Renovation of Offices with Addition, Gym Project ? Pre-qualified Contractors Only
Project Information
- Bid Title
- Renovation of Offices with Addition, Gym Project ? Pre-qualified Contractors Only
- Issuing Agency
- St. Johns River State College
- Location
- Florida
- Published Date
- Jan 6, 2026
- Closing Date
- Jan 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFQ-SJR-09-2025
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Solicitation Number: BID-SJR-09-2025
Solicitation Name: Renovation of Offices with Addition, Gym Project – PREQUALIFIED CONTRACTORS ONLY
Status of RFQ: Open
Description: St. Johns River State College is soliciting bids from prequalified contractors for the renovation of existing offices and the construction of an office addition within the College’s Gymnasium facility. The project includes all labor, materials, equipment, supervision, and coordination necessary to complete interior renovations and associated construction. Scope of work may include demolition, framing, finishes, mechanical, electrical, plumbing modifications, and integration of the new addition with existing building systems. All work shall be performed in accordance with approved plans, specifications, applicable codes, and College standards.
Web Page:
This web page is updated as the BID process progresses and applicants must monitor this page for updates, information, schedules, addenda to the specifications document if any, and notices.
BID-SJR-09-2025 Specifications Document
To obtain the BID-SJR-09-2025 Specifications Document, send a request to Terry Thomas, AVP of Facilities, Planning, and Capital Projects, via e-mail at TerryThomas@sjrstate.edu or click on the document link on this webpage.
Deadline for RFQ Responses:
BID responses, sealed and identified on the outside of the submission with the firm’s name and BID-SJR-09-2025 are due by 2:00 p.m. on January 9, 2026, to St. Johns River State College, Business Office Attn: Terry Thomas, 5001 St. Johns Avenue, Palatka, FL 32177.
Document Name: Issue Date: Addendum 1 December 9, 2025 Addendum 2 December 23, 2025 SJR State contact for information is:
Terry Thomas, Asst. VP of Facilities, Planning, and Capital Projects,
(386) 312-4110 - Attachment Preview
-
December 9, 2025Renovation of Offices with Addition, Gymnasium Project, Palatka Campus (SJR-BID-09-2025)St. Johns River State CollegeArchitect’s Job Number: 015ZA08ADDENDUM 1All items in the Addendum are incorporated into the Contract Documents.Item 1.List of attendees at the Pre-Bid Meeting December 8, 2025:Ray Sjogren, St. Johns River State CollegeTerry Thomas, St. Johns River State CollegeEric Mellies, St. Johns River State CollegeTravas Sheridan, St. Johns River State CollegeJoe Kuehmeier, CRG Architects/Palatka, Inc.Oliver Kirkpatrick, Scherer ConstructionKyle Coker, Coker IndustrialItem 2.Following is a list of questions received since the Pre-Bid Meeting was held:Q1: Where the data/communication symbol is indicated on the drawings, how many Cat 6 data ports are required?A1: Provide two (2) Cat 6 and data ports. Contractors shall route these lines to the existing IT rack. Field verify.Q2: What should be provided at TV location?A2: Provide power and CAT 6 for the TV. Provide blocking for the wall mounted TV bracket.Q3: Will personal effects be removed from existing