Horizon Elementary - Replace Chiller Bldg. 11
Project Information
- Bid Title
- Horizon Elementary - Replace Chiller Bldg. 11
- Issuing Agency
- Volusia County Schools
- Location
- Florida
- Published Date
- Feb 4, 2026
- Closing Date
- Feb 19, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Project No. 2648221
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Horizon Elementary - Replace Chiller Bldg. 11 - Project No. 2648221
Mandatory Prebid Meeting: February 4, 2026 at 10:00 AM Bid: February 19, 2026 at 1:00 PM Project Bid Documents: Plans
Project Manual
Prebid Sign-in SheetsEstimate: $325,000 Consultant: BCER Engineering, Inc.
Joe Berkebile
(321) 241-4142Owner: VCS Project Manager
Robert Larkin
(386) 947-8786Bid Status: Active - Attachment Preview
-
VOLUSIACOUNTY SCHOOLS"LEADING WITH GRACE AND RESPECT"THE SCHOOL BOARD OF VOLUSIACOUNTY FLORIDA200 North Clara AvenueDeLand, Florida 32720HORIZON ELEMENTARYREPLACE CHILLERBLDG. 11VCS Project NO. 26482214751 Hidden Lake Dr., Port Orange, FL 32129DESCRIPTION OF WORKREPLACE THE CHILLER, PIPING AND ACCESSORIES EXTERIOR OF THE BUILDING.Engineer's Statement of ComplianceTo the best of my knowledge, these drawings and the project manual are complete and comply withthe Florida Building Code.BUILDING DATAA. SURVEY PARCEL IDB. LEGAL DESCRIPTIONC. OCCUPANCY TYPED. CONSTRUCTION TYPEE. RISK CATEGORYF. AUTOMATIC SPRINKLERG. BUILDING AREAH. BUILDING HEIGHTI. OCCUPANT LOADXXXXXXXXXTYPE XXXXXXXXXXXXXXXXXXLOCATION MAPENGINEERS & CONSULTANTSMECHANICAL & ELECTRICALBCER ENGINEERING, INC.6555 N. Wickham Rd, Suite 104Melbourne, FL 32940727.800.7314DAVID WALLACEdwallace@bcer.comwww.bcer.comBCER PROJECT 145425001DRAWING LIST00 - GENERALG000COVER SHEET23 - MECHANICALM001MECHANICAL GENERAL INFORMATIONM002MECHANICAL SCHEDULESMD101 LEVEL 1 MECHANICAL DEMOLTION PLANM101LEVEL 1 MECHANICAL PLANM501MECHANICAL DETAILS26 - ELECTRICALE001ELECTRICAL GENERAL INFORMATIONE002ELECTRICAL PROJECT NOTESED101LEVEL 1 POWER DEMOLITION PLANE101LEVEL 1 POWER PLANE601ELECTRICAL ONE-LINE DIAGRAMTOTAL # OF SHEETS: 11SCHOOL BOARDMEMBERSJAMIE HAYNESRUBEN COLONKRISTA GOODRICHJESSIE THOMPSONDONNA BROSEMERDR. CARMEN J. BALGOBINBOARD CHAIRVICE BOARD CHAIRMEMBERMEMBERMEMBERSUPERINTENDENTBCER PROJECT 145425001PROGRESS - NOT FORCONSTRUCTIONNOT TO SCALEConstruction Documents 