Audio Equipment; ITB 019-026
Project Information
- Bid Title
- Audio Equipment; ITB 019-026
- Issuing Agency
- Liberty Public Schools
- Location
- Missouri
- Published Date
- Jun 22, 2026
- Closing Date
- Jun 25, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Audio Equipment; ITB 019-026
Bid Proposals Due: Thursday, June 25, 2026, at 2:00 PM CST
Q&A Document
Bid Document
The District reserves the right to reject any or all bids and waive any informality.
- Attachment Preview
-
LIBERTY PUBLIC SCHOOL DISTRICT1142 Southview Dr, Liberty, MO 64068 Telephone 816-736-5293QUESTIONS AND ANSWERSBID NUMBER: ITB 019-026, TITLE: AUDIO EQUIPMENTJune 22, 2026RE: Q&A DocumentThis Q&A document is being issued to address questions that were received from vendors ahead of the question submittal deadline.Q: Can the District confirm the expected end-user training requirement, including the number of sessions, approximateduration, location, and expected audience?A:Training would be done with 2 Fine Arts Technicians and potentially 3 teachers and 2 administrators, at a date mutuallyagreed upon. We would plan on this being a single session, but may be 1 session in each space. We are very familiar withthe QL5, and we don't expect that training session to be much at all. The DM7 console has been installed in other spaces andwe are becoming more familiar with it as it gets introduced more to our program.Q: Will the awarded vendor be allowed to access/export the existing Yamaha console files before installation so pre-programming can be completed ahead of cutover?A:Yes. All existing consoles will remain in place and operational until removed by the awarded vendor, as part of the Scope ofWork. The vendor will have full access to the consoles to copy and transfer files and information as needed onsite. This canbe previous to the install date, or during the install timeline.Q: Can the District confirm whether the existing Yamaha QL5 consoles, Dante network, analog cabling, stage boxes, andconnected devices are currently fully operational with no known issues?A:All consoles operate 100%. All networks are operating at 100%. There is a known issue about DDM and Yamaha's DM(7)IP Configuration not working well within its assigned domains. This is being worked on by Yamaha Pro-Audio (Japan) anda previous vendor. If needed, we can Multicast sends/receives across Dante Domains for functionality. If there is a solutionfor this that we have not come across, we welcome any input.Q: For the “commissioning to existing Dante and Analog settings to mimic existing routing” requirement, can the Districtconfirm that the intent is to replicate existing routing and functionality only, and not redesign the audio system orcreate new scenes/workflows?A:It is our intent to keep routing to the existing systems as is. Programming in any other control system (Q-Sys, Crestron...),except for Dante, is not part of this scope of work.Q: Will the District provide current Dante Controller files, IP information, device names, console show files, and anyexisting documentation for the current systems?A:Yes. The Fine Arts Technicians have full access to DDM and Controller to assist with network setup. Previous drawings,schematics may be available, we would need to consult Technology for any As Builts that may be available.Q: For Heritage Middle School, can the District confirm that all required network drops, switch ports, Dante networkconfiguration, and power are existing and owner-provided?A:At HMS, all Network drops, switch ports and power are all existing. We will work with technology to have a VLAN setupfor this new Dante location. This will be coordinated to be completed prior to the install window, so we can troubleshoot asneeded once equipment is on-site and installed.Q: Are any work hour restrictions expected, or can installation take place during normal business hours once scheduledwith Steffen Edwards?A:The only restriction that would exist are any events that the respective buildings may schedule before an award is made. Wewill block the space once a mutually agreed install time frame has been established, our install drop dead date remains priorto the beginning of back to work week for staff (Aug 14, 2026). If needed, non-traditional times are available (after schooltimes, evenings, overnights and weekends) should scheduling become an issue. As we approach that back to school part ofPage 1 of 2August, pre-school camps and audition sessions will begin in this and the surrounding space. The ability to do work remains,the ability to make extended noise through the PA/Routing testing would potentially be restricted.Q: Could you please provide additional clarification regarding the installation requirements for Item #3?Our currentunderstanding is that Item #3 is intended to be installed into Item #4. Please confirm whether this represents the fullextent of the required installation, or if there are additional installation requirements, components, connections,mounting details, coordination items, or related scope associated with these items.A:Item 3 is the RIO, Item 4 is the Case.The RIO is not installed into the console, or at the physical console location. The RIO will act as a stage box, connecting viathe Dante Network (existing) from the stage back to the OFE QL5 in the tech booth. The OFE console will take allconnections at its physical location in the tech booth via existing analog cabling.Item #3 will be / should be installed into item #4.Q: Can you explain how you plan to use the Yamaha PY-MIDI-GPI midi control card in your application?A:The intended application is for external software control programs, such as Q lab.Q: Page 33 requires the bidder to certify that it is duly licensed in Missouri for the type of work proposed. Would thisrequirement be satisfied if Bidder holds the appropriate general contractor or business license and the approved AVsubcontractor holds all trade licenses required for the onsite work?A:Yes, this requirement would be satisfied by the scenario you describe above.Q: The References form asks for organizations that the bidder’s company has provided services to. May Bidder userelevant project references from the proposed AV subcontractor performing the installation?A:Please provide references for Bidder with your bid response since the subcontractor cannot be confirmed at this stage.Q: Should the proposed subcontractor be identified with the bid, or would Bidder request written subcontractorapproval after award and before work begins?A:The subcontractor would need to be identified immediately following the bid award notification so that the subcontractor andtheir references can be identified and included in the contract document that will go to Board for approval. That is prior to aPO being issued.Q: Wage Order No. 33 is referenced, but the actual wage-order attachment does not appear to be included. Can theDistrict provide the applicable wage rates and confirm the worker classification expected for the AV installationwork?A:Here is the link to Wage Order No. 33. You would need to contact the State of Missouri Prevailing Wage office to determineclassification and wage rate.If you have any questions regarding this Q&A document, please reach out to Rachel.Naumann@lps53.org or 816-736-5293.Thank you,Rachel NaumannPurchasing ManagerLiberty Public School District 531142 Southview Dr | Liberty, MO | 64068Rachel.naumann@lps53.org | 816.736.5358Page 2 of 2
- Commodity Codes
-
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
- NAICS 334310Audio and Video Equipment Manufacturing
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFP 2026-17: Public Safety Em...
RFP 2026-17: Public Safety Emergency Radio System NOTICE TO BIDDERS Newton County Commission
Newton County
Bid Due: 7/16/2026
INVITATION FOR BID (IFB) DOC ...
INVITATION FOR BID (IFB) DOC 0000000058SL: Cosmetics for Canteen Resale-ER234R6032 Close Date 07/15/2026
State Government of Missouri
Bid Due: 7/15/2026