spaces?A3: Yes, personal effects will be removed. However, the contractor is responsible for removing all furniture priorto construction and reinstalling furniture once construction is complete.Item 3.Deadline to receive questions has been changed from January 5, 2026, to December 19, 2025, at 5 p.m.Item 4.Contractor shall pour concrete pad and extend chain link fence as required for outside condensing unit. Seerevised drawings.Item 5.Tom Reynolds is the Point of Contact. His phone number is 904-994-7934.Item 6.See attached drawings and specifications.St. Johns River State CollegeRenovation of Offices with Addition, Gymnasium Project, Palatka Campus (BID-SJR-09-2025)Addendum Number 1Page 1CODE REVIEWAPPLICABLE CODESNFPA 1, FIRE CODE 2023NFPA 101, LIFE SAFETY CODE 2023FLORIDA BUILDING CODE 2023OCCUPANCY CLASSIFICATIONBUSINESS (B) / FBCSINGLE OCCUPANCYTYPE OF CONSTRUCTIONTYPE II BNOT SPRINKLEDBUILDING AREA OF RENOVATIONNEW CONSTRUCTIONEXISTING BUILDING OCCUPIABLE 2ND FLNONE6,240 SFGENERAL BUILDING HEIGHTS AND AREASMAXIMUM ALLOWABLE HEIGHTACTUAL BUILDING HEIGHT=55'=EXISTINGMAXIMUM ALLOWABLE STORIES ABOVE GRADE=2ACTUAL STORIES ABOVE GRADE=EXISTINGMAXIMUM ALLOWABLE BUILDING AREAACTUAL BUILDING AREA=12,500 SF=EXISTINGMEZZANINE=NONETYPES OF CONSTRUCTION (FIRE RATING REQUIREMENTS)PRIMARY STRUCTURAL FRAME=BEARING WALLS AND PARTITIONSEXTERIOR=INTERIOR=NON BEARING WALLS AND PARTITIONSINTERIOR=FLOOR CONSTRUCTION=ROOF CONSTRUCTION=HOURS000000(EXTERIOR WALLS ARE EXISTING, NO NEW CONSTRUCTION TO BECOMPLETED)INTERIOR WALL AND CEILING FINISH REQ. (NON SPRINKLERED)INTERIOR EXIT STAIRWAYS AND RAMPS ANDEXIT PASSAGEWAYS=ACORRIDORS AND ENCLOSURE FOR EXIT ACCESSSTAIRWAYS AND RAMPS=BROOMS AND ENCLOSED SPACES=CCLASS OF MATERIALSCLASS ACLASS BCLASS CFLAME SPREAD INDEX S MOKE DEV. INDEX0 - 250 - 45026 - 750 - 45076 - 2000 - 450MAXIMUM FLOOR AREA PER OCCUPANTSTORAGE, STOCK, SHIPPING AREASBUSINESS AREASACCESSORY STORAGE AREASMECHANICAL EQUIPMENT ROOM300 GROSS150 GROSS300 GROSS300 GROSSTOTAL COMBINED OCCUPANCY FOR THIS PROJECT: 42MEANS OF EGRESS SIZINGSTAIRS:(2) STAIRS REQUIREDDOORS:CORRIDOR:RAMPS:0.3" PER PERSON (44" WIDE MIN.)0.2" PER PERSON (32" WIDE MIN.)0.2" PER PERSON (44" WIDE MIN.)0.2" PER PERSON (44" WIDE MIN.)NUMBER OF EXITS AND ACCESS DOORWAYSSPACES WITH ONE EXIT OR ACCESS DOORWAYOCCUPANCYBMAXIMUM OCCUPANT LOAD OF SPACE49COMMON PATH OF TRAVEL OL <= 3075'COMMON PATH OF TRAVEL OL > 3075'DESIGNED EGRESS COMPONENTSEXIT ACCESS TRAVEL DISTANCE:200'CORRIDOR FIRE RESISTANCE RATINGGREATER THAN 30 (NOT SPRINKLED)1 HOUR*THIS STRUCTURE DOES NOT HAVE ANY CORRIDORS THATSERVE MORE THAN 30 PEOPLEDEAD END CORRIDOR20'LIFE SAFETY PLAN LEGEND#EC = XXXED = XXXOCCUPANCY NUMBERDIRECTION OF EGRESSSECONDARY EGRESSFIREMAN ACCESSEC = EXIT CAPACITYED = EXIT DISCHARGE1 HOUR FIRE RATEDSMOKE BARRIER WALL (SEAL TOUNDERSIDE OF ROOF DECK)PATH OF TRAVELEXIT SIGNFEFECSHHFPFIRE EXTINGUISHER(SURFACE MOUNT)FIRE EXTINGUISHERAND CABINETEMERGENCY LIGHTSMOKE DETECTORHEAT DETECTORSEMI-FLUSH MOUNTED FIREALARM AUDIO/VISUALWARNING DEVICEFIRE ALARM VISUAL STROBEFLUSH MOUNTED FIREALARM PULL STATIONEXIT SIGN WITHEMERGENCY LIGHTINGAPPROXIMATE LOCATIONRENOVATIONS TO THE SECONDFLOOR OF THE EXISTING GYMST. JOHNS RIVER STATE COLLEGE5001 ST JOHNS AVE. PALATKA, FLORIDA 32177SCOPE OF WORKEXISTING BUILDING - LEVEL TWO ALTERATION• UPGRADE EXISTING SOUND BATT