11.12.2025ARCH/ENGR OF RECORDEORBCER EngineeringDESIGNED BYBCERDRAWN BYBCERISSUE DATE11/12/2025AE PROJECT NUMBER145425001SHEET TITLECOVER SHEETDRAWING NO.G000AFFAPBBDBODBOPCL EL.DIA, D, ØEAI.E.MAMDMVDNCNICNOOARARELSAMECHANICAL LEGENDALL SYMBOLS IN LEGEND MAY NOT NECESSARILY BE USED ON THIS PROJECTABBREVIATIONS AND DESCRIPTIONSABOVE FINISHED FLOORACCESS PANELBAROMETRICBACKDRAFT DAMPERBOTTOM OF DUCTBOTTOM OF PIPECENTER LINE ELEVATIONDIAMETEREXHAUST AIRINVERT ELEVATIONMIXED AIRMOTORIZED DAMPERMANUAL VOLUME DAMPERNORMALLY CLOSEDNOT IN CONTRACTNORMALLY OPENOUTSIDE AIRRETURN AIRRELIEF AIRSUPPLY AIRTCEADTCOADTCRADTCPTYPUNOVTR(N)(E)(R)(F)TEMPERATURE CONTROLEXHAUST AIR DAMPERTEMPERATURE CONTROLOUTSIDE AIR DAMPERTEMPERATURE CONTROLRETURN AIR DAMPERTEMPERATURE CONTROLPANELTYPICALUNLESS NOTED OTHERWISEVENT THROUGH ROOFNEWEXISTINGRELOCATEDFUTUREEXISTING WORK ISSHOWN AS LIGHT LINESTO BE DEMOLISHED WORKIS SHOWN WITH BOLDDASHED LINESNEW WORK IS SHOWN ASBOLD SOLID LINESEQUIPMENTTERMINALOR VAV BOXTB-1036501.2NINDICATES SUPPLYX#AND RETURNPIPING TO UNIT#HEATING COILTRANSITION TOSIZE ON PLANSCONTROLENCLOSURECONTROL/COILACCESSEQUIPMENT TYPEFLOOR #__IF MULTIPLEBOX ##__CFMGPMNORTH ARROW#X-#HX-##X-####SHEET METAL FITTINGS AND EQUIPMENTSUPPLY ROUND DUCT DOWNSUPPLY ROUND DUCT UPRETURN ROUND DUCT DOWNRETURN ROUND DUCT UPEXHAUST ROUND DUCT DOWNEXHAUST ROUND DUCT UPSUPPLY DUCT DOWNSUPPLY DUCT UPRETURN DUCT DOWNRETURN DUCT UPEXHAUST DUCT DOWNEXHAUST DUCT UPRADIUS ELBOWVANED ELBOWDUCT END CAPRECTANGULAR 90° TAKEOFFWITH BEVELED TAPROUND 90° CONICAL TAKE OFFFROM RECTANGLE TRUNKROUND 90° CONICAL TAKE OFFW/ MANUAL VOLUME DAMPERROUND DUCT TAP OFFTOP OF DUCTBEVELED TAP OFF TOPFOF DUCTSUPPLY AIR DIFFUSERRETURN OR EXHAUSTREGISTER/GRILLEUNSHADED AREASINDICATE DIRECTION OFAIR FLOW (IF NO SHADING,4-WAY OR ADJUSTABLE)UCLINEAR SLOT DIFFUSERCEILING AIR DEVICEWITH FIRE DAMPERMANUAL VOLUME DAMPERRECTANGLE DUCTRISE/DROP IN PLANRECTANGLE TO ROUNDTRANSITIONROUND DUCT RISE/DROPIN PLANBURIED, UNDERFLOOROR UNDER DUCTMBDSFS#-#F#-#S#-#MOTORIZED DAMPERMOTORBACKDRAFT DAMPERDUCT SMOKE DETECTORFIRE/SMOKE DAMPER (#REFERS TO SCHEDULE)FIRE DAMPERSMOKE DAMPERFLEXIBLE DUCTFLEXIBLE DUCTCONNECTIONWORK NOTE SYMBOLREVISION SYMBOLAND CLOUDDIRECTION OF CUTSECTIONDESIGNATIONSHEET ON WHICHSECTION IS LOCATEDELEVATIONDESIGNATIONDIRECTION OF VIEWSHEET