Water Management Renovations at Pocotaligo Preserve

Project Information

Bid Title
Water Management Renovations at Pocotaligo Preserve
Issuing Agency
Beaufort County
Location
South Carolina
Published Date
Nov 3, 2025
Closing Date
Dec 10, 2025
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description


Project ID:

Title: Water Management Renovations at Pocotaligo Preserve

Addenda: 0

Release Date: 11/3/2025

Due Date: 12/10/2025

Post Information
Posted At:Mon, Nov 3, 2025 11:03 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

Beaufort County’s Land Preservation Department is seeking qualified contractors to renovate several water management features located within and associated with historic rice fields on Pocotaligo Preserve. The property is located in Yemassee, South Carolina, and has entrances off of US Hwy 17 and on Cotton Hall Rd. This is phase 1 of a multi-staged design/build renovation process of these former inland rice fields. The fields have reverted to a natural state due to dated water control structures and dikes, which are now tidally influenced. The goal of phase 1 renovations is to improve water exchange and to promote drainage in canals associated with the system. Another goal is to renovate a historic dike and install a water control structure to create a drainage impoundment to improve water circulation in the fields. Proposers should utilize the project information provided as the basis to clarify their proposals. The County has already obtained a Managed Tidal Impoundment General Permit from the U.S. Army Corps of Engineers for the proposed water management structure renovations. Any additional permitting will be completed by the County and their management consultant.

Background

Contractor will provide all necessary equipment (excavators, trucks etc.), materials, manpower and transportation required for timely completion of project.

Contractor will utilize designated ingress and egress route (s) and construction and staging area for project. All refueling and routine equipment maintenance shall be done at the staging area. Staging area and construction site will be protected by appropriate safety fencing (standard orange mesh) along with appropriate signage. Equipment travel corridors shall be adequately marked for safety.

Trees and shrubs identified for removal (by flagging or painting) shall be removed and transported to a disposal area. Stumps, root balls, large roots and other woody debris (including chips and mulch) shall be removed from the project area during the process. Stump holes and other disturbed areas shall be filled and packed with offsite soil prior to final re-contouring. Organic material such as roots and stumps shall not be placed on the dike.

All unnatural material removed during the construction process will be loaded and taken to an offsite disposal area. Example of this material is asphalt, concrete, creosote lumber, metal debris, plastic debris, and old WCS.

At completion all fill on dikes and roadways to be sufficiently compacted to allow for immediate travel by vehicles and equipment.

All work shall be done during dry conditions to prevent rutting and ground disturbance. This includes movement of heavy equipment, storage of materials, and other activities that could cause ground disturbance. Rutting and ground disturbance shall not be tolerated.

Upon completion, disturbed soils will be seeded with an approved ground cover planting. Silt fencing will be placed along disturbed areas of the dike to reduce erosion of bare earth during ground cover establishment.

If any archaeological resources or remains found, then work will be stopped and assessed by a professional archaeologist.

Contractor will provide the names of 3 references for recent work of similar style.

All work shall be guaranteed for one year after the completion of the project.

Timeline
Proposal Release Date:
November 3, 2025
Pre-Proposal Meeting (Non-Mandatory):
November 19, 2025, 2:00pm
Please email gmurray@bcgov.net for your TEAMS invitation
Question Submission Deadline:
December 3, 2025, 5:00pm
Closing Date And Time:
December 10, 2025, 3:00pm
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 237110Water and Sewer Line and Related Structures Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

CIP-2411 Penn Center Waterlin...

Project: CIP-2411 Penn Center Waterline Replacement Ref. #: 2026-IFB-025 Type: IFB Status: Open

Beaufort - Jasper Water & Sewer Authority

Bid Due: 6/24/2026

Johns Island Recreation Cente...

Ad Title: Johns Island Recreation Center- RFQ for Testing and Inspection Services Purchasing

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/22/2026