RFP for Professional Services - Eastside Parallel Trail Segment 2
Project Information
- Bid Title
- RFP for Professional Services - Eastside Parallel Trail Segment 2
- Issuing Agency
- Half Moon Bay city
- Location
- California
- Published Date
- Dec 15, 2025
- Closing Date
- Jan 23, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 2025-03
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 2025-03
Bid Title: RFP for Professional Services - Eastside Parallel Trail Segment 2
Category: Public Works Bids Status: Open Description: Greetings!
The City of Half Moon Bay is searching for Design Professionals with Caltrans experience to help us complete the Design and Permitting of our Eastside Parallel Trail, Segment 2 project.
About the Project
The Segment 2 project will complete a critical gap in the Eastside Parallel Trail through Half Moon Bay and provide connectivity along California Highway 1 between the existing Naomi Patridge Trail at Ruisseau Francais Avenue and the future Highway 1 North Trail at Spindrift Way.
Proposed Improvements include:
- New 12 ft class 1, bicycle/pedestrian trail between Russeau Francais Ave and Spindrift Way.
- New bicycle/pedestrian bridge over Frenchmans Creek, spanning approximately 200 linear feet.
- Intersection Improvements at Russeau Francais Avenue to enhance existing crosswalks, add an additional third crossing, and improve grading and drainage.
- Repair/replace an existing failed wood lagging retaining wall along the south side of the intersection.
- Bicycle/pedestrian crossing treatments (striping and signage) at Russeau Francais Avenue, Frenchmans Creek Road, and Spindrift Way
Please review the attached RFP, included instructions, and critical dates.
- Questions regarding the RFP and project materials will be accepted through 4:00pm on Friday, January 9 th , 2026.
- Proposals are due in electronic (PDF) format by 4:00pm on Friday, January 23 rd , 2026, per the instructions included.
You can find other information about the project at the City of Half Moon Bay webpage at:
https://www.halfmoonbay.gov/956/Eastside-Parallel-Trail-North---Segment-
Publication Date/Time: 12/15/2025 11:30 AM Closing Date/Time: 1/23/2026 4:00 PM Contact Person: Dale Leda, Interim City Engineer
dleda@halfmoonbay.gov
650-435-8260Qualifications: Refer to RFP for all qualifications and conditions. Related Documents: - Attachment Preview
-
Request for Proposals (RFP)Professional Services forEastside Parallel Trail, Segment 2City of Half Moon BayIssue Date: December 15, 2025Due Date: January 23, 2026 at 4:00 PM PSTCity of Half Moon Bay501 Main StreetHalf Moon Bay, CA 94403www.halfmoonbay.govDale LedaInterim City Engineerdleda@halfmoonbay.gov650-435-8260City of Half Moon BayEastside Parallel Trail, Segment 2RFP: Professional Services for Eastside Parallel TrailTHIS PAGE INTENTIONALLY LEFT BLANKPage 2City of Half Moon BayEastside Parallel Trail, Segment 2RFP: Professional Services for Eastside Parallel TrailTable of Contents1 RFP OVERVIEW .............................................................................................................................................. 51.1 PURPOSE OF RFP..............................................................................................................................................51.2 PROJECT DESCRIPTION .......................................................................................................................................51.3 RFP TIMELINE ..................................................................................................................................................61.4 RFP QUESTIONS ...............................................................................................................................................61.5 RFP AMENDMENT AND CANCELLATION.................................................................................................................61.6 SOQ SUBMITTAL ..............................................................................................................................................61.7 FEE SUMMARY SUBMITTAL .................................................................................................................................72 CITY OVERVIEW ............................................................................................................................................. 83 SCOPE OF SERVICES ....................................................................................................................................... 84 MINIMUM QUALIFICATIONS ....................................................................................................................... 125 GENERAL PROVISIONS ................................................................................................................................. 126 SOQ FORMAT AND SUBMISSION REQUIREMENTS....................................................................................... 136.1 SOQ FORMAT ................................................................................................................................................136.2 COVER LETTER................................................................................................................................................136.3 COMPANY PROFILE..........................................................................................................................................136.4 PROJECT UNDERSTANDING & APPROACH ............................................................................................................146.5 STAFF QUALIFICATIONS AND EXPERIENCE.............................................................................................................146.6 RELEVANT PROJECTS........................................................................................................................................146.7 REFERENCES...................................................................................................................................................146.8 FEE SUMMARY ...............................................................................................................................................147 FIRM SELECTION .......................................................................................................................................... 157.1 SOQ EVALUATION & INTERVIEWS......................................................................................................................157.2 AWARD OF CONTRACT .....................................................................................................................................157.3 BUSINESS LICENSE ...........................................................................................................................................167.4 DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) CERTIFICATION ...............................................................................167.5 LEGAL DISCLOSURES ........................................................................................................................................167.6 BACKGROUND CHECKS .....................................................................................................................................167.7 DISADVANTAGED BUSINESS ENTERPRISE (DBE) REQUIREMENTS ..............................................................................167.8 SUPPLEMENTAL REQUIREMENTS FOR FEDERAL FUNDED PROJECT .............................................................................178 PROTEST TO SPECIFICATIONS OR REQUIREMENTS ...................................................................................... 