Parrott Creek Culvert Replacement - Project No. 25PW15 Addendum No. 2
Project Information
- Bid Title
- Parrott Creek Culvert Replacement - Project No. 25PW15 Addendum No. 2
- Issuing Agency
- City of Roseburg
- Location
- Oregon
- Published Date
- Feb 26, 2026
- Closing Date
- Mar 3, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- Project No. 25PW15
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Parrott Creek Culvert Replacement - Project No. 25PW15
Specification Documents
Drawings
Bid Opening Date: Tuesday, March 3, 2026
Bid Opening Time: 2:00 p.m.
Bid Opening Location: Roseburg City Hall, 3rd Floor Conference Room and Electronically via Zoom - Instructions to join the Zoom meeting will be posted on March 2, 2026
Competitive Range (Base and Additive Alternate): $1,550,000 - $1,850,000
Addendum No. 1 - Posted February 19, 2026
Geotechnical Design Report Parrot Creek Culvert Replacements Roseburg Oregon - Posted February 19, 2026
Addendum No. 2 - Posted February 26, 2026
RUSA Standard Details - Posted February 26, 2026 - Attachment Preview
-
PARROTT CREEK CULVERT REPLACEMENT ADDENDUMProject: Parrott Creek CulvertPrepared by: Erik RangerReplacementi.e. Engineering, Inc809 SE Pine St.Owner: City of RoseburgRoseburg, OR 97470Response date: 02.24.2026___________________________________________________________________________1.0 NOTICE TO ALL BIDDERS AND PLAN\HOLDERSThe Contract Documents for the above-referenced Project are modified as set forth in thisAddendum. The original Contract Documents and any previously issued addenda remain in fullforce and effect, except as modified by this Addendum, which is hereby made part of theContract Documents. Bidder shall take this Addendum into consideration when preparing andsubmitting a bid, and shall acknowledge receipt of this Addendum in the space provided on theBid Form2.0 BID SUBMITTAL DEADLINEThe bid submittal deadline remains the same and is not changed by this Addendum3.0 PROJECT BID BOOKLETThe following changes are made to the Project Bid Booklet:1. The following changes are made to the Base Project Bid Items:a. Quantity changes:Item NumberItem1812 INCH STORM SEWER PIPE20GRANULAR STRUCTURAL BACKFILL26AGGRETATE BASE27HMAC, 3-INCH THICKb. Added items:Item NumberItem37SANITARY SEWER BYPASS, EDDY STREET38SANITARY SEWER BYPASS, KANE STREET39SANITARY SEWER BYPASS, GILES STREET408” SANITARY SEWER4110” SANITARY SEWER428” DUCTILE IRON WATERLINE43CONNECT TO EXISTING WATERLINE44CONNECT TO EXISTING SANITARY SEWER LINE45CONCRETE SANITARY SEWER MANHOLE, 48”46CONC SANI SEWER MANHOLE, OUTSIDE DROP47RECONNECT EXTG. SANITARY SEWER LATERAL488 INCH STORM SEWER PIPE49REMOVE & REBUILD EXTG. FENCEQuantityOriginal New5003702,000 2,300360420100130UnitLSLSLSFOOTFOOTFOOTEACHEACHEACHEACHEACHFOOTFOOTQuantity111290115100282131301852. The following changes are made to the Alternate A Project Bid Items:a. Quantity changes:Item Number16262728b. Added items:Item12 INCH STORM SEWER PIPEGRANULAR STRUCTURAL BACKFILLAGGRETATE BASEHMAC, 3-INCH THICKQuantityOriginal New3501,250 950951602540Item Number16313233343536Item8 INCH STORM SEWER PIPESANITARY SEWER BYPASS, ICHABOD STREET8” SANITARY SEWER8” DUCTILE IRON WATERLINECONNECT TO EXISTING WATERLINECONNECT TO EXISTING SANITARY SEWER LINERECONNECT EXTG. SANITARY SEWER LATERALUnitFOOTLSFOOTFOOTEACHEACHEACHQuantity601100100222Make a copy of and use the new attached Bid Schedule. A Bid not including this new BidSchedule will be rejected as non-responsive.4.0 PROJECT SPECIAL PROVISIONSSECTION 00190 – MEASUREMENT OF PAY QUANTITIES00190.15 Payment Summary – Add the following payment summaries to the end of thissection:29. SANITARY SEWER BYPASS - This Work consists of developing a plan, andfurnishing, installing, operating, and maintaining, sewer bypass when working onexisting sanitary sewer sections. Payment will be in full for furnishing the requiredplan, all required materials, installation, maintaining and removing the bypassmaterials when complete. Payment will be lump sum per each culvert crossing.30. SANITARY SEWER PIPE - This Work consists of constructing or reconstructing,sanitary sewer pipes in the kinds, sizes, and lengths and at the locations shownor as directed to the lines and grades established. The Work includes furnishingand constructing Joints and connections to other drainage Structures or systems,as necessary, for complete installation. Payment will be payment in full forfurnishing and placing all Materials, and for furnishing all Equipment, labor, andIncidentals necessary to complete the Work as specified. To include trenchexcavation, bedding, pipe zone Material, and trench backfill for pipes 72 inchesand less in diameter, pipe plugs, stoppers, and other required fittings, tracer wire,and air, Joint, and deflection testing. Payment will be by the measured, installedfoot.31. DUCTILE WATERLINE - This Work consists of constructing potable water pipeand fittings 16 inches and smaller in diameter. Payment will be payment in full forfurnishing and placing all Materials, and