Citywide Slurry Seal and Roadway Maintenance Program 2026
Project Information
- Bid Title
- Citywide Slurry Seal and Roadway Maintenance Program 2026
- Issuing Agency
- City of Santee
- Location
- California
- Published Date
- Apr 23, 2026
- Closing Date
- May 14, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- CIP 2026-02
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Citywide Slurry Seal and Roadway Maintenance Program 2026RFP Number:CIP 2026-02Start Date:2026-04-23 10:00 AMClose Date:2026-05-14 10:00 AM
Project Name: Citywide Slurry Seal and Roadway Maintenance Program 2026
Project Number: CIP 2026-02
Time for Completion: 50 working days
Engineer’s Estimate: $963,000.00
Bids Due: May 14, 2026 at 10:00 a.m.Any questions relating to this project should be directed to Toby M. Espinola at (619) 258-4100 x 174, or via email at tobyespinola@cityofsanteeca.gov
If you wish to be placed on the plan holder’s list, please contact Toby M. Espinola at (619) 258-4100 x 174, or via email at tobyespinola@cityofsanteeca.gov
Documents:
Plans/Specifications
Plan Holder’s List
Newspaper Advertisement
Notice Requesting Bids - Attachment Preview
-
CITYWIDE SLURRY SEAL AND ROADWAYMAINTENANCE PROGRAM 2026CIP 2026-02RFB Issued | April 2026Bid Opening | May 14, 2026 at 10:00 amEngineer’s Estimate: $963,000.00Time for Completion: 50 Working DaysCity of Santee10601 Magnolia Avenue • Santee, CA 92071(619) 258-4100www.CityofSanteeCA.gov(This page is intentionally left blank)iCitywide Slurry Seal and Roadway Maintenance Program 2026CIP 2026-02TABLE OF CONTENTSNOTICE INVITING SEALED BIDS ................................................................................. 4INSTRUCTIONS FOR BIDDERS.................................................................................... 8SPECIFICATIONS AND CONTRACT DOCUMENTS .................................................. 19SPECIAL PROVISIONS ............................................................................................... 20PART 1 GENERAL PROVISIONS................................................................................ 21SECTION 1 - GENERAL........................................................................................................211-2 TERMS AND DEFINITIONS .................................................................................21SECTION 2 - SCOPE OF THE WORK ..................................................................................232-2 PERMITS..............................................................................................................232-4 COOPERATION AND COLLATERAL WORK .......................................................232-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES .......................................232-9 CHANGED CONDITIONS ....................................................................................242-10 DISPUTED WORK ...............................................................................................24SECTION 3 – CONTROL OF THE WORK.............................................................................293-2 SELF PERFORMANCE ........................................................................................293-5 INSPECTION........................................................................................................293-6 THE CONTRACTOR’S REPRESENTATIVE ........................................................303-8 SUBMITTALS .......................................................................................................313-9 SUBSURFACE DATA...........................................................................................323-10 SURVEYING ........................................................................................................323-11 CONTRACT INFORMATION SIGNS ....................................................................333-12 WORK SITE MAINTENANCE ...............................................................................333-13 COMPLETION, ACCEPTANCE AND WARRANTY ..............................................413-14 TECHNICAL STUDIES AND DATA ......................................................................43SECTION 4 - CONTROL OF MATERIALS ............................................................................444-2 PROTECTION ......................................................................................................444-4 TESTING ..............................................................................................................444-9 CONSTRUCTION WORKMANSHIP AND TOLERANCES FOR WORK ...............464-10 PAYMENT ............................................................................................................47SECTION 5 – LEGAL RELATIONS AND RESPONSIBILTIES...............................................475-3 LABOR .................................................................................................................475-4 LIABILITY INSURANCE .......................................................................................515-7 SAFETY................................................................................................................565-8 LICENSING ..........................................................................................................575-10 NOTIFICATION AND COORDINATION................................................................58SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK.......................................596-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK ..........596-2 PROSECUTION OF THE WORK..........................................................................626-3 TIME OF COMPLETION.......................................................................................626-4 DELAYS AND EXTENSIONS OF TIME ................................................................636-5 USE OF IMPROVEMENTS DURING CONSTRUCTION ......................................646-9 LIQUIDATED DAMAGES .....................................................................................646-10 RIGHT TO AUDIT .................................................................................................65SECTION 7 – MEASUREMENT AND PAYMENT ..................................................................66iiCitywide Slurry Seal and Roadway Maintenance Program 2026CIP 2026-027-1 MEASUREMENT OF QUANTITIES FOR UNIT PRICE WORK ............................667-2 LUMP SUM WORK...............................................................................................667-3 PAYMENT ............................................................................................................667-4 PAYMENT FOR EXTRA WORK ...........................................................................747-6 WAIVER OF CLAIMS ...........................................................................................76PART 2 CONSTRUCTION MATERIALS ...................................................................... 