ON WHICHELEVATION IS LOCATEDPOINT OF CONNECTIONNEW TO EXISTINGSHEET ON WHICHDETAIL IS LOCATEDDETAIL NUMBERBREAK LINECONTINUANCE LINEUNIT HEATERBASEBOARD HEATERACCESS PANELSOUND ATTENUATORDOOR UNDERCUTAIR FLOW - POSITIVEPRESSUREAIR FLOW - RETURNOR EXHAUSTAIR FLOW DIRECTIONFANFANCONTROL WIRECDCDWCSCRCWSCWRDFOSFORFOVGHWSHWRHRSHRRHPSHPRLPSLPRMPSMPRPWSPWRRLRSRHGCONDENSATE DRAINCONDENSER WATER(COMMON)CONDENSER WATER SUPPLYCONDENSER WATER RETURNCHILLED WATER SUPPLYCHILLED WATER RETURNDRAINFUEL OIL SUPPLYFUEL OIL RETURNFUEL OIL VENTGASHEATING WATER SUPPLYHEATING WATER RETURNHEAT RECOVERY SUPPLYHEAT RECOVERY RETURNHIGH PRESSURE STEAMHIGH PRESSURE STEAM(CONDENSATE) RETURNLOW PRESSURE STEAMLOW PRESSURE STEAM(CONDENSATE) RETURNMEDIUM PRESSURE STEAMMEDIUM PRESSURE STEAM(CONDENSATE) RETURNPRE-COOLING WATER SUPPLYPRE-COOLING WATER RETURNREFRIGERANT LIQUIDREFRIGERANT SUCTIONREFRIGERANT HOT GASFSFLOW SWITCHFTFLOW TRANSMITTERHHUMIDITY SENSORPPRESSURE SENSORPDSPRESSURE DIFFERENTIALSWITCHPDTPRESSURE DIFFERENTIALTRANSMITTERPIPOSITION INDICATORDPMROOM PRESSUREMONITORPIPING DESIGNATIONS, FITTINGS AND EQUIPMENTSMSSMRNPCWSCWSNOWMELT SUPPLYSNOWMELT RETURNNON-POTABLE WATERPOTABLE COLD WATERSOFT COLD WATERARROW PARALLEL TO LINEINDICATES PITCHARROW IN LINE INDICATESDIRCTION OF FLOWPIPE REDUCERELBOW UPELBOW DOWNTEE UPTEE DOWNRISE OR DROPBRANCH SIDE CONNECTIONBRANCH TOP CONNECTIONBRANCH BOTTOMCONNECTIONPIPE CAP OR PLUGFLEXIBLE CONNECTIONEXPANSION JOINTPIPE ANCHORPIPE ALIGNMENT GUIDEEXPANSION LOOPBALL VALVECALIBRATED BALANCE VALVEPLUG VALVENEEDLE VALVESOLENOID VALVEPRESSURE REDUCING VALVE2-WAY CONTROL VALVE3-WAY CONTROL VALVECHECK VALVEGLOBE VALVEBUTTERFLY VALVEBALANCING VALVECIRCUIT SETTERGATE VALVE FOR STEAMUNIONPIPE ANCHORPIPE ALIGNMENT GUIDE2-WAY VALVEPRESSURE INDEPENDENTVALVEGAS PRESSURE REGULATORGAS COCKMMETERVENTURICONTROL DEVICESPSHPRESSURE SWITCH HIGHPSLPRESSURE SWITCH LOWHUMIDIFIERPARALLEL BLADE DAMPEROPPOSED BLADE DAMPERTTEMPERATURE SENSORCSCURRENT SENSORDMDAMPER ACTUATORTSHTEMPERATURE SWITCH HIGHMSMOTOR STARTERTSLTEMPERATURE SWITCH LOWSSENSORVFDVARIABLE FREQUENCY DRIVEHHORNSDUCT SMOKE DETECTORSPSTATIC PRESSURE SENSORFSFLOW SWITCHPSPRESSURE SWITCHAIR FLOW DIRECTION ARROW#CONTROL POINTIN-LINE PUMPBASE MOUNTED PUMPPUMPSTRAINERSTRAINER W/BLOWOFF VALVESTEAM TRAPTEMPERATURE GAUGEPRESSURE/TEMPERATURE