INDUSTRY DAY: Fort Carson Equipment Concentration Site - Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA)
Project Information
- Bid Title
- INDUSTRY DAY: Fort Carson Equipment Concentration Site - Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA)
- Issuing Agency
- DEPT OF DEFENSE
- Location
- Colorado
- Published Date
- Sep 21, 2026
- Closing Date
- Oct 6, 2026
- Government Level
- Federal
- Status
- Closed
- Ref. #
- W912QR-IndustryDay-FortCarsonECS-CMARwithOTA
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Set Aside
- No Set aside used
- Project Description
-
FollowINDUSTRY DAY: Fort Carson Equipment Concentration Site - Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA)ActiveContract OpportunityNotice IDW912QR-IndustryDay-FortCarsonECS-CMARwithOTARelated NoticeW912QR-PDB-FortCarsonECSDepartment/Ind. AgencyDEPT OF DEFENSESub-tierDEPT OF THE ARMYMajor CommandUS ARMY CORPS OF ENGINEERSSub CommandENGINEER DIVISION GREAT LAKES AND OHIOSub Command 2ENDIST LOUISVILLEOfficeW072 ENDIST LOUISVILLEGeneral Information View Changes
- Contract Opportunity Type: Special Notice (Updated)
- Updated Published Date: Sep 21, 2026 08:19 am MDT
- Original Published Date: Sep 17, 2026 11:51 am MDT
- Updated Response Date: Oct 06, 2026 09:00 am MDT
- Original Response Date: Oct 06, 2026 09:00 am MDT
- Inactive Policy: Manual
- Updated Inactive Date: Dec 31, 2027
- Original Inactive Date: Dec 31, 2027
-
Initiative:
- None
Classification- Original Set Aside: No Set aside used
- Product Service Code: Y1AZ - CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Colorado Springs , CO 80913USA
DescriptionThe U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for construction solicitation for Fort Carson ECS using CM@Risk under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release.
I. INDUSTRY DAY
USACE intends to conduct an Industry Day on 06 October 2026 at 0900 Mountain Time to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will provide interested parties with an opportunity to gain additional insight into the project and proposed Construction Manager at Risk (CM@Risk) approach under an Other Transaction (OT) framework, ask questions, and provide input in advance of the official Request for Qualifications (RFQ) release.
General questions from industry participants will be permitted during the Industry Day; however, all discussions and responses provided during the event are considered unofficial and are for informational purposes only. Statements made during the Industry Day do not constitute a commitment, authorization, or binding guidance related to the future Request for Qualifications (RFQ). Official Questions and Answers (Q&A) will be accepted and addressed following the release of RFQ.
Please use the direct special event link below to register for access to Fort Carson. You must be a U.S. Citizen and have a REAL ID to complete registration. If you do not, you must go the Fort Carson Visitor Control Center (located at Gate 1, located off 115 HW) with your State ID plus a U.S. Passport OR Certified birth certificate and Social Security Card to obtain access. Individuals with a valid CAC, should be able to access the installation directly.
Direct Special Event Link
https://pass.aie.army.mil/?b=usa&i=carson&e=M6JLHPVK
Physical Access Control POC: Mark Elliott (719) 466-1132 mark.d.elliott24.civ@army.mil
II. LOCATION/LOGISTICS
Industry Day Presentation location: Butts Army Airfield Hangar – 9620 Son Tay Road
NOTE: Onsite parking space may be limited, overflow parking is available in the vicinity
Site Visit – Primary parking lot is at the CBRN Chamber across the tank trail at the intersection of Minick Ave and Prussman Blvd. Additional parking is available on Minick Ave less than a quarter mile NW of the CBRN Chamber lot.
Onsite Directions Link Below. Turn by turn directions and map attached for download.
https://maps.app.goo.gl/U4o1XusLDWip4gn87
III. PROJECT OVERVIEW
- Project Title: Construction of an Equipment Concentration Site (ECS) Complex
- Location: Fort Carson, Colorado
- Agency: U.S. Army Corps of Engineers, Louisville District
- NAICS Code: 236220
IV. PROJECT DESCRIPTION
This acquisition will deliver a consolidated, fully functional ECS complex on an undeveloped 48-acre parcel of land at Fort Carson, CO. This site features a comprehensive range of facilities designed to support the mission of ECS-42, which is responsible for the maintenance and storage of key military assets assigned to 83 regional Army Reserve units.
The operational readiness of this military equipment is essential for both training Army Reserve Soldiers and equipping units from which the Active component will draw upon for critical warfighting capabilities inherent to deployable combat forces.
Core Facilities include:
- General Purpose Warehouse (GPW): A 39,313 square-foot (SF) secure, clear-span storage facility designed for the protection and preservation of military equipment.
- Area Maintenance Support Activity (AMSA) Shop: A 26,217 SF vehicle maintenance facility featuring advanced vehicle maintenance exhaust systems, overhead cranes, heavy-duty hoists, and specialized tool rooms.
