................................................................... ......................................... C-20
C-31: Waiver of Claims & Continuing Obligations .................................................................................................... C-21
C-32: Indemnification .................................................................................................................................................. C-21
C-33: Contract Bonds ............................................................................................................ ....................................... C-22
C-34: Contractor's Liability Insurance ......................................................................................................................... C-22
C-35: Owner's Indemnity ............................................................................................................................................. C-23
C-36: Property Insurance ............................................................................................................................................. C-23
C-37: Cleaning Up .............................................................................................................. ......................................... C-23
C-38: Owner's Right to Stop or Suspend Work ........................................................................................................... C-23
C-39: Owner's Right to Terminate................................................................................................................................ C-24
C-40: Contractor's Right to Stop Work or Terminate .................................................................................................. C-24
C-41: Dispute Resolution.............................................................................................................................................. C-25
C-42: Miscellaneous ..................................................................................................................................................... C-25
C-43: Builder's Risk ..................................................................................................................................................... C-25
C-44: Overtime Work .................................................................................................................................................. C-26
SECTION C-C SUPPLEMENTARY GENERAL CONDITIONS ........................................................ C-27 TO C-28
SECTION D FEDERAL FUNDING NOT INCLUDED
SECTION E BID (PROPOSAL) ..................................................................................................................E-1 TO E-14
SECTION F BID BOND ................................................................................................................................. F-1 TO F-2
SECTION G CONTRACT ............................................................................................................................ G-1 TO G-2
SECTION H CONTRACT BOND ................................................................................................................ H-1 TO H-2
SECTION I BID PROTEST ............................................................................................................................. I-1 TO I-2
SECTION SC SPECIAL CONDITIONS ................................................................................................................. SC-1
Standard Specifications ............................................................................................................................................... SC-1
Construction Staking ................................................................................................................................................... SC-1
Materials...................................................................................................................................................................... SC-1
Laboratory Testing ...................................................................................................................................................... SC-1
Measurement and Payment ......................................................................................................................................... SC-1
Commodity Codes
  • NAICS 237110Water and Sewer Line and Related Structures Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Orange County Corrections Dep...

Project ID: Y25-790-RC Title: Orange County Corrections Department Female Detention Center Two Cell

Orange County

Bid Due: 7/14/2026

Deerfield Island ADA Dock

Project: Deerfield Island ADA Dock Ref. #: PNC2132293C1 Department: FASD - Purchasing Type:

Broward County

Bid Due: 7/15/2026