TAPWELLHOSE END BALL VALVE W/ CAPTEMPERATURE/PRESSURERELIEF VALVEVACUUM BREAKERAUTOMATIC AIR VENTMANUAL AIR VENTPRESSURE GAUGE W/ COCKGAUGE W/ PIGTAILPIPRESSURE INDICATORTAQUASTATMANUAL SWITCHTWALL MOUNTED THERMOSTATN N - INDICATES NIGHTS - INDICATES SENSORTUNIT MOUNTED THERMOSTATHHUMIDISTATCOCARBON MONOXIDE SENSORCO2 CARBON DIOXIDE SENSORINDICATOR LIGHTCOMPLIANCE FOR ASHRAE STANDARD 183LOCATION:PORT ORANGE, FL;26 FT. ELEVATION,29.11 DEGREES LATITUDE, -81.002 DEGREES LONGITUDE.OUTDOOR CONDITIONS:SUMMERWINTER= 92 DEGREES F / 78 DEGREES (MEANCOINCIDENT W.B.)= 42 DEGREES FINDOOR CONDITIONS:COOLING = (75) DEGREES FHEATING = (72) DEGREES FENVELOPE CHARACTERISTICS:GLASS SHADING COEF.GLASS "U" FACTORGLASS LOW-EGLASS INTERIOR SHADINGWALL INSULATION "R"ROOF INSULATION "R"PERIMETER FOUNDATION WALLINSULATION "R"= N/A= N/A= N/A= N/A= N/A= N/A= N/ALOAD CALCULATION METHOD:COOLING = TETD/TAHEATING = UATDADOPTED/ENFORCED CODES REQUIRED2023 FLORIDA BUILDING CODE2023 FLORIDA EXISTING BUILDING CODE2023 FLORIDA MECHANICAL CODE2020 NATIONAL ELECTRICAL CODEAND LOCAL AMENDMENTSPROJECT NARRATIVETHE MECHANICAL SCOPE OF WORK FOR THIS PROJECT INCLUDES, BUT IS NOT LIMITEDTO, THE REPLACEMENT OF ONE (1) AIR-COOLED SCROLL CHILLER AND TWO (2)HYDRONIC PUMPS.DRAWING LIST - MECHANICALM001MECHANICAL GENERAL INFORMATIONM002MECHANICAL SCHEDULESMD101 LEVEL 1 MECHANICAL DEMOLTION PLANM101LEVEL 1 MECHANICAL PLANM501MECHANICAL DETAILSTOTAL # OF SHEETS: 5MECHANICAL GENERAL NOTES1. DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY. WHATEVER IS CALLEDFOR IN EITHER IS BINDING AS THOUGH CALLED FOR IN BOTH.2. DUCT AND PIPE SIZE DIMENSIONS ARE IN INCHES UNLESS NOTED OTHERWISE.3. THE EQUIPMENT SPECIFIED ON THE DRAWINGS HAVE BEEN SELECTED AS THEBASIS OF DESIGN. THE USE OF REVIEWED OR SPECIFIED EQUALS SHALL BECOORDINATED BY THE CONTRACTOR AS TO SPACE REQUIREMENTS, EQUIPMENTDIMENSIONS AND PERFORMANCE. ANY ADDITIONAL COSTS EITHER DIRECTLY ORINDIRECTLY CAUSED BY EQUALS SHALL BE THE RESPONSIBILITY OF THECONTRACTOR.4. COORDINATE ALL DIFFUSER AND GRILLE LOCATIONS WITH ARCHITECTURALREFLECTED CEILING PLAN, FIRE PROTECTION, AND ELECTRICAL DRAWINGS.5. DRAWINGS ARE DIAGRAMMATIC AND SHOW THE GENERAL DESIGN INTENT,ARRANGEMENT AND EXTENT OF SYSTEMS. DO NOT SCALE DRAWINGS NOR USE ASSHOP DRAWINGS. WHERE ALTERNATE ROUTING, OFFSETS