77SECTION 203 - BITUMINOUS MATERIALS .........................................................................78SECTION 211 - MATERIAL TESTS.......................................................................................79SECTION 219 - SITE FURNISHINGS ...................................................................................80PART 3 CONSTRUCTION METHODS......................................................................... 81SECTION 301 - SUBGRADE PREPARATION, TREATED MATERIALS, AND PLACEMENTOF BASE MATERIALS ..........................................................................................................81SECTION 302 - ROADWAY SURFACING.............................................................................81SECTION 303 - CONCRETE AND MASONRY CONSTRUCTION ........................................90PART 4 EXISTING IMPROVEMENTS.......................................................................... 97SECTION 400 – PROTECTION AND RESTORATION..........................................................97SECTION 401 – REMOVAL...................................................................................................99SECTION 402 – UTILITIES .................................................................................................101PART 6 - TEMPORARY TRAFFIC CONTROL .......................................................... 104SECTION 600 - ACCESS ....................................................................................................104SECTION 601 – TEMPORARY TRAFFIC CONTROL FOR CONSTRUCTION ANDMAINTENANCE WORK ZONES .........................................................................................105CONTRACT EXHIBITS............................................................................................... 115BID SUBMITTAL PACKAGE ..................................................................................... 135PROPOSAL .........................................................................................................................137BID SCHEDULE ..................................................................................................................138SIGNATURE SHEET ...........................................................................................................139BID BOND ...........................................................................................................................141INFORMATION REQUIRED OF BIDDER............................................................................144DESIGNATION OF SUBCONTRACTORS...........................................................................146PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION................................148GUARANTEE ......................................................................................................................149NON-COLLUSION AFFIDAVIT / DECLARATION................................................................150CARB FLEET COMPLIANCE CERTIFICATION ..................................................................152IRAN CONTRACTING ACT CERTIFICATION .....................................................................153SAMPLE CONTRACT DOCUMENTS ........................................................................ 154AGREEMENT ......................................................................................................................155BID SCHEDULE ..................................................................................................................156PERFORMANCE BOND......................................................................................................162PAYMENT BOND (LABOR AND MATERIALS) ...................................................................166WORKERS' COMPENSATION INSURANCE DECLARATION ............................................169iiiCitywide Slurry Seal and Roadway Maintenance Program 2026CIP 2026-02CITY OF SANTEESTATE OF CALIFORNIANOTICE INVITING SEALED BIDSNOTICE IS HEREBY GIVEN, that the City of Santee, City, invites sealed bids for:CITYWIDE SLURRY SEAL AND ROADWAY MAINTENANCEPROGRAM 2026CIP 2026-02Sealed bids will be received at the Office of City Clerk, City of Santee, 10601 MagnoliaAvenue, Building 3, Santee, CA 92071 until 10:00 a.m. on Thursday, May 14, 2026 atwhich time they will be publicly opened and read aloud at said office. Any bidder whofails to submit its documentation by the above date and time shall have that Bid rejectedand returned unopened. Bids shall be valid for a period of 90 calendar days after the bidopening date.Work to be done includes the furnishing of all labor, materials and equipment necessaryfor the CITYWIDE SLURRY SEAL AND ROADWAY MAINTENANCE PROGRAM 2026including but not limited to crack sealing, asphalt patching, concrete, ARAM, slurry sealand all related and necessary work as defined in the contract documents (the “Project”).Contract Documents, including Plans, Specifications and Proposal Forms, may beexamined and/or downloaded on the City’s website at www.cityofsanteeca.gov.Contract Documents may also be examined at the City Clerk’s Office, 10601 MagnoliaAvenue, Building 3, Santee, CA 92071-1266. All bidders shall notify the City of Santeeto be added to the bidder’s list if plans and specifications are downloaded from the City’swebsite in order to receive any addendums to the contract documents.Each bid must conform and be responsive to the Contract Documents and all plans,specifications and proposal forms described above.Each bid must be submitted in a sealed envelope bearing on the outside the name ofbidder, the bidder’s address, the name of the project for which the bid is submitted andthe appropriate State Contractor's License designation held by the bidder. If forwardedby mail, the sealed envelope containing the bid must be enclosed in another envelopeaddressed to the City Clerk, City of Santee, 10601 Magnolia Avenue, Building 3, Santee,CA 92071-1266.Bid Guarantee / Bid Bond:Each bidder must submit a bid to the City Clerk on standard forms available in the Officeof the Director of Engineering. Said bid is to be accompanied by a certified or cashier'scheck, cash deposit, or a bidder's bond made payable to the City of Santee, in an amountnot less than 10 percent (10%) of the total bid submitted. The bid security shall be4Citywide Slurry Seal and Roadway Maintenance Program 2026CIP 2026-02
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238990All Other Specialty Trade Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
UW18030 MORMON SLOUGH SANITAR...
General Information Due Date: Thursday, July 9, 2026 Opening Time: 2:00 PM Published
City of Stockton
Bid Due: 7/09/2026
Specification No. 26-03, C516...
Specification No. 26-03, C51692, Spillway Maintenance, Pyramid DamDetails Event ID 0000039684 Format/Type: Sell
State Government of California
Bid Due: 7/22/2026