Utility Water Meter Change-Outs
Project Information
- Bid Title
- Utility Water Meter Change-Outs
- Issuing Agency
- Hutto city
- Location
- Texas
- Published Date
- Nov 18, 2025
- Closing Date
- Dec 3, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFP# 2026-020-AB-01
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: RFP# 2026-020-AB-01
Bid Title: Utility Water Meter Change-Outs
Category: ALL BID OPPORTUNITIES Status: Open Additional Status Information: Meeting ID: 217 260 262 561 24 Passcode: x4pd7JT2 Bid Recipient: City of Hutto - Electronic Bids Only - Via Bonfire Description: The City of Hutto is soliciting a competitive sealed proposal from qualified contractors to provide all labor, materials, tools, equipment, and supervision necessary to perform water utility meter change-outs throughout the City. Maps and documents detailing the scope of work and locations can be found at the city’s bid page https://www.huttotx.gov/Bids.aspx .
Sealed bids will be received at https://huttotx.bonfirehub.com/projects until 3:30 PM on Wednesday, December 3, 2025. Followed by a live bid opening on MicrosoftTeams using the following: Meeting ID: 217 260 262 561 24 Passcode: x4pd7JT2
Publication Date/Time: 11/10/2025 12:00 AM Publication Information: https://huttotx.bonfirehub.com/projects/210218/details Closing Date/Time: 12/3/2025 3:30 PM Submittal Information: https://huttotx.bonfirehub.com/projects/210218/details Addendum Date/Time: 11/26/2025 Pre-bid Meeting: n/a Contact Person: Q & A via bonfire only. Download Available: https://huttotx.bonfirehub.com Plan & Spec Available: All required documents, plans, specs and additional details can be found on
https://huttotx.bonfirehub.com/projects/210218/detailsRelated Documents: - Attachment Preview
-
Request for ProposalSolicitation Response No.RFP# 2026-020-AB-01Utility Water Meter Change OutIssue Date: 11/10/2025Due date: 12/3/2025 at 3:30 pm CSTTable of ContentsArticle I. Executive Summary and Exhibits .................................................................................................. 41.1 Executive Summary ......................................................................................................................... 41.2 Exhibits ......................................................................................................................................... 4Article II. Administrative Information ........................................................................................................... 52.1 Schedule of Events....................................................................................................................... 52.2 Inquiries: ....................................................................................................................................... 52.2.1 Important Notes & Contact ...................................................................................................... 52.2.2 Prohibited Communications ................................................................................................ 62.3 Solicitation Response - General Requirements.......................................................................... 62.3.1 Solicitation Response Format and Deadlines ......................................................................... 62.3.2 Alterations, Modifications, Withdrawals ............................................................................. 6Article III. Evaluation and Award .................................................................................................................. 73.1 Selection Criteria .......................................................................................................................... 73.2 Scoring Methodology................................................................................................................... 73.3 Contract Award & Terms of Contract .......................................................................................... 73.4 New Vendor Packet...................................................................................................................... 83.5 Non-Appropriation....................................................................................................................... 8Article IV. Required Respondent Information.............................................................................................. 94.1 Solicitation Response Form ......................................................................................................... 94.2 Respondent Information.............................................................................................................. 94.2.1 Company Profile....................................................................................................................... 94.2.2 Qualifications & Experience............................................................................................... 104.2.3 Project Approach, Schedule & Timeline ................................................................................. 114.4 Litigation History ........................................................................................................................ 124.5 References.................................................................................................................................. 124.6 Deviation or Compliance............................................................................................................ 134.6.1 Deviation................................................................................................................................. 134.6.2 No Deviations ..................................................................................................................... 134.6.3 Safety Record & Compliance ............................................................................................. 144.7 Cooperative Purchasing......................................................................................................... 