AND TRANSITIONS AREREQUIRED FOR FIELD COORDINATION OF ALL TRADES, THIS CONTRACTOR SHALLMAKE CHANGES WITHOUT ADDITIONAL COSTS.6. CONTRACTOR SHALL NOT SHUT-OFF/PUT OUT OF SERVICE ANY SYSTEMS/SERVICESWITHOUT FIRST COORDINATING ALL DOWNTIME WITH OWNER'S PERSONNEL.CONTRACTOR SHALL PROVIDE A DETAILED M.O.P. AS REQUIRED. DO NOT BEGINWORK WITHOUT WRITTEN APPROVAL.7. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'SRECOMMENDATIONS UNLESS SPECIFICALLY DIRECTED OTHERWISE.8. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND INSTALLING SLEEVES,INSERTS AND SUPPORTS AS REQUIRED FOR THIS SCOPE OF WORK AND/OR COREDRILL REQUIREMENTS. COORDINATE WITH GENERAL CONTRACTOR ANDSTRUCTURAL ENGINEER.9. CONTRACTOR SHALL CLOSELY COORDINATE NEW MECHANICAL WITH ALL NEW ANDEXISTING MECHANICAL, PLUMBING, ELECTRICAL, FIRE PROTECTION,ARCHITECTURAL AND STRUCTURAL MEMBERS. REFER TO DIVISION 23SPECIFICATIONS FOR CEILING SPACE ALLOCATION PRIORITIES.10. BECOME FAMILIAR WITH ALL EXISTING CONDITIONS PRIOR TO ENTERING INTOCONTRACT. NO ADDITIONAL COST WILL BE ALLOWED FOR FAILURE TO DO SO.11. ALL MECHANICAL SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THECODES LISTED ON THIS SHEET AND THE ARCHITECTURAL CODE PLAN.12. THE ADOPTED ENERGY CODE FOR THIS PROJECT REQUIRES COMMISSIONING OFTHE MECHANICAL SYSTEMS. THE MECHANICAL CONTRACTOR SHALL INCLUDEEXPENSES IN THEIR BID ASSOCIATED WITH THE CODE REQUIRED COMMISSIONINGPROCESS. THESE INCLUDE BUT ARE NOT LIMITED TO ATTENDING COMMISSIONINGMEETINGS, COMPLETING PREFUNCTIONAL CHECKLISTS, DEMONSTRATING SYSTEMPERFORMANCE, AND ADDRESSING COMMISSIONING AUTHORITY REVIEWCOMMENTS.[THIS NOTE HAS LIMITED APPLICABILITY AND SHOULD BE INCLUDED ONLY ONPROJECTS THAT MEET THE FOLLOWING CRITERIA:1. FOLLOWS THE IECC (OR VARIATION OF, SUCH AS THE FECC).2. THE TOTAL MECHANICAL COOLING SYSTEM CAPACITY IS GREATER THAN 480,000BTU/H.3. THE TOTAL MECHANICAL HEATING SYSTEM CAPACITY IS GREATER THAN 600,000BTU/H (INCLUDING SERVICE WATER HEATING).4. THE HVAC SYSTEM DOES NOT SERVE INDIVIDUAL DWELLING UNITS OR SLEEPINGUNITS.IF YOU ARE STILL UNSURE IF THIS NOTE APPLIES TO YOUR PROJECT, REFER TOSECTION C408 OF THE IECC OR FECC.]13. CONTRACTOR SHALL PROVIDE SUBMITTALS ON ITEMS LISTED IN THE MECHANICALSCHEDULES AND AS REQUIRED IN EACH SECTION OF SPECIFICATION TO THEENGINEER/OWNER FOR REVIEW