Opens March 31 ? EV Charging Facility Project ? Addendum #1
Project Information
- Bid Title
- Opens March 31 ? EV Charging Facility Project ? Addendum #1
- Issuing Agency
- Effingham city
- Location
- Illinois
- Published Date
- Mar 20, 2026
- Closing Date
- Mar 31, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Opens March 31 – EV Charging Facility Project – Addendum #1 Public Works bidsPosted on March 20, 2026
- Attachment Preview
-
Addendum #1City of E inghamEV Charging Facility ProjectAll holders of the plans and specifications for the City of E ingham “EV Charging FacilityProject” shall take into account that this Addendum #1 revises and amends the originalplans and specifications. The information in the answers provided below will take full forceand will hold over the plans and specifications.Any bidder shall sign this addendum and include it with their bid as anacknowledgement receipt. Failure to do so may subject bidder to disqualification. Pleaseplace this at the top of the bid packet.The information below consists mostly of clarifications or very nuanced changes. To drawattention to the larger changes, they have been highlighted green. Less substantial changesare highlighted gray.Q: Is only the electrical contractor required to be ICC certified, not for the site andconcrete work?A: That is correct. Just the electrical contractor is expected to have the ICCcertification for Electric Vehicle Charging Stations.Q: Does the electrical contractor need to be the prime contractor?A: No. The site contractor or the electrical contractor can be the prime.Q: Sheet 3 of the plans stating that (3) 125 amp 3 pole breakers are required. Is thatcorrect.A: This is a typographical error and should state that 2 are required.Q: Since Chargepoint is furnishing and installing the charger equipment under contractwith with the City, when would the Contractor have to be EV certified and go throughChargepoint training?A: EV certification is a separate thing from Chargepoint training. Ameren requires theICC Certification for EV work which must be done prior to the award of the contract.The Chargepoint training should be completed prior to installation of theirequipment but is not required prior to award of a contract.Q: Is there a specific color we are to use on the striping and EV Charging Logo?A: WhiteQ: Is there a specific logo you require for the EV Charging parking stall?A: Any markings that indicate EV Parking are expected to be acceptable. Contractor tosubmit for approval.This question brought to the City’s attention that signage is appropriate for thecharger. This addendum also adds the requirement to mount the following sign tothe southernmost bollard. The sign shall have the MUTCD designation of R7-111 andbe 12”x18”.Q: Is vapor barrier required under the slab or other concrete?A: No.Q: Is there a specific diameter of bollard you are requiring to be placed in front of thecharger?A: 6”Q: Are we to supply the parking block in the one slot? Only the one or do you want onein the future slot as well?A: There are no parking blocks for this project. It was inadvertently left on one of theplan sheets.Q: Are we requiring project fencing around this during construction?A: No.Q: Do we have a detail or spec on the subbase under the slab, sidewalk andfoundations?A: The initial plans and specifications did not require Aggregate Subbase. With thisaddendum we are adding the requirement of 4” of compacted crushed aggregatemeeting the IDOT CA6 gradation. This applies to pavement, sidewalk, and concretefoundation.Addendum acknowledged byPrinted name: __________________________________________Title: __________________________________________________Signature: ______________________________________________END OF ADDENDUM NO. 1
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541330Engineering Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
509 PARKING GARAGE RAILING RE...
BUYER: Sara Rogers (email for Bid Document) EMAIL: sara.rogers@dupagecounty.gov NOTICE TO BIDDERS NOTICE
DuPage County
Bid Due: 7/23/2026
Renovate Building/Upgrade Bui...
Project 624-060-045 Bid Date Tuesday, July 07, 2026 11:00 AM Description Renovate Building/Upgrade
Illinois Capital Development Board
Bid Due: 7/07/2026