144.8 Conflict of Interest Questionnaire.............................................................................................. 154.9 Subcontractors ........................................................................................................................... 15Page 2 of 20Article V. Responses ................................................................................................................................... 16Article VI. Standard Terms and Special Conditions................................................................................... 166.1 Standard Terms and Special Conditions................................................................................... 166.1.1 Labor, Materials, and Time .................................................................................................... 166.1.2 OSHA Compliance .................................................................................................................. 166.1.4 Amendments, Rejections, and or withdrawals ................................................................. 166.1.5 Irregularities............................................................................................................................ 176.1.6 Evaluation, Offer Period and Contract Award ....................................................................... 176.1.7 Affirmations and Solicitation Acceptance ............................................................................. 186.1.8 Open Records ......................................................................................................................... 186.1.9 Contract Responsibility .......................................................................................................... 186.1.10 Public Disclosure ................................................................................................................ 186.1.11 Remedies................................................................................................................................ 186.2 Insurance .................................................................................................................................... 196.2.1 Required Coverages ............................................................................................................... 196.3 Disclosure of Interested Parties................................................................................................. 19Article VII. Submission Checklist ................................................................................................................ 20This document includes hyperlinks (in blue) for reference.Page 3 of 20Article I. Executive Summary and Exhibits1.1 Executive SummaryThe City of Hutto is soliciting a competitive sealed proposal is soliciting sealedproposals from qualified contractors to provide all labor, materials, tools, equipment,and supervision necessary to perform water utility meter change-outs throughout theCity.The selected contractor will be responsible for:•Removal of existing water meters (sizes 5/8” and 3/4”).• Installation of new water meters provided by the city.•Verification of proper meter operation and leak detection.•Recording of meter serial numbers, and GPS location.•Coordination with the City’s Utility Billing Department to ensure accuratecustomer account updates.• Providing all traffic control, safety procedures, and restoration of disturbedareas (e.g., landscaping, pavement, curbs).• Proper disposal of removed meters, in accordance with City direction.• Adherence to all applicable OSHA, TCEQ, and City safety standards.The City of Hutto will consider proposals from business entities that demonstrate theability to complete the Project within the guidelines of this solicitation, following allapplicable federal, state, and local rules, laws, and regulations and the terms andconditions contained in Exhibit B. Respondent must execute Exhibit A and completeother items listed on the Submission Checklist to be considered for award.1.2 ExhibitsExhibit A – General Affirmations and Solicitation AcceptanceExhibit B – Standard Purchasing Terms and ConditionsExhibit C – Addenda AcknowledgementPage 4 of 20Article II. Administrative Information2.1 Schedule of EventsThe dates provided represent a tentative schedule of events related to this solicitation.The City of Hutto reserves the right to modify these dates before the deadline forsubmission of Solicitation Responses upon notice being posted on the City website andits Vendor Connection website, Bonfire.Schedule of EventsEventDeadlineSolicitation Issuance11/10/2025Deadline for Question Submittal5:00 PM on 11/21/2025Anticipated Addenda Release, if applicable.Deadline for ResponsesEvaluations DueNotice of Intent to Award Date11/26/20253:30 PM on 12/3/202512/19/20251/8/20262.2 Inquiries:2.2.1 Important Notes & ContactAny questions and clarifications or requests for general information should besubmitted via the bid portal prior to the questions cutoff date of 11/21/2025.Solicitation documents may be examined or obtained electronically at the City’sBid postings website and its Vendor Connection website, Bonfire. All addendawill be posted on the City’s Bid postings website and its Vendor Connectionwebsite. It is the sole responsibility of the Respondent to check for Addenda.Respondents are expected to examine all documents that make up thissolicitation. Respondents shall promptly notify the City of any omission,ambiguity, inconsistency, or error they may discover upon reviewing thesolicitation. The City assumes no responsibility for errors or misrepresentationthat result from the use of incomplete submissions.Page 5 of 20
- Commodity Codes
-
- NAICS 221310Water Supply and Irrigation Systems
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CONNECTOR,60 POS.,MPH | 2099863
Project: CONNECTOR,60 POS.,MPH | 2099863 Ref. #: 2099863 Type: RFQ Status: Open Open
Dallas Area Rapid Transit
Bid Due: 7/06/2026
LOCAL LET MAINTENANCE CONTRAC...
LOCAL LET MAINTENANCE CONTRACT, PECOS CO, CLEANING AND SEALING CRACKS Solicitation ID: 6504-31-001_0726
State Government of Texas
Bid Due: 7/14/2026