PRIOR TO THE ORDER, PURCHASE ORINSTALLATION OF THESE SAME ITEMS.14. ALL EXISTING EQUIPMENT TO BE REMOVED SHALL HAVE ALL RELATEDHOUSEKEEPING PADS, PIPING, CONTROLS, GAUGES, ELECTRICAL SERVICE,HANGERS, SUPPORTS AND ANY MISCELLANEOUS RELATED SERVICE OR PARTSREMOVED COMPLETELY.15. PROVIDE MANUAL AIR VENTS ON CLOSED SYSTEM WATER PIPING AT ALL CHANGESIN ELEVATION DOWNWARD IN DIRECTION OF WATER FLOW.16. CONTRACTOR SHALL CONSTRUCT AND INSTALL DUCTWORK ACCORDING TOSMACNA STANDARDS AS A MINIMUM REQUIREMENT. REFER TO SPECIFICATIONSFOR ADDITIONAL INFORMATION.17. ALL DUCT DIMENSIONS ARE OUTSIDE DIMENSIONS. WHERE DUCT LINER IS USED,THE THICKNESS OF THE LINER TO MAINTAIN THE CLEAR INSIDE DIMENSION HASBEEN INCLUDED. REFER TO DUCT INSULATION / LINER SCHEDULE AND/OR DIVISION23 OF THE SPECIFICATIONS.18. SPIN-IN FITTINGS TO VAV BOXES AND DIFFUSERS SHALL BE CONICAL TYPE (EXCEPTLOCATIONS WHERE LISTED DUCT HEIGHT DOES NOT ACCOMMODATE). SPIN-INFITTINGS TO DIFFUSERS SHALL INCLUDE AN INTEGRAL MANUAL VOLUME DAMPER.19. RIGID INLET DUCTS TO VAV BOXES [AND OUTLET DUCTS FOR EXHAUST TERMINALS]SHALL BE THE SAME SIZE AS THE VAV BOX INLET CONNECTION UNLESS NOTEDOTHERWISE FOR A MINIMUM OF THREE DIAMETERS OF STRAIGHT DUCT.20. ALL OPENINGS FROM EXHAUST DUCTS, EXHAUST FANS, GRAVITY ROOF VENTS,INTAKE LOUVERS AND GOOSENECKS SHALL BE A MINIMUM OF 12" ABOVE THE TOPOF THE FINISHED ROOFING SURFACE.21. MOUNT THERMOSTAT AT 42" ON CENTER ABOVE FINISHED FLOOR UNLESSOTHERWISE NOTED (ADA REQUIREMENT). ALIGN WITH OTHER ADJACENT DEVICESON WALL.22. PROVIDE REDLINE MARK-UPS FOR ANY FIELD CHANGES OR MODIFICATIONS ON THECONSTRUCTION DOCUMENTS. REDLINE DRAWINGS SHALL BE PROVIDED WHETHERCOORDINATION DRAWINGS ARE REQUIRED OR NOT.23. EQUIPMENT E.E.R. AND/OR C.O.P. VALUES SHALL COMPLY WITH THE CURRENTEDITION OF ASHRAE 90.1.24. EXISTING EQUIPMENT AS NOTED ON THE DRAWINGS SHALL BE RETURNED TO THEOWNER AT THEIR DESIGNATED LOCATION.25. PRIOR TO BALANCING MECHANICAL CONTRACTOR SHALL PROVIDE A CLEAN SET OFFILTERS FOR AIR HANDLING UNITS. THIS CONTRACTOR SHALL PROVIDE A MEANS TOSIMULATE 50% LOADED FILTERS. SYSTEM SHALL BE BALANCED IN THIS MODE.CONTACT LISTDENVER AND COLORADO SPRINGS OFFICES14143 DENVER WEST PKWY, SUITE 550GOLDEN, CO 80401303.422.7400TAMPA BAY AND MELBOURNE OFFICES6555 N. WICKHAM ROAD, SUITE 104MELBOURNE, FL 32940321.241.4142PROJECT