Public Improvements at County Line Road and Old Highway 20
Project Information
- Bid Title
- Public Improvements at County Line Road and Old Highway 20
- Issuing Agency
- City of Huntsville
- Location
- Alabama
- Published Date
- Apr 1, 2026
- Closing Date
- Apr 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Project No. 71-26-SP21
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Public Improvements at County Line Road and Old Highway 20 Project No. 71-26-SP21
Pre-Bid Meeting will be held on Wednesday, April 8, 2026, at 10:00 a.m. CST and the Bid Opening will be held on Friday, April 17, 2026, at 10:00 a.m. CST.
Both meetings will be held at City Hall, in Training Room 624, located at 305 Fountain Circle, Huntsville, AL 35801.
NOTE: Project name has been changed from Road Improvements at Old Highway 20 and County Line Road to Public Improvements at County Line Road and Old Highway 20.
Attached FilesBid ContactsFile Description NPDES Permit Download Quantities-Attachment A Download Huntsville Utilities Water ATC Download Athens Electric ATC Download Traffic Engineering General Traffic Signal Hardware Design Features Download Specifications Download Drawings Download Advertisement Download Name Job Title Alan Clements Project Engineer Mary Ridgeway Engineering Procurement & Contracts Coordinator - Attachment Preview
-
EDWARD F. POOLOSDIRECTORJEFFERY W. KITCHENSDEPUTY DIRECTORJanuary 20, 2026TIMOTHY KUYKENDALLFOOD CITY KVAT FOODS1 FOOD CITY CIR EABINGDON, VA 24210-1100Alabama Department of Environmental Managementadem.alabama.gov1400 Coliseum Blvd. 36110-2400 ■ Post Office Box 301463Montgomery, Alabama 36130-1463(334) 271-7700 ■ FAX (334) 271-7950KAY IVEYGOVERNORDear Mr. Kuykendall:Based on your Notice of Intent (NOI), coverage under the Construction Stormwater General NPDES Permit is granted.Construction Stormwater General NPDES Permit - INITIAL ISSUANCENPDES Permit No.: ALR10C7NNNOI Received Date: January 15, 2026Permit Effective Date: January 20, 2026Permit Expiration Date: March 31, 2026Site/Project: Food City County Line Road (Limestone County)Coverage under this permit does not authorize the discharge of any pollutant or wastewater that is not specifically identifiedin the permit and by the Notice of Intent.You are responsible for compliance with all provisions of the permit including, but not limited to, the performance ofrequired inspections and/or monitoring, and the preparation and implementation of a Construction Best ManagementPractices Plan (CBMPP) required by the permit.The Alabama Department of Environmental Management encourages you to exercise pollution prevention practices andalternatives at your facility. Pollution prevention will assist you in complying with permit requirements.Prior to commencing land disturbance activities, the Department encourages you to view the video “Most CommonCompliance Issues at Construction Sites” on the ADEM webpage at https://www.youtube.com/watch?v=xG-SIlJ2Mgc.A copy of the General NPDES Permit under which coverage of your discharges has been granted is enclosed as well as aFacility Identification sign for your use as required by Part IV.T. of the permit. If you have any questions concerning thispermit, please contact Tamara Crutchley by email at tamara.crutchley@adem.alabama.gov or by phone at (334) 271-7762.Sincerely,Daphne Y. Lutz, ChiefWater DivisionADEMNATIONAL POLLUTANTDISCHARGE ELIMINATION SYSTEMGENERAL PERMITDISCHARGE AUTHORIZED:DISCHARGES FROM CONSTRUCTION ACTIVITIES THAT RESULT IN ATOTAL LAND DISTURBANCE OF ONE ACRE OR GREATER AND SITESLESS THAN ONE ACRE BUT ARE PART OF A COMMON PLAN OFDEVELOPMENT OR SALEAREA OF COVERAGE:THE STATE OF ALABAMAPERMIT NUMBER:ALR10C7NNRECEIVING WATERS:ALL WATERS OF THE STATE OF ALABAMAIn accordance with and subject to the provisions of the Federal Water Pollution Control Act, as amended, 33U.S.C. §§1251-1378 (the "FWPCA'J, the Alabama Water Pollution Control Act, as amended, Code of Alabama1975, §§ 22-22-1 to 22-22-14 (the "AWPCA'J , the Alabama Environmental Management Act, as amended, Codeof Alabama 1975, §§22-22A-1 to 22-22A-15, and rules and regulations adopted thereunder, and subject furtherto the terms and conditions set forth in this permit, the Permittee is hereby authorized to discharge into theabove-named receiving waters.ISSUANCE DATE:March 12, 2021EFFECTIVE DATE:April 1, 2021EXPIRATION DATE: March 31, 2026Alabama Department of Environmental ManagementTable of ContentsPART I: Coverage Under This General Permit ....................................................................................................................................1A. Permit Coverage ...........................................................................................................................................................................1B. Eligibility .......................................................................................................................................................................................1C. Exempt Discharges........................................................................................................................................................................2D. Prohibited Discharges...................................................................................................................................................................2PART II: Notice of Intent (NOI) Requirements ....................................................................................................................................3A. Deadlines for Notices of Intent......................................................................................................................................................3B. Continuation of the Expired General Permit ................................................................................................................................3C. Contents of the Notice of Intent (NOI) ..........................................................................................................................................3D. Submittal of Documents ................................................................................................................................................................4E. Additional Permittees (Co-Permittee) Under a Single NOI..........................................................................................................4F. Authorization to Discharge ...........................................................................................................................................................4PART III: Stormwater Pollution Prevention Requirements................................................................................................................6A. Erosion Controls and Sediment Controls......................................................................................................................................6B. Provide Natural Riparian Buffers or Equivalent Sediment Controls ...........................................................................................8C. Soil Stabilization ...........................................................................................................................................................................9D. Pollution Prevention Measures .....................................................................................................................................................9E. Construction Best Management Practices Plan (CBMPP).........................................................................................................10F. Spill Prevention, Control, and Management...............................................................................................................................12G. Training.......................................................................................................................................................................................12H. Inspection Requirements .............................................................................................................................................................13I. Corrective Action ........................................................................................................................................................................14J. Suspension of Monitoring............................................................................................................................................................14K. Precipitation Measurement .........................................................................................................................................................15L. Impaired Waters and Total Maximum Daily Load (TMDL) Waters...........................................................................................15PART IV: Standard and General Permit Conditions .........................................................................................................................17A. Duty to