179 RFP TERMS AND CONDITIONS ..................................................................................................................... 179.1 REVIEW OF RFP..............................................................................................................................................179.2 UNDUE INFLUENCE..........................................................................................................................................179.3 NONDISCRIMINATION ......................................................................................................................................179.4 SOQ PREPARATION COSTS ...............................................................................................................................189.5 SOQ WITHDRAWALS.......................................................................................................................................189.6 SOQ ERRORS .................................................................................................................................................189.7 INCORRECT SOQ INFORMATION ........................................................................................................................189.8 PROHIBITION OF PROPOSER TERMS AND CONDITIONS ............................................................................................189.9 RIGHT TO REFUSE PERSONNEL ...........................................................................................................................189.10 PROPOSAL OF ADDITIONAL SERVICES ..................................................................................................................189.11 LICENSURE .....................................................................................................................................................19Page 3City of Half Moon BayEastside Parallel Trail, Segment 2RFP: Professional Services for Eastside Parallel Trail9.12 CONFLICT OF INTEREST AND SOQ RESTRICTIONS ...................................................................................................199.13 CONTRACT NEGOTIATIONS................................................................................................................................199.14 RIGHT OF REJECTIONS ......................................................................................................................................199.15 DISCLOSURE OF SOQ CONTENTS........................................................................................................................199.16 PROPRIETARY INFORMATION .............................................................................................................................209.17 SEVERABILITY .................................................................................................................................................209.18 SOQ AMENDMENT .........................................................................................................................................209.19 SOQ ABANDONMENT......................................................................................................................................209.20 RIGHTS OF THE CITY.........................................................................................................................................2010 ATTACHMENTS........................................................................................................................................ 21Page 4City of Half Moon BayEastside Parallel Trail, Segment 2RFP: Professional Services for Eastside Parallel Trail1 RFP Overview1.1 Purpose of RFPThis Request for Proposals (“RFP”) is issued by the City of Half Moon Bay (“City”). The City seeksStatements of Qualifications (SOQ) from entities ("Proposer(s)") with demonstratedexperience and qualifications in providing Preliminary Engineer, Design, and Environmentalsupport for specific construction projects occurring within California Department ofTransportation (Caltrans) right-of-ways such as those required in this RFP. The City desires toenter into an agreement for one (1) year with the option for two (2) one-year renewals uponsatisfactory performance.1.2 Project DescriptionThe Eastside Parallel Trail Segment 2 project proposes improvements to extend a 12 ft multi-modal trail on the east side of California State Highway 1 (Highway 1) in the City of Half MoonBay between the intersections at Ruisseau Francais Avenue and Spindrift Way. The proposedproject will connect to the existing Naomi Patridge Trail to the north and the future Hwy 1North Safety & Operations trail to the south, a total distance approximately 2,100 linear feet.The project will also include a new approximately 200 ft bridge spanning over FrenchmansCreek to complete the new trail. Improvements will include crossing treatments at threevehicle intersections at Russeau Francais Avenue, Frenchmans Creek Road, and SpindriftWay.At the Ruisseau Francais intersection, additional improvements are desired to enhance theexisting crosswalks, add a southern crossing location and improve connectivity to the existingtrail on the west side of the highway. Anticipated improvements also include new curb gutterand sidewalk, curb ramps, drainage improvements, signage, and any required signalreconfiguration. Along the west side of the intersection, a new retaining wall is alsonecessary to repair an existing failed wood retaining wall supporting the existing trailsegment. Refer to Attachment 1 below for an illustrative concept plan for the proposedproject. The project will be designed and constructed in one phase.The scope of professional services requested, as further detailed below, includes thecomplete planning, environmental study and design work needed to permit and constructthe project (excluding construction engineering, related inspections and material testing),which is anticipated to follow the Caltrans DEER project delivery/permit process.The project team will be required to prepare supporting documents needed foroversight/approval via the Office of Special Funded Projects (OSFP), including AdvancePlanning Study (APS) package and Structure Type Selection Report for the bridge, as well asall necessary supporting investigation and studies such as Foundation Report and HydraulicsReport, in accordance with Caltrans requirements.The scope of work also includes the preparation of all environmental studies and documentsfor both CEQA determination and NEPA support, as well as a Coastal Development Permit aspart of the entitlement process with the City of Half Moon Bay.Page 5
- Commodity Codes
-
- NAICS 541611Administrative Management and General Management Consulting Services
- NAICS 541990All Other Professional, Scientific, and Technical Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Patient Queuing System (Kiosk...
Follow Patient Queuing System (Kiosk) - VA Bakersfield Activation Active Contract Opportunity Notice
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/06/2026
SIGN ASM - DESTINATION, SIDE ...
Number Title Type NAICS Code(s) Due Date Issue Date Status RQ143943 SIGN ASM
LA Metro
Bid Due: 7/07/2026