Legal Notice: BMW Treatment Plant Clearwell Drain Piping Improvements
Project Information
- Bid Title
- Legal Notice: BMW Treatment Plant Clearwell Drain Piping Improvements
- Issuing Agency
- Clermont County
- Location
- Ohio
- Published Date
- Sep 22, 2026
- Closing Date
- Oct 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
BMW Treatment Plant Clearwell Drain Piping Improvements
ADVERTISEMENT FOR BIDS
Separate
sealed bids for the construction of the following Waterworks System Improvements
within the Clermont County Water
Resources Department will be received by the Board of County Commissioners,Clermont
County, Ohio, 101 East Main Street - 3rd Floor, Batavia, Ohio 45103, until 2:00 P.M. Local Time on Thursday, October 15, 2026,and then at said office publicly
opened and read aloud.PROJECT NO. 6401-60255
BMW
TREATMENT PLANT CLEARWELL DRAIN PIPING IMPROVEMENTSWork
under this Project is generally defined as the construction of approximately 16 lf of 12” ductile
iron water main and appurtenances and 128 lf of 10” and 770 lf of 16” PVC water
main and appurtenances at the BMW Treatment Plant located at 3960 Greenbriar
Road in Batavia Township from the existing 30” effluent water line to the four
sludge drying lagoons, to divert the flow from the clearwell to the sludge
drying lagoons using the existing 30” water main and high service pumps at the
BMW Treatment Plant. The Owner expects to proceed with the
construction under the Project immediately after satisfactory acceptance and
award of the construction bid and execution of the contract, with completion of
all work for Project No. 6401-60255 within 90 calendar days from
the date of the Notice to Proceed. The
Engineer’s Estimate for this Project is $ 869,389.00 .The
information for Bidders, Form of Bid, Form of Contract, Plans, and
Specifications including Forms of Bid Bond, Performance-Payment Bond, and other
Contractor Documents may be examined at the following Location:Clermont
County Water Resources Dept.Construction
Engineering Division4400
Haskell LaneBatavia,
Ohio 45103(513)
732-8864A Non-Mandatory Pre-Bid Meeting will
be held at the Clermont County Water Resources Department, Sanitary Engineering
Division, 4400 Haskell Lane, Batavia, Ohio
45103 at 1:00 P.M. Local Time on Thursday, October 8, 2026.
Copies of the Plans and
Specifications, etc., may be obtained during normal business hours at American
Reprographics Company (ARC), 4219 Malsbary Road, Blue Ash, OH 45242, phone
number (513) 326-2300, upon payment of Seventy Dollars ( $70 .00) for each printed
set or Thirty-Five Dollars ($35.00) for an electronic format set, with payment
made payable to the Clermont County Treasurer, none of which is
refundable. An additional non-refundable
payment of Ten Dollars ($10.00) must accompany any mail request.Each Bidder must submit their bid in TRIPLICATE, one (1) original and two
(2) copies with each copy stamped "COPY". Each bidder must deposit with his bid,
security in the amount of 100% of the bid if in the form of a Bid Bond or in
the amount of not less than ten (10%) percent of the bid if in the form of a
certified check, cashier's check or letter of credit, for and subject to the
conditions provided in the Information for Bidders and pursuant with Ohio
Revised Code Section 153.54.Attention of Bidders is particularly
called to the requirements as to safety regulations, conditions of employment
to be observed and minimum wage rates to be paid under the Contract. All bids must comply with Clermont County
General Instructions to Bidders in addition to the requirements set forth in
the Specifications Documents referenced herein in order to be considered. Letters of credit and bid bonds must be filed
with original signatures. Facsimile and electronic copies of the letter
of credit, bid bond and Power of Attorney of the Surety will be deemed
non-responsive.No Bidder may withdraw his bid for a
period of sixty (60) days after the actual date of the opening thereof. Contract
award shall be made to the lowest and best bidder, and award may be subject to
applicable funding agency approval.The Board of County Commissioners,
Clermont County, Ohio, reserves the right to reject any and all bids, to waive
any informalities in the bidding procedure, to accept any bid which it deems to
be for the best interest of the County and to hold such bids for a period of
sixty (60) days before taking action to award a contract. These rights are reserved up until the time
the contract is signed by the Board of County Commissioners.This notice will also be posted on the
contracting authority’s website at the following URL link: https://clermontcountyohio.gov/bids-proposals .Clermont
County Board of CommissionersBonnie J. Batchler, President
David L. Painter, Vice President
Claire B. Corcoran, Member
ATTEST: Gael
Fawley, Clerk of the Board - Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
PWC S. Construction Concrete ...
Solicitation ID: SRC0000042245 Solicitation Name: PWC S. Construction Concrete for New Storage Building
State Government of Ohio
Bid Due: 10/16/2026
Mosquito Lake Control Tower S...
Follow Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement Active Contract
DEPT OF DEFENSE
Bid Due: 10/26/2026