Request for Proposal - Housing First Flooring Replacement
Project Information
- Bid Title
- Request for Proposal - Housing First Flooring Replacement
- Issuing Agency
- Tanana Chiefs Conference
- Location
- Alaska
- Published Date
- May 27, 2026
- Closing Date
- Jun 19, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Request for Proposal – Housing First Flooring ReplacementMay 27, 2026I. Solicitation
Tanana Chiefs Conference (TCC) is soliciting bids from qualified contractors for a floor replacement project at the Housing First Facility located at 1521 South Cushman Street, Fairbanks, Alaska.
Registration / Questions:Each IDIQ contractor must declare their intent to propose on this project by May 29, 2026 via email to
Project Manager Jeffry Coghill at jeffry.coghill@tananachiefs.org .Please include firm name, address, telephone number, email address, and name of contact person.
Site Visit:A non-mandatory site visit will be held at 10:00 AM on June 4, 2026 on site.
Written Questions and Addenda Publication:All questions must be submitted in writing to
Bid Submission Deadline:
jeffry.coghill@tananachiefs.org
on or before June 11, 2026, by 2:00 PM Alaska Time (AKT).Bids must be received by email no later than
June 19, 2026, at 2:00 PM Alaska Time (AKT), sent to
jeffry.coghill@tananachiefs.org .Bids received after the time announced will not be considered, unless otherwise determined by TCC.
Additional Bid Submission Details:- Only emailed electronic bids will be accepted. A delivery and read receipt is recommended.
- Bids will not be opened publicly.
- Faxed bids will not be accepted.
Tanana Chiefs Conference is a non-profit Tribal Organization that provides health services, education, training,
Project Team:
and workforce development opportunities to more than 10,000 Alaska Natives located in 42 villages throughout Interior Alaska.- Owner: Tanana Chiefs Conference
- Project Manager: Jeffry Coghill, jeffry.coghill@tananachiefs.org
Method: Design-Bid-Build
III. Scope of WorkEach bidder shall thoroughly examine the work area and be familiar with the contract documents. The failure or neglect of a bidder to receive or examine any contract document, or any part thereof, shall in no way relieve it from any obligations with respect to its bid or to the contract. No claim for additional compensation shall be allowed which is based upon a lack of knowledge of any contract document.
The scope of work includes the following activities:
A. Demolition: Reference Appendix B #1 for site-specific drawings and demolition parameters.
B. New Construction: Reference Appendix B #2 for site-specific drawings and specified replacement flooring and cove base.
C. Inspections: A substantial completion inspection shall be carried out by TCC at the approval of the TCC Project Manager, with 5 days’ notice from the Contractor.
D. Work Plan & Schedule: Immediately after the Notice of Intent to Award, the Contractor is responsible for developing and submitting a formal Work Plan & Schedule based on procurement of the required materials and phasing of the project. Contractor shall also submit product data for approval for all products incorporated into the work. The Work Plan & Schedule will be used by TCC to notify building users of upcoming activities and coordination. The Contractor will provide 2-week look ahead schedules as work progresses and update the document weekly during construction activities. The Work Plan & Schedule shall be submitted to TCC for review within seven working days of the NOITA.
E. Close-Out: Contractor will provide as-built drawings denoting variation from design, O&M data as applicable to equipment, and any on-site owner training required to operate and maintain the equipment safely and effectively.