ENGINEER / DESIGNERNAME123.456.7890@BCER.COMPROJECT MANAGERMIKE CORDERO727.800.7315MCORDERO@BCER.COMBCER PROJECT 145425001PROGRESS - NOT FORCONSTRUCTIONARCH/ENGR OF RECORDEORBCER EngineeringDESIGNED BYMIKESCHRODERDRAWN BYMICHAELACCALIOSISSUE DATE11/12/2025AE PROJECT NUMBER145425001SHEET TITLEMECHANICAL GENERALINFORMATIONDRAWING NO.M001PLAN CODEMFR.MODELINSTALLEDMFR.MODELCAP. TONSOUTPUTMINIMUMREQUIREDTONSEWT(F°)LWT(F°)GPMMINGPMP.D. (FT.W.C.)AIR COOLED CHILLER SCHEDULECHILLED WATER DATANO GLYCOLPASSES%AMB.TEMP.(F°)NOCOMPR.STEPS LOW AMB.CAP. CONTROLCONTROL (°F)SYSTEMKW FLAREFRIG.TYPEREFRIG.CHARGE(LBS)CONDENSER DATAFANSQTY./HP.CFMENTERING AIRTEMP.EERKWINPUTMCAMOCPELEC.VOLT/PHNOTESACCH-1CARRIER 30RC-060 GS CARRIER30RAP605444141.1 70.904.12BPHE095244-2071.96R-32584/6.4 (TOTAL)426489510.3968.39129.9150460-3-60(2)(3)(4)(5)(6)(7)AIR COOLED CHILLER SCHEDULE PROJECT SPECIFIC NOTES1. HEAT TAPE, INSULATION AND CONTROL / POWER WITH UNIT ON HEAT EXCHANGER; POWER SHALL BE PROVIDED SEPARATELY FROM CHILLER POWER SOURSE.2. PROVIDE UNIT WITH ENERGY USAGE COMPLIANCE TO CURRENT ADOPTED ASHRAE 90.1 REQUIREMENTS.3. GPM INCLUDES OPERATION WITH P.G.4. MINUMUM GPM REQUIRED BY THE MANUFACTURER.5. INTEGRAL OR STANDALONE DISCONNECT AIC/SCCR SHALL MATCH THE AIC RATING OF THE PANELBOARD FEEDING THE EQUIPMENT, UNLESS OTHERWISE SPECIFIED IN THE ELECTRICAL DRAWINGS. IF INFORMATION IS NOT AVAILABLE, THE INTEGRAL OR STANDALONE DISCONNECT AIC/SCCR SHALL BE 65KAIC. THE VENDOR/CONTRACTOR SHALL REVIEW THE ELECTRICAL DRAWINGS DURING BID TIME.6. CHILLER RAISED ON NEOPRENE COVERED STEEL PLATE TO PREVENT CORROSION.7. FURNISHED WITH FACTORY-INTEGRATED 5 HP DUAL HYDRONIC PUMP.BCER PROJECT 145425001PROGRESS - NOT FORCONSTRUCTIONCAPACITY CONVENTIONS• STATIC PRESSURES AND AIR PRESSURE DROPS ARE AT ALTITUDE OF PROJECT.• HEATING AND COOLING OUTPUT CAPACITIES ARE AT ALTITUDE OF PROJECT.• HORSEPOWERS ARE CORRECTED FOR PROJECT ALTITUDE.• NATURAL GAS INPUTS ARE AT SEA LEVEL.ARCH/ENGR OF RECORDEORBCER EngineeringDESIGNED BYMIKESCHRODERDRAWN BYMICHAELACCALIOSISSUE DATE11/12/2025AE PROJECT NUMBER145425001SHEET TITLEMECHANICAL SCHEDULESDRAWING NO.M002(E)3"CWS(E)3"CWRDEMOM2 M3DEMO CH-1M1HVAC EQUIPCOURT11-0018DEMOM2 M3(E) CONCRETEHSKPG PADBOYS/GIRLS11-003A(E)3"CWRPRIMARY/INTERMCLASSROOM11-003FDFDMECHANICAL11-0013EWHFDELECT.11-0012SYSTEMS11-0014WOMEN11-008ACUSTODIAL11-0015MEN11-009AN1 