INSULATION• ADD (1) OFFICE, (1) SUPPLY CLOSET & (1)CONFERENCE ROOM IN SOUTHSIDE OF 2ND FLOORINDEX TO DRAWINGSSheet NumberSheet NameA001A002A101A200A300COVER SHEET / LIFE SAFETYABBREVIATIONS & LEGENDSFLOOR PLAN PROPOSEDREFLECTED CEILING PLAN, INT ELEVATIONSSECTIONS & DETAILSRevisionsNo. Desc. DateCRGCRG ARCHITECTS/ PALATKA, INC.216A ST. JOHN'S AVE.PALATKA, FL 32177AA0 0 0 2 6 0 4p. 386 - 325 - 0213f. 386 - 328 - 1401BID SETDN EC = 260ED = 11OFFICEG00472OFFICEG00482TRAVEL DISTANCE 86'-9"OFFICEG0049210OFFICEG00502CLOSETEQUIPMENTSUPPLIESG0051A G0051 G0052000TRAVEL DISTANCE 85'-10"6A200DNEECD==2607DISTRICT OF BOARD TRUSTEESRICH KOMANDO, J.D.NICK PRIMROSE, J.D.W.J. (JUD) SAPP, JR.CHEREESE STEWARTWENDELL D. DAVISCYRUS ZOMORODIAN, J.D.JEREMIAH BLOCKER, J.D.JOE H. PICKENS, J.D.CHAIRVICE CHAIRBOARD ATTORNEYEXECUTIVE SECRETARYADMINISTRATIONJOE H. PICKENS, J.D.PRESIDENTTRAVEL DISTANCE 98'-2"A2007DNEC = 200ED= 102 LIFE SAFETYSCALE: 3/32" = 1'-0"OFFICEG0055229 SF2SUPPLIESG0056100 SF010TRAVEL DISTANCE 102'-2"CONFERENCEROOMG00579302 SFDNEC = 260ED = 11Seal / Signature3 KEY PLANSCALE: N.T.S.STATEMENT OF COMPLIANCE:To the best of my knowledge, these construction documents are in compliancewith criteria set forth in the current edition of the Florida Building Code andFlorida Statutes.Project numberDateDrawn byChecked by015ZA0811-19-T25BJKA001OFSH EETSScaleAs indicatedMATERIAL LEGENDPARTITIONPARTITION WALLWITH SOUNDBATTSBATT INSULATIONRIGID INSULATIONFINISHED WOODDIMENSIONALLUMBERWOOD BLOCKINGEARTHC.M.U. WALLCAST-IN-PLACECONCRETEREINFORCEDVERTICAL CMUCELLGENERAL NOTES1. ALL WORK AND IMPROVEMENTS ARE CONFINED TO THE AREAS INDICATED IN THESE DRAWINGS. AL L WORK SHALLBE INSTALLED BY A LICENSED CONTRACTOR AND THE APPROPRIATE LICENSED SUBCONTRACTORS IN STRICTACCORDANCE WITH ALL GOVERNING CODES.2. ALL WORK IS TO BE EXECUTED UNDER DIRECT SUPERVISION OF A CERTIFIED GENERAL CONTRACTOR. THEGENERAL CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS, DIMENSIONS, AND COORDINATE ALL OPENINGS AND INSERTSWITH THE APPROPRIATE SUBCONTRACTORS. HANGING DEVICES SHALL BE INSTALLED SO AS NOT TO OVERLOAD THEASSEMBLY OR ANY OTHER STRUCTURAL COMPONENTS. I T IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINEERECTION PROCEDURE AND SEQUENCE TO ENSURE THE SAFETY OF THE BUILDING, ITS COMPONENTS, AND ALL PRESENTON THE SITE.DIMENSIONS: AL L DIMENSIONS AND ELEVATIONS SHOWN ON THE DRAWINGS SHALL BE VERIFIED BY THE CONTRACTORTO INSURE THE PROPER INTERFACING WITH EXISTING CONDITIONS. IF ANY CONFLICT OCCURS BETWEEN ANY PART OFTHESES DOCUMENTS THE CONTRACTOR IS TO NOTIFY THE ARCHITECT IMMEDIATELY. IF THE ARCHITECT IS NOTAFFORDED THE OPPORTUNITY TO CLARIFY OR MODIFY ANY CONFLICTS, THE CONTRACTOR ASSUMES RESPONSIBILITYFOR RESOLVING ANY PROBLEMS WHICH MAY HAVE DEVELOPED.RESPONSIBILITY; IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION PROCEDURE AND SEQUENCETO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING ERECTION. THIS INCLUDES BUT IS NOTLIMITED TO THE ADDITION OF WHATEVER TEMPORARY BRACING, GUYS, OR TIE DOWNS THAT MAY BE NECESSARY.SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN THE PROPERTY OF THE CONTRACTOR AFTER COMPLETION OFTHE PROJECT. I T IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE MEANS AND METHODS REQUIRED TOACHIEVE THE INTENT OF THESE DRAWINGS.CONFLICTS: WHERE CONFLICTS OCCUR BETWEEN THE SPECIFICATIONS, REFERENCED CODES, NOTES ,AND WORKINGDRAWINGS, THE MOST STRINGENT REQUIREMENTS SHALL APPLY. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TONOTIFY THE ARCHITECT IMMEDIATELY OF ANY CONFLICTS FOR DIRECTION.COORDINATION: G ENERAL CONTRACTOR SHALL COORDINATE ALL OPENINGS AND INSERTS WITH THE APPROPRIATESUBCONTRACTORS ACCORDING TO THE PLANS. SEE SH OP DRAWINGS FOR ALL SUPPORTING STRUCTURES AND INSERTSREQUIRED BY THE VARIOUS BUILDING SYSTEMS. ALL SUPPORT STRUCTURES AND HANGING DEVICES SHALL BEINSTALLED SO AS NOT TO OVERLOAD THE STRUCTURE OR ANY STRUCTURAL COMPONENT. THE C ONTRACTOR SHALLBE RESPONSIBLE FOR THE SAFETY OF THE STRUCTURE AND ITS OCCUPANTS.SUBMITTALS; THE REVIEW OF VARIOUS SUBMITTALS BY THE VARIOUS SUBCONTRACTORS AND PRE-ENGINEEREDSYSTEMS ENGINEER OF RECORD WILL BE TO: VER IFY THAT THE SUBMITTALS HAVE BEEN FURNISHED AND PREPAREDBY A QUALIFIED PERSON, THAT THE PREPARER HAS UNDERSTOOD THE INTENT OF THE DESIGN AND THECONSTRUCTION DOCUMENTS. NO DETAILED REVIEW WILL BE MADE BY THE ARCHITECT AND ENGINEER. THE GENERALCONTRACTOR SHALL CHECK AND STAMP THE SHOP DRAWINGS INDICATING THAT A THOROUGH REVIEW WASCONDUCTED AND STAMPED FOR CONFORMANCE PRIOR TO FORWARDING THEM TO THE ARCHITECT. THE ARCHITECT /ENGINEER WILL REVIEW THE SHOP DRAWING SUBMITTAL ONCE AND IF FOUND NOT TO BE IN CONFORMANCE, THESUBMITTAL WILL BE REJECTED. ADD ITIONAL REVIEWS CAN BE PERFORMED FOR THE COST BURDEN DIRECTLY RELATEDTO THE ADDITIONAL REVIEW. FOR COLOR SELECTION, THE CONTRACTOR IS TO SUBMIT ALL COLOR RELATEDPRODUCTS AT ONE TIME TO INSURE CONTINUITY IN THE OVERALL COLOR SCHEME USED.GRAPHIC SYMBOLS1DOOR MARKAWALL MARKAWINDOW MARKDETAIL NO.SHEET NO.SECTION/DETAIL TARGETELEVATION NO.SHEET NO.ELEVATION REFERENCEH 101ROOM SPACE NUMBEREXIT LIGHT (ILLUMINATED)SECTION NO.SHEET NO.WALL OR PARTIALBUILDING SECTIONNORTH ARROW (TRUE)SECTION NOSHEET NO.CROSS OR BUILDINGSECTIONA.B.ABV.ACC.ACOUS.A/CA.D.ADD.ADH.ADJ.A.F.F.AGG.A.H.U.ALUM.ALT.AMP.ANC.ANL.ANOD.A.P.APX.ARCH.ASB.ASPH.ATTNA.T.AUTO.@ANCHOR BOLTABOVEACCESSACOUSTICALAIR CONDITIONINGAREA DRAINADDENDUMADHESIVEADJUSTABLEABOVE FINISHED FLOORAGGREGATEAIR HANDLING UNITALUMINUMALTERNATEAMPEREANCHOR, ANCHORAGEANGLEANODIZEDACCESS PANELAPPROXIMATEARCHITECT/ARCHITECTURALASBESTOSASPHALTATTENTIONACOUSTICAL TILEAUTOMATICATBALBATTBRGBD.BEL.BETN.BIT.B.J.B.JT.BLDG.BLK.BLKG.BM.B.M.B.M.U.BOTT.B.PL.BRBRG.BRK.B.S.B.W .BSMT.B.T.U.B.U.R.BALANCEBATTENBEARINGBOARDBELOWBETW EENBITUMINOUSBAR JOISTBED JOINTBUILDINGBLOCKBLOCKINGBEAMBENCH MARKBRICK MASONRY UNITBOTTOMBEARING PLATEBEDROOMBEARINGBRICKBOTH SIDESBOTH WAYSBASEMENTBRITISH THERMAL UNITBUILT-UP ROOFCAB.CAP.C.B.CER.CEM.C.FL.C.F.C.G.CHAM.CHG.C.I.CIR.C.J.C.JT.CK.CLC.L.CLG.CLOSCLR.C.M.T.C.M.U.COL.CONC.CONC. BLKCONC. FLCOND.CONN.CONST.CONT.CONTR.CORR.CPT.CSK.CSMT.C.ST.C.T.CABINETCAPACITYCATCH BASINCERAMICCEMENTCOUNTERFLASHINGCUBIC FEETCORNER GUARDCHAMFERCHANGECAST IRONCIRCLECONSTRUCTION JOINTCONTROL JOINTCAULKINGCENTER LINECHAIN LINKCEILINGCLOSETCLEARCERAMIC MOSAIC TILECONCRETE MASONRY UNITCOLUMNCONCRETECONCRETE BLOCKCONCRETE FLOORCONDUITCONNECTIONCONSTRUCTIONCONTINUOUSCONTRACT (CONTRACTOR)CORRIDORCARPETCOUNTERSINKCASEMENTCAST STONECERAMIC TILELIST OF ABBREVIATIONS (ALPHABETIZED)C.T.CTR.C.W .C.FT.C.YD.CERAMIC TILECOUNTERCOLD WATERCUBIC FEETCUBIC YARDD.D.A.DBL.DEMO.DEP.DEPT.DET.D.F.D.H.DIA. or