Comply............................................................................................................................................................................17B. Duty to Reapply ...........................................................................................................................................................................17C. Need to Halt or Reduce Activity Not a Defense ..........................................................................................................................17D. Duty to Mitigate ..........................................................................................................................................................................17E. Proper Operation and Maintenance ...........................................................................................................................................17F. Permit Modification, Revocation and Reissuance, Suspension, and Termination......................................................................17G. Property Rights ...........................................................................................................................................................................18H. Duty to Provide Information .......................................................................................................................................................18I. Inspection and Entry ...................................................................................................................................................................18J. Noncompliance Notification........................................................................................................................................................19K. Retention of Records ...................................................................................................................................................................19iL. Signatory Requirements ..............................................................................................................................................................19M. Transfers......................................................................................................................................................................................19N. Bypass..........................................................................................................................................................................................19O. Upset............................................................................................................................................................................................19P. Severability..................................................................................................................................................................................20Q. Issuance of an Individual Permit ................................................................................................................................................20R. Request for Individual Permit by General Permit Holder ..........................................................................................................20S. Termination of Coverage ............................................................................................................................................................20T. Facility Identification ..................................................................................................................................................................20U. Schedule of Compliance ..............................................................................................................................................................20V. Discharge of Wastewater Generated by Others..........................................................................................................................21W. Compliance with Water Quality Standards and Other Provisions .............................................................................................21X. Civil and Criminal Liability ........................................................................................................................................................21Y. Oil and Hazardous Substance Liability ......................................................................................................................................21Z. Availability of Reports.................................................................................................................................................................21AA. Coastal Zone Management for Baldwin and Mobile Counties ...................................................................................................21BB. Removed Substances ...................................................................................................................................................................21CC. Compliance with Statutes and Rules ...........................................................................................................................................22PART V: Definitions...............................................................................................................................................................................23iiPART I: Coverage Under This General PermitA.Permit CoverageThis permit authorizes, subject to the conditions of this permit, discharges associated with construction activity that will resultin land disturbance equal to or greater than one (1) acre or from construction activities involving less than one (1) acre andwhich are part of a common plan of development or sale equal to or greater than one (1) acre occurring on or before, andcontinuing after the effective date of this permit, except for discharges identified under Part I.C. of the permit.B.Eligibility1. Allowable Stormwater DischargesThis permit authorizes the following stormwater discharges:(a) Stormwater associated with construction activities defined in Part I.A. of this permit;(b) The following stormwater discharges have been determined by the Director to require coverage under this permit:(i) Sites, irrespective of size, whose stormwater discharges have a reasonable potential to be a significant contributorof pollutants to a water of the State, as determined by the Department;(ii) Sites, irrespective of size, whose stormwater discharges have a reasonable potential to cause or contribute to aviolation of an applicable Alabama water quality standard as determined by the Department.(c) Discharges from construction support activities provided:(i) The support activity is solely related to the construction site covered under this permit;(ii) The support activity is not an operation serving multiple unrelated construction projects and does not operatebeyond the completion of the construction activity at the construction project it supports;(iii) The support activity is located in close proximity (two-mile radius) to the construction site covered under thispermit, or as otherwise approved by the Department;(iv) Stormwater controls are implemented in accordance with Part III for discharges from the support activity area;and(v) Pollutant discharges from support activity areas are minimized to the maximum extent practicable and do notpose a reasonable potential to exceed applicable water quality standards.2. Allowable Non-Stormwater DischargesThis permit authorizes the following non-stormwater discharges provided the non-stormwater component of the dischargeis in compliance with Part III.D.:(a) Discharges from fire-fighting activities;(b) Fire hydrant flushings;(c) Water used to wash vehicles and equipment where detergents are not used;(d) Water used to control dust;(e) Potable water including uncontaminated water line flushings not associated with hydrostatic testing;(f) Routine external building wash down associated with construction that does not use detergents;(g) Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilledmaterial has been removed) and where detergents are not used. The operator is prohibited from directing pavementwash waters directly into any surface water, storm drain inlet, or stormwater conveyance, unless the conveyance isconnected to a sediment basin, sediment trap, or similarly effective control;(h) Uncontaminated air conditioning or compressor condensate associated with temporary office trailers and other similarbuildings;(i) Uncontaminated, non-turbid discharges of ground water or spring water;(j) Foundation or footing drains where flows are not contaminated with process materials such as solvents; and(k) Landscape irrigation.Page 1 of 26
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 238910Site Preparation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
117th ARW Alert Pad Crack Rep...
Follow 117th ARW Alert Pad Crack Repairs Active Contract Opportunity Notice ID W50S6M26QA013
DEPT OF DEFENSE
Bid Due: 7/30/2026
BWT Site Office Sources Sought
Follow BWT Site Office Sources Sought Active Contract Opportunity Notice ID W9127826RA087 Related
Federal Agency
Bid Due: 7/07/2026