- Bid Title
- Wastewater System Capacity Improvements Project
- Issuing Agency
- City of St. Helens
- Location
- Oregon
- Published Date
- May 7, 2026
- Closing Date
- May 12, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Wastewater System Capacity Improvements ProjectBid/RFP Status:Open - accepting bids and proposalsBid/RFP Due Date:Tuesday, May 12, 2026 - 1:00pmBack to Bids/RFPsBid/RFP Reference Number:S-679
The Wastewater Capacity Improvements Project consists of the construction and replacement of sanitary sewer infrastructure within Basins 4 and 6 in the City of St. Helens. The project is intended to increase system capacity, improve reliability, and address existing conveyance deficiencies in key portions of the collection system.
Work includes installation of approximately 12,449 linear feet of new sanitary sewer pipe of varying diameters, including 10-inch, 12-inch, 15-inch, 18-inch, 24-inch, 27-inch, and 28-inch pipe. Pipe materials include PVC and HDPE. Portions of the work will be constructed using trenchless methods, including installation of the 24-inch PVC pipeline and approximately 1,564 linear feet of 28-inch HDPE pipe. The project also includes a trenchless crossing beneath an active railroad.
Additional improvements include rechanneling 18 existing manholes and installation of 49 new manholes. Associated utility and surface restoration work includes approximately 150 linear feet of water line relocation, 383 linear feet of storm drainage pipe replacement, trench backfill, asphalt paving, sewer system testing, and restoration of disturbed landscaping and surface features.
A portion of the work occurs within the U.S. Route 30 right-of-way and will require coordination with and inspection by the Oregon Department of Transportation.
This project is funded in part through the Clean Water State Revolving Fund (CWSRF). As such, the Contract Documents include federally required provisions. Contractors shall comply with all applicable CWSRF requirements, including but not limited to federal labor standards (including Davis-Bacon wage requirements), American Iron and Steel (AIS) provisions, and applicable environmental and reporting requirements.
A Mandatory Pre-Bid Conference will be held in the Columbia Room at the City of St. Helens City Hall at 265 Strand Street, St. Helens, Oregon 97051 on April 29, 2026, 2:00 PM to provide prospective bidders with the opportunity to visit the site and ask questions relating to bidding or constructing the work under this Contract.
Bids are due and will be publicly opened and read at 1:00 P.M. Tuesday, May 12, 2026 in the Columbia Room at the City of St. Helens City Hall at 265 Strand Street, St. Helens, Oregon 97051.
Project costs are estimated between $22 million and $24 million.
Project Contacts:Consor: Bart Stepp, PE, Project Manager, (503) 714-3187, bart.stepp@consoreng.com
City of St. Helens: Sharon Darroux, PMP, Engineering Manager,(503) 366-8243, sdarroux@sthelensoregon.govSupporting Documents - Attachment Preview
-
ADDENDUM NO. 2TO THE PROJECT BID DOCUMENTSWASTEWATER SYSTEM CAPACITY IMPROVEMENTS BASINS 4 & 6PROJECT NO. S-679THIS ADDENDUM IS HEREBY MADE A PART OF THE PROJECT BID DOCUMENTS TO THESAME EXTENT AS THOUGH IT WERE ORIGINALLY INCLUDED THEREIN.BIDDERS MUST ACKNOWLEDGE RECEIPT OF ALL ADDENDA ON THE BID PROPOSALFORM. BID PROPOSALS THAT FAIL TO ACKNOWLEDGE ALL ADDENDA MAY BECONSIDERED IRREGULAR AND REJECTED.ISSUED THIS 30THDDigAiYtaOllyFsAigPnReIdLb2y026Sharon Darroux,Engineering ManagerSharon Darroux, PM1D1Pa:t1e3::23052-60.70'40.03'0Engineering ManagerCity of St. Helens, Oregon1|P a g eITEM NO 1.PRE-BID CONFERENCE DOCUMENTATIONThe Mandatory Pre-Bid Conference for the Wastewater Capacity Improvements Projectwas held in the Columbia Room at City Hall, located at 265 Strand Street, St. Helens,Oregon 97051, on April 29, 2026, at 2:00 PM.The Pre-Bid Meeting Agenda, Meeting Minutes, and Sign-In Sheet are ATTACHED heretoand incorporated into the Contract Documents by this reference.ITEM NO 2.BID OPENING TIME REVISIONThe Bid Opening time for the Wastewater Capacity Improvements Project is herebyrevised. Bids will be received at St. Helens City Hall, 265 Strand Street, St. Helens, Oregonuntil 2:00 PM on May 12, 2026, at which time they will be publicly opened and read aloud.All references in the Contract Documents to a Bid Opening time of 1:00 PM on May 12,2026, are hereby modified to 2:00 PM.2|P a g e
- Commodity Codes
-
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Big Creek Dams Seismic Remedi...
Bid Solicitation # S-KN0010-00017111 Bid Solicitation # S-KN0010-00017111 Organization Name City of Newport
State Government of Oregon
Bid Due: 7/07/2026
Request For Proposals Aquifer...
Request For Proposals Aquifer Storage and Recovery (ASR) Design and Permitting Study Bid/RFP
Silverton city
Bid Due: 7/21/2026