ɸDIAG.DIS.DIFF.DIM.DIR.DIV.D.L.DN.DO.DP.DP.M.DR.D.S.DTL.DW .D.W .D/WDW G.DW R.DRAINDOUBLE ACTINGDOUBLEDEMOLISH, DEMOLITIONDEPRESSEDDEPARTMENTDETAILDRINKING FOUNTAINDOUBLE HUNGDIAMETERDIAGONALDISPENSERDIFFUSERDIMENSIONDIRECTORYDIVISIONDEAD LOADDOW NDITTODAMPROOFINGDAMPROOFING MEMBRANEDOORDOW NSPOUTDETAILDRYW ALLDUMBW AITERDISHW ASHERDRAW INGDRAW ERE.EA.E.B.E.F.E.J.EL.ELVELEC.EMER.ENC.ENGR.ENT.E.P.EQ.EQUIP.EST.E.W .E.W .C.E.W .H.EXCA.EXH.EXIST.EXP.EXT.EASTEACHEXPANSION BOLTEACH FACEEXPANSION JOINTELEVATIONELEVATORELECTRICEMERGENCYENCLOSE (URE)ENGINEERENTRANCEELECTRIC PANELBOARDEQUALEQUIPMENTESTIMATEEACH WAYELECTRIC WATER COOLERELECTRIC WATER HEATEREXCAVATEEXHAUSTEXISTINGEXPOSEDEXTERIORFABF.A.F.B.F.B.C.F.B.O.F.D.F.E.F.F.F.E.C.F.F.E.F.F.L.F.G.FGL.FIGFIN.FIXT.F.JT.FLSHG.FLR.FLUR.FND.FP.FPL.FR.F.S.FTFTG.FUR.FUT.F.V.FABRICATEFIRE ALARMFACE BRICKFLORIDA BUILDING CODEFUNISHED BY OTHERSFLOOR DRAINFIRE EXTINGUISHERFACTORY FINISHEDFIRE EXTINGUISHER CABINETFINISHED FLOOR ELEVATIONFINISHED FLOOR LINEFIXED GLASSFIBERGLASSFIGUREFINISHEDFIXTUREFLUSH JOINTFLASHINGFLOORFLUORESCENTFOUNDATIONFIREPROOFFIREPLACEFRAME (D) (ING)FULL SIZEFOOTFOOTINGFURREDFUTUREFIELD VERIFYG.GASGA.GAUGEGAL.GALLONGALV.GALVANIZEDG.B.GRAB BARG.C.GENERAL CONTRACT(OR)GD.GRADEG.I.T.GLAZED INTERIOR TILEGKT.GASKETGL.GLASS, GLAZINGGOVT.GOVERNMENTG.P.GALVANIZED PIPEGRN.GRANITEG.R.V.GRAVITY ROOF VENTILATORG.S.GRAVEL STOPGT.GROUTG.W.B./GYP. BD.-- GYPSUM WALLBOARDHH.B.H.C.H.D.HDW .H.F.E.H.M.HOR.HR.HT.HGT.HVAC.H.W .HW DHIGHHOSE BIBHOLLOW CORE or HANDICAPPEDHEAVY DUTYHARDW AREHALON FIRE EXTINGUISHERHOLLOW METALHORIZONTALHOURHEIGHTHEATINGHEATING, VENTILATINGAND AIR CONDITIONINGHOT WATERHARDW OODI.D.ILK.IN.INCL.INSULINT.INV.INSIDE DIAMETERINTERLOCKINCHESINCLUDEINSULATIONINTERIORINVERTJAN.JBJ.F.JST.JT.JANITORJUNCTION BOXJOINT FILLERJOISTJOINTKDKNOCK DOWNKOKNOCK OUTK.S.KNEE SPACEL.LAB.LAMLAM. PLAS.LAV.LG.L.H.LINOLIN. FT.LKR.L.L.L.L.H.L.L.V.LMS.LT.L.T.LTL.LVR.LW .LW .C.LENGTHLABORATORYLAMINATEDLAMINATED PLASTICLAVATORYLONGLEFT HANDLINOLEUMLINEAL FEETLOCKERLIVE LOADLONG LEG HORIZONTALLONG LEG VERTICALLIMESTONELIGHTLIQUID TILELINTELLOUVERLIGHTW EIGHTLIGHTWEIGHT CONCRETEM.MACH.MAR.T.MAS.MAX.M.B.MBR.M.C.MED.MTL.MECH.MFR.M.H.M.H.O.MIN.METERMACHINEMARBLE THRESHOLDMASONRYMAXIMUMMARKER BOARDMEMBERMEDICINE CABINETMEDIUMMETALMECHANICALMANUFACTURE (R)MANHOLEMAGNETIC HOLD OPENMINIMUMMIR.MISC.MLD.M.O.MOD.MOV.MRMT.MTL.MULL.MICRON.N/ANAT.N.I.C.NO.NOMN.R.N.T.S.OA.O.A.OBS.O.C.O.D.OFF.OH.O.H.O.J.OPG.OP.H.OPP.PC.CPED.PERF.PERI.PERM.PERPP.F.L.PFD.P.G.PK.PL.P.L.PLAS.PNL.PR.PRES.PREENG.PREFAB.PREP.PROJ.PSC.PSF.PSI.P.T.P.T.D.PTN.PW D.PVC.Q.T.QTR.QTY.R.R.A.RAD.R.C.P.R.D.RECEP.RECT.REF.REFLREGREINF.REQ.RES.RET.REV.RFG.RF.H.RHR.L.RM.R.O.R.O.W .MIRRORMISCELLANEOUSMOLDINGMASONRY OPENINGMODULARMOVABLEMOISTER RESISTANTMOUNTEDMATERIALMULLIONMICROW AVENORTHNOT APPLICABLENATURALNOT INCLUDED IN THIS CONTRACTNUMBERNOMINALNOISE REDUCTIONNOT TO SCALEOVERALLOUTSIDE AIROBSCUREON CENTEROUTSIDE DIAMETEROFFICEOVERHEADOVERHANGOPEN-WEB JOISTOPENINGOPPOSITE HANDOPPOSITEPRECAST CONCRETEPEDESTALPERFORATE (D)PERIMETERPERMANENTPERPENDICULARPOUNDS PER LINEAL FOOTPREFINISHEDPLATE GLASSPARKINGPLATEPROPERTY LINEPLASTERPANELPAIRPRESSUREPRE-ENGINEEREDPRE-FABRICATEDPREPAREPROJECTORPRESTRESSED CONCRETEPOUND PER SQUARE FOOT (FEET)POUNDS PER SQUARE INCHPRESSURE TREATEDPAPER TOWEL DISPENSERPARTITIONPLYW OODPOLYVINYL