for furnishing all Equipment, labor, andIncidentals necessary to complete the Work as specified to include trenchexcavation, bedding, pipe zone Material, and trench backfill, pipe plugs, stoppers,Parrot Creek Culvert ReplacementAddendumi.e. Engineering, Inc.i.e. Job # 0149-232Page 2 of 1902.24.2026and other required fittings, tracer wire, and markers balls, concrete thrust blocks,marking tape, polyethylene encasement, disinfection, flushing, and testing.Payment will be by the installed, measured foot.32. CONNECT TO EXISTING WATERLINE - This Work consists of connecting newwaterlines to existing pipes. Payment will be payment in full for furnishing andplacing all Materials, and for furnishing all Equipment, labor, and Incidentalsnecessary to complete the Work as specified to include trench excavation,bedding, pipe zone Material, and trench backfill, pipe plugs, stoppers, and otherrequired fittings, tracer wire, and markers balls, concrete thrust blocks, markingtape, polyethylene encasement, disinfection, flushing, and testing. Payment willbe by each.33. CONNECT TO EXISTING SANITARY SEWER - This Work consists ofconnecting new sewer lines or manholes to existing pipes. Payment will bepayment in full for furnishing and placing all Materials, and for furnishing allEquipment, labor, and Incidentals necessary to complete the Work as specifiedto include trench excavation, bedding, pipe zone Material, and trench backfill,pipe plugs, stoppers, and other required fittings, and tracer wire. Payment will beby each.34. CONCRETE SANITARY SEWER MANHOLE, 48” - This Work consists ofpurchasing and installation of standard, 48-inch diameter manhole. Payment willbe payment in full for furnishing and placing all Materials, and for furnishing allEquipment, labor, and Incidentals necessary to complete the Work as specifiedto include excavation, bedding, backfill, pipe plugs, stoppers, and other requiredfittings, and tracer wire, grouting, cleaning, and predelivery and post constructionacceptance testing. Payment will be by each.35. CONCRETE SANITARY SEWER MANHOLE, OUTSIDE DROP - This Workconsists of purchasing and installation of an outside drop manhole. Payment willbe payment in full for furnishing and placing all Materials, and for furnishing allEquipment, labor, and Incidentals necessary to complete the Work as specifiedto include excavation, bedding, backfill, pipe plugs, stoppers, and other requiredfittings, and tracer wire, grouting, cleaning, and predelivery and post constructionacceptance testing. No additional payment will be made for exterior drop pipingor concrete. Payment will be by each.36. REMOVE AND REBUILD EXISTING FENCE – This work consists of removingand rebuilding existing Fences as shown or directed. Construct Fences toapproximately the same condition as the original Fence. Salvage the materialsin existing Fences to be removed and rebuilt and incorporate in the rebuiltFences. Replace fence materials damaged beyond reuse at no additional costto the Agency. Firmly reset posts to match the existing alignment. Post spacingand the number of wires to be strung and stapled to the posts shall be the sameas the original Fence. Furnish and use new staples or clips to fasten the wiresto the posts.37. RECONNECT EXTG. SANITARY SEWER LATERALS - This Work consists ofconstructing or reconstructing, sanitary sewer laterals in the kinds, sizes, andlengths and at the locations shown or as directed to the lines and gradesestablished. The Work includes furnishing and constructing Joints andconnections to the new mainline and existing laterals, as necessary, for completeinstallation. Payment will be payment in full for furnishing and placing allMaterials, and for furnishing all Equipment, labor, and Incidentals necessary tocomplete the Work as specified. To include trench excavation, bedding, pipezone Material, and trench backfill, pipe plugs, stoppers, and other requiredParrot Creek Culvert ReplacementAddendumi.e. Engineering, Inc.i.e. Job # 0149-232Page 3 of 1902.24.2026fittings, tracer wire, and air, Joint, and deflection testing. Payment will be by each,with no additional payment for piping.Add or append the existing with the following special provisions.SECTION 00445 - SANITARY, STORM, CULVERT, SIPHON, AND IRRIGATION PIPEComply with Section 00445 of the Standard Specifications modified as follows:00445.10 General – Add the following paragraph after the third paragraph; Wherever sewermains cross water lines with less than 18 inches of vertical clearance, the sewer main shall beC900 PVC, DR18 conforming to 02470.40 for the entire distance between manholes. Whereversewer laterals cross water lines with less than 18 inches of vertical clearance, the sewer lateralshall be C900 PVC or ductile iron pipe for a minimum distance of 9 feet on each side of thewaterline, centering the pipe section on the waterline.00445.11 Materials – Add the following bullets to the end of this subsection:(f) Pipe Materials - See profile on construction plans for pipe material designation Unlessspecified