LEVEL 1 MECHANICAL DEMOLITION PLAN1/4" = 1'-0"4'2'04'CORRIDOR11-0016WORK NOTESM1REMOVE EXISTING CHILLER AND ASSOCIATED INTEGRATED HYDRONIC PUMPS.M2REMOVE PORTIONS OF EXISTING CHILLED WATER PIPING AS NECESSARY FORNEW CHILLER CONNECTIONS.M3REMOVE AND REPLACE ANY EXISTING PIPING ACCESSORIES AS NECESSARY TOACCOMMODATE NEW CHILLER INSTALLATION.BCER PROJECT 145425001PROGRESS - NOT FORCONSTRUCTIONARCH/ENGR OF RECORDEORBCER EngineeringDESIGNED BYMIKESCHRODERDRAWN BYMICHAELACCALIOSISSUE DATE11/12/2025AE PROJECT NUMBER145425001SHEET TITLELEVEL 1 MECHANICALDEMOLTION PLANDRAWING NO.MD1013"CWSM4TYP(E)3"CWS(E)3"CWRACCH-1M5 M63"CWR3" CWRBOYS/GIRLS11-003AM7 M8HVAC EQUIPCOURT11-00183" CWR(E)3"CWR(E) CONCRETEHSKPG. PADPRIMARY/INTERMCLASSROOM11-003FDFDMECHANICAL11-0013EWHFDELECT.11-0012SYSTEMS11-0014WOMEN11-008ACUSTODIAL11-0015MEN11-009AN1 LEVEL 1 MECHANICAL PLAN1/4" = 1'-0"4'2'04'CORRIDOR11-0016WORK NOTESM4INSTALL NEW PIPING/VALVES OF THE SAME TYPE AND SIZE AS THE EXISTINGTHAT WERE DEMOLISHED AND CONNECT TO NEW CHILLER.M5PROVIDE NEW AIR COOLED SCROLL CHILLER, ACCH-1, ON EXISTING CONCRETEPAD. CONNECT EXISTING CHILLED WATER SUPPLY PIPING AND EXISTINGCHILLED WATER RETURN PIPING TO NEW CHILLER.M6NEW CHILLER IS FURNISHED WITH FACTORY-INTEGRATED DUAL HYDRONICPUMPS AND EXPANSION TANK.M7NEW CHILLER TO BE RAISED ON STEEL PLATE TOP AND BOTTOM NEOPRENECOVERED TO PREVENT CORROSION. PROVIDE 2-3 INCH CLEARANCE ABOVECONCRETE SLAB.M8EXISTING BUILDING AUTOMATION SYSTEM CONTROL PANEL TO REMAIN.CONTRACTOR SHALL PROVIDE ALL CONTROLS NECESSARY TO INTEGRATE NEWCHILLER AND PUMPS INTO THE EXISTING BUILDING AUTOMATION SYSTEMCONTROLS.BCER PROJECT 145425001PROGRESS - NOT FORCONSTRUCTIONARCH/ENGR OF RECORDEORBCER EngineeringDESIGNED BYMIKESCHRODERDRAWN BYMICHAELACCALIOSISSUE DATE11/12/2025AE PROJECT NUMBER145425001SHEET TITLELEVEL 1 MECHANICALPLANDRAWING NO.M101
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
BID 25-26-12 51ST YEAR CDBG D...
SOLICITATION DOCUMENTS: BID 25-26-12 51ST YEAR CDBG DRAINAGE IMPROVEMENTS EXHIBIT A - BID
City of Hanllandale Beach
Bid Due: 7/16/2026
Florida National Cemetery, Na...
Follow Florida National Cemetery, National Shrine Turfgrass Renovation Project Active Contract Opportunity Notice
VETERANS AFFAIRS, DEPARTMENT OF