CHLORIDEQUARRY TILEQUARTERQUANTITYRISERRETURN AIRRADIUSREINFORCED CONCRETE PIPEROOF DRAINRECEPTACLERECTANGULARREFERENCE, REFRIGERATORREFLECTIVEREGISTERREINFORCEDREQUIREDRESILIENTRETURNREVISION OR REVISEDROOFINGROOF HATCHRIGHT HANDEDRAIN LEADERROOMROUGH OPENINGRIGHT OF WAYRVS.REVERSES.S4S.SAN.S.B.C.SC.S.C.SCH.SCN.S.D.SEC.SERV.SGL.SHSHT.SHTH.SIM.S.J.SKY.SL.SP.SPEC.SPK.SQ.SQ. FT.SS.S.S.ST.STD.STO.STR.SUBSUSP.SYMSYS.SOUTH, SWITCHSURFACED FOUR SIDESSANITARYSOUTHERN BUILDING CODESOLID CORESEALED CONCRETESCHEDULEDSCREENSTORM DRAINSECTIONSERVICESINGLESHELFSHEETSHEATHINGSIMILARSAW JOINTSKYLIGHTSLEEVESOUNDPROOFINGSPECIFICATIONSPEAKERSQUARESQUARE FEETSERVICE SINKSTAINLESS STEELSTEELSTANDARDSTORAGESTRUCTURALSUBCONTRACTORSUSPENDEDSYMMETRICALSYSTEMT.T.B.T.C.TEL.TERRT.G.,TEM.T>&BTHK.THR.THRU.T.J.TKBD.T.O.W .TPTN.T.P.D.T.S.T.V.TYP.THREADTACK BOARDTERRA COTTATELEPHONETERRACETEMPERED GLASSTONGUE & GROOVETOP AND BOTTOMTHICKNESSTHRESHOLDTHROUGHTOOLED JOINTTACKBOARDTOP OF WALLTOILET PARTITIONTOILET PAPER DISPENSERTUBULAR STEELTELEVISIONTYPICALUC.UNF.ULU.N.O.UR.UNDERCUTUNFINISHEDUNDERWRITERS LABORATORYUNLESS NOTED OTHERWISEURINALV.VAC.VAR.V.C.T.VERT.VEST.VOL.VENTVINYLVACUUMVARNISHVINYL COMPOSITION TILEVERTICALVESTIBULEVOLUMEVENTILATIONW.W/W .B.W .C.W D.W .G.W .H.W /HW DW .W .I.W .M.W /OW .P.W .R.W T.W .W .F.W .W .M.W ESTW ITHWOOD BASEWATER CLOSETW OODWIRE GLASSWALL HUNGWATER HEATERW INDOWWROUGHT IRONWIRE MESHW ITHOUTWATERPROOF (ING)WATER REPELLENTW EIGHTWELDED WIRE FABRICWELDED WIRE MESH15"MAX.CONTROLAREASHOWER HEADW/ SPRAY HANDLEH.C.WATERCLOSET12"42" MINFEMININE NAPKINDISPOSAL WHERESPECIFIEDWASTERECEPTACLEGRAB BARBENCHTOWEL BARTOILETPAPERHOLDERSTANDARD MOUNTING HEIGHTSH.C.URINALH.C. TILTMIRRORPAPERTOWELDISPENSERWARMAIRHANDDRYERH.C.LAV17" MIN8" 6"MI MANXWALLCLOCK- LIGHT SWITCH- THERMOSTAT- FIRE ALARM- WINDOW CORD- INTERCOM CONTROLFIRE ALARMHORNFIRE ALARMSTROBEFIREEXTINGUISHERELECTRICALRECEPTACLESEMERGENCY BATTERYLIGHT BACK-UPROOM NAME& ROOMNUMBERH.C.WATERCOOLER17"-19"8" 6"MI MANXTV MOUNTINGBRACKETTYP MARKERBOARDOR TACKBOARDBASEIMPACTGWB 1 SIDEGWB 1SIDESOUNDBATT.INSULATION3-5/8" METALSTUDS @ 16"o.c.AGWB EA.SIDESOUNDBATT.INSULATION3-5/8" METALSTUDS @ 16"o.c.BCERAMICTILE 1 SIDETO 6'-6"CERAMICBACKER BOARDSOUNDBATT.INSULATION3-5/8" METALSTUDS @ 16"o.c.CNOTE: WALL HEIGHTS SHALL BE 12" ABOVE HIGHEST ADJACENT CEILING HEIGHT U.O.N.CERAMICTILE 1 SIDETO 6'-6"CERAMICBACKER BOARDGWBSOUNDBATT.INSULATION3-5/8" METALSTUDS @ 16"o.c.DWALL TYPESGWB EA.SIDESOUNDBATT.INSULATION6" METALSTUDS @ 16"o.c.ECERAMICTILE 1 SIDETO 6'-6"CERAMICBACKER BOARDSOUNDBATT.INSULATION6" METALSTUDS @ 16"o.c.FCERAMICTILE 1 SIDETO 6'-6"CERAMICBACKER BOARDGWBSOUNDBATT.INSULATION6" METALSTUDS @ 16"o.c.GGWB 1 SI DESOUNDBATT.INSULATION6" METALSTUDS @ 16"o.c.8" CMUHJGWB 1 SI DE1.5" FURRINGSTRIPS1.5" RIDGIDINS.STUCCO8" CMUKRevisionsNo. Desc. DateCRGCRG ARCHITECTS/ PALATKA, INC.216A ST. JOHN'S AVE.PALATKA, FL 32177AA0 0 0 2 6 0 4p. 386 - 325 - 0213f. 386 - 328 - 1401BID SETSeal / SignatureProject numberDateDrawn byChecked by015ZA0811-19-T25BJKA002OFScaleSHEETS1 : 35SOUNDBATTS5/8" GWBJAMBBEYONDSOUNDSEALMTL.STUDS@ 16" 0.C.5/8" IMPACT GWBMTL. RUNNERHOLLOWMTL. FRAMEWOOD DOORHEADMTL.STUDS@ 16" 0.C.SOUNDBATTS5/8" IMPACT GWBHOLLOWMTL. FRAMEANCHOR CLIP3 PER JAMBWOOD DOORJAMBDOOR JAMBBEYONDCARPETSTC RATEDWOOD DOORMECHANICALSOUND SEALVINYL TRANSITIONSTRIPSILL3HEAD