otherwise, all sanitary sewer pipe used on this project shall be 3034, SDR35 PolyvinylChloride (PVC) Pipe conform to 02410.70. All service Tee connections shall be gasketed PVCfactory fabricated sections meeting the same requirements as the pipe. Ductile Iron Pipe shallbe Class 50 when called out on plans. Use centrifugally cast ductile iron pipe meeting therequirements of AWWA C151. Ductile iron pipe shall have a Protecto 401 Ceramic Epoxy liningor approved equal. Joints shall conform to AWWA C111/A21.11-00 for push on rubber gasketjoints and shall be Tyton® or approved equal. Joint gaskets including gasket lubricant shall befurnished with the fittings. Sanitary sewer pipe used as carrier pipe shall be C900 PVC, DR18conforming to 2470.40.00445.11(e) Tracer Wire – Tracer wire shall be 12-gauge solid copper insulated high molecularweight polyethylene (HMW-PE) tracer wire. The HMW-PE insulated cover shall be green and aminimum 45 mil thick. The wire shall be UL rated for 140°F.Construction00445.40(b) Line and Grade - Add the following bullet to the end of this section: . Standing water in excess of 3/8 inch00445.43(c) PVC Pipe – Add the following at the end of this section:Field verify size of existing sanitary service lines located near the property line prior to placingmainline pipe and required Tee section. Match the Tee to the appropriate service size alongwith the service pipe size between the mainline and property line. Size shall be 4-inch minimum.If 6-inch line is used into the dwelling, then use 6-inch from the main line. No additionalpayments will be made for 6-inch services.00445.70(b) Siphon, Irrigation and Sanitary Sewer Installations – Delete the last sentenceand substitute the following:Parrot Creek Culvert ReplacementAddendumi.e. Engineering, Inc.i.e. Job # 0149-232Page 4 of 1902.24.2026Contractor shall perform deflection and air testing on full pipe runs. The agency will perform avideo inspection.00445.72(b) Hydrostatic Testing – Delete this subsection for Sanitary Sewer Pipe testing.00445.72(c) Air Testing – Replace this subsection, except for the subsection number and title,with the following: The pressure test gauge used in air testing shall have a minimum divisions of0.1 psi and an accuracy of 0.0625 psi. The test procedure is as follows(1) Add air slowly to the section of system being tested until the internal air pressure israised to 4 psi greater than the average back pressure due to groundwater. Whenacceptable to the engineer, 5 psi may be used to account for groundwater.(2) After the test pressure is reach, allow at least 2 minutes for the air temperature tostabilize, adding only the amount of air required to maintain pressure.(3) After the temperature stabilization, disconnect the air supply.(4) Monitor the pressure gauge for the minimum time required. There will be no internal airpressure drop allowed with 3034 PVC pipe. In no case shall length of test (T) be lessthan the following chart.LengthTimePipe Diameter Min Time for Min Time for longer length(inches) (min:sec) (Feet)(sec)83:472980.76L00445.74 Video Inspection of Sanitary and Storm Sewers – Replace this subsection, exceptfor the subsection number and title, with the following:Video inspection will be performed once by RUSA 30 days after the trench is completelybackfilled at no cost to the contractor. Prior video inspections or subsequent video inspectionswill be performed by the agency at the contractor’s expense. The contractor will be charged forsubsequent testing required due to failing tests and will be deducted from contract payments per00195.502(a-5).00445.91 Payment – Add the following to the description for item (b):In item (b) payment will be made on a length basis on the service laterals regardless of methodof installation and will include payment in full for furnishing and placing all materials, and forfurnishing all equipment labor, clean-outs, tee’s, wye’s, caps, covers and other fittings alongwith incidentals necessary to complete the work as specified. No additional payments will bemade for 6” services.SECTION 00470 - MANHOLES, CATCH BASINS, AND INLETSComply with Section 00470 of the Standard Specifications modified as follows:00470.11 Precast Concrete Manholes and Bases – Add the following after the first paragraph:Sanitary manhole cone sections shall have a concentric opening. All sanitary manholes shall be48-inch nominal inside diameter unless specified otherwise. Connections to existing manholesshall be cored or saw cut only.Parrot Creek Culvert ReplacementAddendumi.e. Engineering, Inc.i.e. Job # 0149-232Page 5 of 1902.24.2026
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
NE 1 st, 2 nd, Fogarty, and G...
Bid Solicitation # S-KN0010-00017300 Bid Solicitation # S-KN0010-00017300 Organization Name City of Newport
State Government of Oregon
Bid Due: 7/09/2026
RESERVE CONTRACT FOR CONSTRUC...
Description Oregon State University ("OSU" and/or "Owner") is seeking Offers ("Offers") from qualified
Oregon State University
Bid Due: 8/30/2030