- Organizational Storage Building: A 5,000 SF high-bay vertical storage facility.
- Container Storage Area: A 4,440-square-yard (SY) reinforced concrete layout for secure tactical container storage.
Supporting Infrastructure & Specialized Systems include:
- Heavy Equipment Parking & Site Work: A Military Equipment Parking (MEP) lot featuring extensive heavy-duty concrete pavements designed to withstand high-shear tracked and wheeled tactical vehicle loads, alongside POV parking, security fencing, and utility tie-ins.
- Tactical Vehicle Wash Facilities: Two dedicated, high-capacity vehicle wash racks/platforms featuring industrial filtration and water-recycling systems.
- Bi-Level Loading Ramp: A reinforced bi-level loading ramp designed to facilitate the rapid loading and unloading of heavy armored vehicles onto transport carriers.
- Specialized Foundations: Geotechnical engineering solutions, including deep foundation systems and soil stabilization, to mitigate volatile soil conditions across the 48-acre site.
- Fire Protection: Advanced fire detection and suppression systems, including specialized solutions for high-bay maintenance areas and hazardous material storage, compliant with all relevant UFC and NFPA standards.
- Cybersecurity: Facility-related control systems will be designed and implemented in accordance with UFC 4-010-06, ensuring the cybersecurity of all networked building systems.
- UFC Compliance: The entire facility complex will be designed and constructed to meet all applicable Unified Facilities Criteria (UFC), including AT/FP (Antiterrorism/Force Protection) standards and sustainable design principles as outlined in the Army Sustainable Design and Development Policy.
V. ACQUISITION STRATEGY - PRE-AWARD
USACE, Louisville District will use a streamlined competitive selection process:
- Step 1 –White Papers: Interested parties will submit a Statement of Qualifications (max # of pages to be defined in formal RFQ). Following evaluation of the qualification packages, the Government intends to down-select up to three (3) highest qualified firms to proceed to Step 2.
- Step 2 – Pitch Presentations: Down-selected firms will participate in live pitch meetings. One company will be selected as the Construction Manager for negotiation and award of Agreement 1 for preconstruction services. The Government intends to negotiate a Guaranteed Maximum Price (GMP) for construction of the ECS, which will be added as a bilateral modification at a later date.
VI. ACQUSITION STRATEGY – AWARD
The agreement will be awarded to the most qualified Construction Manager at Risk (CMAR) to provide preconstruction services and construction. Phase 1 of the CM@Risk agreement will include pre-construction services. The selected CMAR will act as an expert consultant to the Government, collaborating directly with USACE and the third-party Designer of Record during active design progression. The Government’s intent is to award the Phase I Agreement for Preconstruction Services prior to the 65% design review meeting. Phase 2 of the agreement will include scope for all construction activities necessary to complete the project. The agreement will be Firm-Fixed-Price (FFP).
All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Project RFQ.
VII. Virtual Participation Opportunity:
For those who are unable to attend the Industry Day even in person, the Louisville District plans to stream the event through Microsoft Teams. The details related to the MS Teams event are provided below:
Microsoft Teams meeting
Join: https://dod.teams.microsoft.us/meet/993580238205?p=NgWECEurH73BprxGc1
Meeting ID: 993 580 238 205
Passcode: kB2Fr9e2
Attachments/LinksContact InformationHistoryContracting Office Address- KO CONTRACTING DIVISION 220 W MAIN STREET 3RD FLOOR
- LOUISVILLE , KY 40202-2230
- USA
Primary Point of Contact- Chris Brackett
- Christopher.brackett@usace.army.mil
- Phone Number 5023156666
Secondary Point of Contact
- Sep 21, 2026 08:19 am MDTSpecial Notice (Updated)
- Sep 21, 2026 07:41 am MDT Special Notice (Updated)
- Sep 17, 2026 11:51 am MDT Special Notice (Original)
- Aug 21, 2026 11:06 pm MDT Sources Sought (Updated)
- Commodity Codes
-
- FSC YConstruction of Structures and Facilities
- NAICS 236220Commercial and Institutional Building Construction
- Related bids
-
Sep 17, 2026 [Special Notice (Original)] INDUSTRY DAY: Fort Carson Equipment Concentration Site - Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA) Oct 8, 2026 [Special Notice (Updated)] INDUSTRY DAY: Fort Carson Equipment Concentration Site - Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA) Oct 13, 2026 [Special Notice (Updated)] INDUSTRY DAY: Fort Carson Equipment Concentration Site - Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA)
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
West Side Improvements - Bus ...
Project ID: 26-035 (DT2401) Title: West Side Improvements - Bus Stops Package 1
City of pueblo
Bid Due: 10/21/2026
Project is in Region 4 in Wel...
Project Number Description Documents *STM066A-009 (26200) Project is in Region 4 in Weld
State Government of Colorado
Bid Due: 11/05/2026