JAMB SILLSCALE: 3" = 1'-0"NumberG0043G0047G0048G0049G0050G0051G0051AG0052G0055G0056G0057NameRoom ScheduleFloor Finish Base FinishMECHOFFICEOFFICEOFFICEOFFICEEQUIPMENTCLOSETSUPPLIESOFFICESUPPLIESCONFERENCE ROOM-CPTCPTCPTCPT---CPTLVTPCPTVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLVINYLWall Finish Ceiling FinishGWB, IMPACT GWBGWB, IMPACT GWBGWB, IMPACT GWBGWB, IMPACT GWBGWB, IMPACT GWBGWB, IMPACT GWBGWB, IMPACT GWBGWB, IMPACT GWBGWB, IMPACT GWBGWB, IMPACT GWBGWB, IMPACT GWB-2' x 2' ACT (AT-1)2' x 2' ACT (AT-1)2' x 2' ACT (AT-1)2' x 2' ACT (AT-1)2' x 2' ACT (AT-1)2' x 2' ACT (AT-1)2' x 2' ACT (AT-1)2' x 2' ACT (AT-1)2' x 2' ACT (AT-1)2' x 2' ACT (AT-1)DOOR SCHEDULEFrameDoorMark WHT Material Door Type Material Hardware Fire Rating Comments013' - 0"7' - 0" 1 3/4"HMHALF-LITEWDOFFICE023' - 0"7' - 0" 1 3/4"HMSOLIDWDSUPPLIES033' - 0"7' - 0" 1 3/4"HMHALF-LITEWDOFFICE043' - 0"7' - 0" 1 3/4"HMHALF-LITEWDOFFICE053' - 0"7' - 0" 1 3/4"HMHALF-LITEWDOFFICE063' - 0"7' - 0" 1 3/4"HMHALF-LITEWDOFFICE073' - 0"7' - 0" 1 3/4"HMHALF-LITEWDOFFICE083' - 0"7' - 0" 1 3/4"HMHALF-LITEWDOFFICE093' - 0"7' - 0" 1 3/4"HMSOLIDWDSUPPLIES103' - 0"7' - 0" 1 3/4"HMSOLIDWDSUPPLIES02,7,802,702,7,802,7,802,7,802,7,802,7,802,7,802,702,7DOOR SCHEDULE LEGEND2 PANELSFMGLSC/WDHMALUMEE RELTHRESHMETWDHLFNL2 PANEL WOOD DOOR (CHERRY)STOREFRONTMETAL (GALV. ) W/ INSULATED COREGLASSSOLID CORE WOOD (PRE-FINISHED)HOLLOW METALALUMINIMEXISTINGEXISTING RELOCATEDTHRESHOLDMETALWOODHALF-LITEFLUSHNARROW-LITEDOOR SCHEDULE NOTES1.PROVIDE NEW HOLLOW CORE PRE-FINISHED 2 PANELWOOD DOORS AND FRAME.2.PROVIDE NEW SOLID CORE PRE-FINISHED FLUSH WOODDOORS AND HM FRAME.3.PROVIDE NEW STOREFRONT DOORS AND/OR WINDOWSAND FRAME.4.PROVIDE NEW ALUM. THRESH (1/2" MAX HEIGHT)5.1 HOUR FIRE RATED6.PROVIDE NEW MARBLE THRESH7.PROVIDE LVT TRANSITION STRIP8.SOUND RATED DOOR-LITE KIT STC-359.PROVIDE ADA COMPLIANT DOOR OPENING DEVICEGENERAL NOTE: CONTRACTOR SHALL KEY NEW DOORS ALL ONTHE SAME KEYING SYSTEM. CO ORDINATE REQUIRED KEYING WITHOWNER.FINISH SCHEDULE LEGENDCONCCTVCTWDELPCPTCONCRETE (TROWEL FINISH, SEAL)CERAMIC FLOOR TILEVINYL COMPOSITION TILE6" WOOD BASEEXISTINGLAMINATE PLASTICCARPET TILEFINISH SCHEDULE NOTES1.GWB AT WALLS SHALL HAVE A FINISH THAT MATCHESEXISTING ADJACENT WALL TEXTURE2.PAINT SHEEN AT WALLS SHALL BE EGGSHELL3.GWB AT CEILINGS SHALL HAVE A SMOOTH LEVEL 4 FINISH4.EXISTING WALLS TO BE PROTECTED, PATCH AND REPAIREXISTING SURFACES AND SEAL5.PROVIDE (2) COLORS OF PAINT AT WALLS, ARCHITECTSHALL PROVIDE DIRECTIONWDGLGWBCMUEXPMRGWBAT-1WOODGLAZING OR GLASSGYPSUM WALL BOARD (PAINTED)CONCRETE MASONRY UNITS (PAINTED)EXPOSEDMOISTURE RESISTANT GYPSUM WALL BOARDCEILING TILE (24" x 24" TEGULAR TILE)6.1' X 2' CERAMIC FLOOR TILE (1 COLOR)7.1' x 2' CERAMIC WALL TILE (2 COLORS)8.PROVIDE 4" ENCAPSULATED BATT INSULATION OVERENTIRE CEILING9.PROVIDE WOOD CHAIR RAIL AT ALL WALL SERVICES10. PROVIDE LAP SIDING WAINSCOT AND CHAIR RAIL11. PAINT SHEEN AT WALLS SHALL BE SEMI-GLOSSPREP EXISTING CMU WALLS w/ MOLD INHIBITOR & PAINTDNOFFICEOFFICEOFFICEOFFICECLOSET EQUIPMENT SUPPLIESG0047G0048G0049G0050G0051A G0051G00520405ADD SOUND BATT INS. ABOVE EXISTING DROP CEILINGS0607080910MECHG00432DNA3001A300REMOVE EXTERIOR WALLSHEATHING. ADD SOUND BATT INS.ADD (1) LAYER OF 5/8" IMPACT GWBCORRIDORG0031EXTEND TOP OF WALLS TOUNDERSIDE OF ROOF DECK,PROVIDE SOUND BATT INS.IN WALL