Local Advanced Water Purification System (Local AWPS)
Project Information
- Bid Title
- Local Advanced Water Purification System (Local AWPS)
- Issuing Agency
- City of Palo Alto
- Location
- California
- Published Date
- Nov 28, 2024
- Closing Date
- Jan 31, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: Local Advanced Water Purification System (Local AWPS)
Addenda: 0
Release Date: 11/27/2024
Due Date: 1/31/2025
OverviewPost InformationPosted At:Wed, Nov 27, 2024 7:25 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:NoSummaryDescription of Project: The Local AWPS project consist in two Phases. This IFB is for Phase that will produce 1.125 MGD of RO permeate and will include housekeeping pads for future skids and pipe headers sized enough to accommodate expansion. Phase I Motor Control Centers will also accommodate for Phase II electrical loads. The permeate produced from the project will be blended with the existing tertiary-treated recycled water to achieve an instantaneous TDS concentration of 400 to 500 mg/L. The Local AWPS will be constructed without interruption to the current treatment operations, except as allowed under special circumstances, such as piping and utility tie-ins. The electrical service, potable water service and fire water supply will be independent from the RWQCP service. New service connections will be made with City of Palo Alto Utilities (CPAU).
The Project will consist on construction of a new odor control structure, membrane filtration, reverse osmosis system, construction of a new permeate storage tank, blending station, new chemical storage facilities, electrical, instrumentation and control systems. Site work includes pile foundation, concrete slab, yard piping, replacement of a sewer line, paving, grading, landscaping, construction of a metal canopy, a pre-engineered electrical building and a perimeter wall.
THE ENGINEER'S ESTIMATE FOR THIS PROJECT IS: $53,598,743
TimelineRelease Project Date:November 27, 2024Pre-Bid Conference & Site Walk (Mandatory) (Non-Mandatory):December 10, 2024, 10:00amA mandatory Pre-Bid Conference and Site Walk is scheduled for December 10, 2024. The Conference shall begin promptly at 10:00 am, and shall be held at RWQCP Administration Building Conference Room located at 2501 Embarcadero Way Administration Building Training Room, Palo Alto, CA 94303. All prospective Bidders must attend.Question Submission Deadline:January 22, 2025, 1:00pmQuestion Response Deadline:January 28, 2025, 5:00pmBid Submission Deadline:January 31, 2025, 3:00pmIssue Notice of Intent to Award (Tentative):February 18, 2025City Council Approval Date (Tentative):April 14, 2025Work Commences (Tentative):May 1, 2025Work Ends (Tentative):December 31, 2027 - Commodity Codes
-
- NAICS 221310Water Supply and Irrigation Systems
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
146226 FILTER, CARTRIDGE, MIS...
146226 - 146226 FILTER, CARTRIDGE, MIST ELIMINATOR Status Stage Open Posted 6/26/2026 Bid
City of Los Angeles
Bid Due: 7/07/2026
RFQ HALO 5 Whole House Water ...
Follow RFQ HALO 5 Whole House Water Filtration & Conditioning System PN: H5-125
GENERAL SERVICES ADMINISTRATION
Bid Due: 7/10/2026