- Attachment Preview
-
HOUSING FIRSTFLOORINGREPLACEMENTMay 21, 2026HOUSING FIRST FLOORING REPLACEMENTTABLE OF CONTENTSMay 21, 2026I.SOLICITATION .................................................................................................................................... 3II.PROJECT OVERVIEW .......................................................................................................................... 3III. SCOPE OF WORK................................................................................................................................ 4IV. SCHEDULE ......................................................................................................................................... 6V.WORK CONSIDERATIONS/RESTRICTIONS ............................................................................................ 6VI. PREVAILING WAGE ............................................................................................................................ 7VII. BID SUBMISSION REQUIREMENTS ...................................................................................................... 8VIII. BID EVALUATION ............................................................................................................................... 8IX. TERMS AND CONDITIONS................................................................................................................... 9X.APPENDICES ...................................................................................................................................... 9• APPENDIX A - Bid Form• APPENDIX B - Drawings & Supporting Documents• Appendix C - Insurance Requirments2HOUSING FIRST FLOORING REPLACEMENTMay 21, 2026I. SolicitationTanana Chiefs Conference (TCC) is soliciting bids from qualified contractors for a floor replacement project atthe Housing First Facility located at 1521 South Cushman Street, Fairbanks Alaska.Registration/Questions: Each IDIQ contractor must declare their intent to propose on project by May 29, 2026via an email to Project Manager, Jeffry Coghill; jeffry.coghil@tananachiefs.org. Include firm name, address,telephone, email address, and name of contact person.Site Visit: A non-mandatory site visit will be held at 10:00am June 4, 2026 on site.Written Questions and Addenda Publication: All questions must be submitted in writingto jeffry.coghill2tananachiefs.org on or before June 11, 2026,2026 by 2:00 PM Alaska Time (AKT).Bid Submission Deadline: Bids must be received by email no later than June 19, 2026, 2:00 PM (AKT), sentto jeffry.coghill@tananachiefs.org. Bids received after the time announced will not be considered, unlessotherwise determined by TCC.Additional bid submission details:• Only emailed electronic bids will be accepted - recommend setting a delivery and read receipt• Bids will not be opened publicly• Faxed bids will not be acceptedII. Project OverviewTanana Chiefs Conference is a non-profit Tribal Organization who provides health services, education, training,and work force development opportunities to more than 10,000 Alaska Natives located in 42 Villages throughoutInterior Alaska.3HOUSING FIRST FLOORING REPLACEMENTProject Team:Owner:Project Manager:Project Engineer:Designer:Tanana Chiefs ConferenceJeffry Coghill jeffry.coghill@tananachiefs.orgMay 21, 2026Project DeliveryMethod:Design-Bid-BuildIII. Scope of WorkEach bidder shall thoroughly examine the work area and be familiar with the contract documents. The failure orneglect of a bidder to receive or examine any contract document or any part thereof shall in no way relieve it fromany obligations with respect to its Bid or to the contract. No claim for additional compensation shall be allowedwhich is based upon a lack of knowledge of any contract document.The scope of work includes the following activities:A. Demolition: Reference Appendix B #1 for site specific drawings, and demo parameters.B. New Construction: Reference Appendix B #2 for site specific drawings and specified replacementflooring and cove base.4HOUSING FIRST FLOORING REPLACEMENTMay 21, 2026C. InspectionsA substantial completion inspection shall be carried out by TCC. At approval of TCC project manager,with 5 days notice from Contractor.D. Work Plan & Schedule: Immediately after the Notice of Intent to Award, the Contractor is responsiblefor developing and submitting a formal Work Plan & Schedule based on procurement of the requiredmaterials and phasing of the project. Contractor shall also submit for approval, product data for allproducts incorporated into the work. The Work Plan & Schedule will be used by TCC to notify buildingusers of upcoming activities and coordination. The Contractor will provide 2-week look aheadschedules as work progresses and update the document weekly during construction activities. TheWork Plan & Schedule shall be submitted to TCC for review within 7 working days of the NOITA.E. Close-Out: Contractor will provide as built drawings denoting variation from design, O&M data asapplicable to equipment, and provide any on site owner training required to operate and maintainthe equipment safely and effectively.5
- Commodity Codes
-
- NAICS 238330Flooring Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
ACS Loan Closet Kitchen Equip...
Follow ACS Loan Closet Kitchen Equipment Replacement Active Contract Opportunity Notice ID W912D0-24-R-0019
DEPT OF DEFENSE
Bid Due: 8/27/2027
ITB-26-15 Moore Street Senior...
Title Posted Date Closing Date ITB-26-15 Moore Street Senior Apartments Parking Lot Improvements
City of Fairbanks
Bid Due: 7/22/2026