CAVITIES3A1013SOUNDA101RATEDDOOR-LITEKIT STC-353A1013A101FIELD VERIFY1"INSULATEDGLASS6A200HALF-LITEDOORSOLID CORE WDHM FRAME, PAINTHALF-LITEDOORSOLID CORE WDHM FRAME, PAINT3A1014DOOR ELEVATIONSSCALE: 1/2" = 1'-0"3A1015 WINDOW ELEVATIONSCALE: 1/2" = 1'-0"UPPER SPACE OF GYM FLOOR BELOWRevisionsNo. Desc. DateCRGCRG ARCHITECTS/ PALATKA, INC.216A ST. JOHN'S AVE.PALATKA, FL 32177AA0 0 0 2 6 0 4p. 386 - 325 - 0213f. 386 - 328 - 1401BID SETEXISTING ELEC PANELEXISTING ELEC PANELSGYM 1ST 2 SCALE: 1/16" = 1'-0"16' - 2 3/4"DN10' - 2"A20071A3001' -2" 3' -0"0117' - 6"5' - 10" 3' -0"7' - 10"23' - 0"8' -3"3' -0" 2' -3" 3' -0" 2' -6" 3' -0" 2' -6" 3' -0" 2' -6" 3' -0" 2' -4"02034-A2--0- 0CORRIDORG0030OFFICEG0055229 SFG0055SUPPLIESG0056100 SFG0056CONFERENCEROOMG0057302 SFG00571 1/2" FURRING STRIPS, 5/8" GWB55' - 11 1/4"EXTEND TOP OF WALLS TOUNDERSIDE OF ROOF DECK,PROVIDE SOUND BATT INS.IN WALL CAVITIESDN2A300MECHG00531OVERALL SECOND FLOOR PLANSCALE: 1/8" = 1'-0"GENERAL NOTE:OWNER SHALL REMOVE ALL FURNITURE PRIOR TO CONSTRUCTION ACTIVITIESSeal / SignatureProject numberDateDrawn byChecked by015ZA0811-19-T25BJKA101OFSH EETSScaleAs indicatedCEILING PLAN LEGEND24" x 24" SUSPENDEDACOUSTICAL CEILINGTILE SYSTEMDENSGLASSEXTERIORBOARD CEILINGGYPSUM BOARDCEILINGAT-1, AT-2, GWB,EXPOSED, ETC.(SEE SPECS)CEILING TYPE(SEE SPECS)CEILING TYPEHEIGHT A.F.F.24" x 48" LED LIGHTFIXTURE (SUPPORT ALL 4SIDES w/ TIE WIRES)PENDANTLIGHT FIXTUREEMERGENCY 24" x 48" LEDLIGHT FIXTURE (SUPPORTALL 4 SIDES w/ TIE WIRES)EMERGENCYPENDANTLIGHT FIXTURE24" x 24" LED LIGHTFIXTURE (SUPPORT ALL 4SIDES w/ TIE WIRES)DECORATIVEPENDANTLIGHT FIXTURE48" LED SURFACEMOUNTEMERGENCY 48"LED SURFACEMOUNTLED TRACKLIGHTINGWALL MOUNTEDLIGHT FIXTUREEXIT LIGHTFIXTUREEXTRACTORFANRECESSEDDOWNLIGHTFIXTUREEMERGENCYRECESSEDDOWNLIGHTFIXTUREAIR SUPPLYAIR RETURNEXIT SIGN WITHEMERGENCY LIGHTINGREMOVE & REPLACE EXISTING WINDOWS w/ 1" INSULATED. FIELD VERIFY SIZESRevisionsNo. Desc. DateLOUVERED VENTLevel 526' - 0"CRGCRG ARCHITECTS/ PALATKA, INC.216A ST. JOHN'S AVE.PALATKA, FL 32177AA0 0 0 2 6 0 4p. 386 - 325 - 0213f. 386 - 328 - 1401BID SET6NORTH INT. ELEVATIONSCALE: 1/4" = 1'-0"1A3003' -0"FLOOR FINISH LEGEND18" x 18" LUXURYVINYL TILE (LVT)LUXURY VINYLTILE PLANK(LVTP)CARPET TILE (CPT)7 SOUTH INTERIOR ELEVATIONSCALE: 1/4" = 1'-0"17' - 6"7' - 10"1A300ELEC LEGENDOUTLETOUTLET QUADDATA010203CPTOFFICEG0055229 SFSUPPLIESG0056100 SFEXISTING CONC.FLOORPROTECTTVCPT4PARTIAL FLOOR PLAN SOUTHSCALE: 1/4" = 1'-0"23' - 0"CONFERENCEROOMG0057302 SF1 1/2" FURRING STRIPS, 5/8" GWBLevel 1.58' - 0"2 x 4 DIAGONAL BRACING @ TOP OF WALLS ABOVE CEILING7' -11 7/8"AT-1DISCONNECT8' -0"AT-1DISCONNECT, PLACE CONDENSER AT GRADE1 REFLECTED CEILING PLANSCALE: 1/4" = 1'-0"GENERAL NOTE: MECHANICAL EQUIPMENT CONTRACTOR SHALL SIZEDIFFUSERS APPROPRIATELY TO PROVIDE AIR AT THESE 3 SPACES8' -0"AT-1Level 1.58' - 0"Seal / SignatureProject numberDateDrawn byChecked by015ZA0811-19-T25BJKA200OFSH EETSScaleAs indicated
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
BID 25-26-12 51ST YEAR CDBG D...
SOLICITATION DOCUMENTS: BID 25-26-12 51ST YEAR CDBG DRAINAGE IMPROVEMENTS EXHIBIT A - BID
City of Hanllandale Beach
Bid Due: 7/16/2026
Florida National Cemetery, Na...
Follow Florida National Cemetery, National Shrine Turfgrass Renovation Project Active Contract Opportunity Notice
VETERANS AFFAIRS, DEPARTMENT OF