Professional Engineering Services for Buckman Direct Diversion Facility
Project Information
- Bid Title
- Professional Engineering Services for Buckman Direct Diversion Facility
- Issuing Agency
- City of Santa Fe
- Location
- New Mexico
- Published Date
- May 7, 2026
- Closing Date
- Jun 12, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: Professional Engineering Services for Buckman Direct Diversion Facility
Addenda: 0
Release Date: 5/7/2026
Due Date: 6/12/2026
Professional Engineering Services for Buckman Direct Diversion FacilityFollowRequest For QualificationsBuckman Direct Diversion91107 , 92500 , 92597Project ID: FY26-TRFQP - A&E-094Release Date: Thursday, May 7, 2026· Due Date: Friday, June 12, 2026 3:00pmPosted Thursday, May 7, 2026 5:14pmAll dates & times in Mountain TimeDraft Response Events RSVP No Bid35 days, 19 hours, 48 minutesOverview
Post Information
Posted At:Thu, May 7, 2026 5:14 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryThe purpose of this Request for Qualifications (“RFQ”) is to solicit Statements of Qualifications (“SOQ” or “SOQs”) from a qualified Offeror interested in providing Professional Engineering Services for the redesign and reconstruction of portions of the Buckman Direct Diversion Facility (Facility) intake and raw water pumping facilities. This RFQ is being issued by the City of Santa Fe (City) on behalf of the Buckman Direct Diversion Board (Board).
BackgroundThe Facility is a diversion and treatment plant on the Rio Grande River near Santa Fe, New Mexico. The point of diversion is approximately 15 miles northwest of the City of Santa Fe and is located about three miles from the confluence of the Rio Grande River and Los Alamos Canyon.
The Facility was intended to operate in this fashion:
- Raw water is pulled from the Rio Grande diversion site.
- Sediment is removed near the diversion site through Lakos separators.
- Water is pumped uphill (1,100 vertical feet through 11 miles of 30” raw water pipe and three pump stations).
- The water is filtered and purified at an advanced treatment plant.
- Drinking water is then pumped to the utility providers.
- The illustration of the major systems in the process train are uploaded in the Vendor Questionnaire #18
The Board was created pursuant to a Joint Powers of Agreement between the City and Santa Fe County, effective March 11, 2005. The Board oversees the management and operations of the Facility. The Board is made up of two City Councilors, two County Commissioners, an At Large Citizen member, an Alternate Citizen member, and two non-voting representatives from the Las Campanas Community.
Under the Joint Powers Agreement for the Facility, the Board is responsible for diverting, treating, and transmitting surface water in accordance with respective diversion allocations and delivery demands.
The planning and design of the Facility began in 2001 and the Facility became operational in 2011. The Facility was expected by the Board to provide the necessary robust diversion, treatment, and reliable operations to meet much of the water demands of the City and the County for the foreseeable future. The Facility was intended to be able to divert, convey, and treat varying daily and monthly water diversion volumes, depending on water demands and source water availability. A maximum daily diversion of 20.8 MGD (32.2 CFS) at the river and 15 MGD net at the treatment plant could be needed at any time throughout the year.
The Facility does not currently operate or perform as anticipated or desired, due to a number of issues. Many of the issues can be attributed to the Facility’s inability to adequately address extensive seasonal and precipitation triggered fluctuations in sediment and turbidity conditions in the Rio Grande. To improve the Facility’s performance and operation, the Board anticipates that design and construction of a new intake facility to exclude sediment from entering the intake will be a first step priority, coupled with improvements to the sediment removal process.
The Facility is the foundation of a resilient water future for the partners and as such a permanent solution must be achieved.
Timeline
Issue RFP:May 7, 2026Pre-Proposal Meeting (Mandatory):May 18, 2026, 10:00amSite Visit (Mandatory):May 19, 2026, 10:00am341 Caja Del Rio RoadDeadline for Written Questions:May 22, 2026, 5:00pmResponse to Written Questions:May 26, 2026, 5:00pmProposals Due Date:June 12, 2026, 3:00pmEvaluation*:June 15, 2026, 10:00amOral Presentations*:June 23, 2026, 10:00amSelection of Finalists*:June 30, 2026Finalize Contracts*:July 9, 2026Contract Award*:July 31, 2026 - Commodity Codes
-
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
DETAILED MASTER PLAN AND DESI...
Type: COURTESY POSTING Due Date: 07/15/2026 ProcurementID: RFP 26-350-26-0001 Amendment 003 Agency Name:
State Government of New Mexico
Bid Due: 7/15/2026
ARCHITECTURAL AND/OR ENGINEER...
Type: COURTESY POSTING Due Date: 07/07/2026 ProcurementID: RFP No. 2026-03 Agency Name: S0169
State Government of New Mexico
Bid Due: 7/07/2026