300284-RFQ-1SUPP Gampel Pavilion Renovation
Project Information
- Bid Title
- 300284-RFQ-1SUPP Gampel Pavilion Renovation
- Issuing Agency
- University of Connecticut
- Location
- Connecticut
- Published Date
- Nov 20, 2025
- Closing Date
- Dec 10, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 300284-RFQ-1SUPP
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
300284-RFQ-1SUPP Gampel Pavilion Renovation
Number 300284-RFQ-1SUPP Open 11/08/2025 Close 12/10/2025 2:00 PM EDT Type RFQ - Request For Qualifications Pre-Bid
Non-Mandatory 11/25/2025 10:00 AM EDT
Virtual Meeting through Microsoft Teams) See attached document for link.
RFI
12/03/2025 2:00 PM Contact Cesar Alonzo cesar.alonzo@uconn.edu (860) 486-0012 Details The purpose of this Supplemental Request for Qualifications (RFQ) is to solicit experienced and qualified trade contracting companies to pre-qualify to bid the Gampel Pavilion Renovations project on UConn’s Storrs campus, for phase 1 of the project. DPR Construction (DPR) is the awarded Construction Manager for the Gampel Pavilion Renovations project. The University of Connecticut is undertaking a focused renovation to Gampel Pavilion on the Storrs campus. Gampel Pavilion is an approximately 171,000 square feet, 10,299- seat multipurpose dome and is the largest on-campus venue for college basketball in the New England area. The goal of this project’s renovation is to modernize and create maximum efficiencies of the existing spaces in Gampel Pavilion while also further increasing new revenue generating areas and opportunities that support the facility’s use. Submit a Statement of Qualifications through Building Connected: https://app.buildingconnected.com/public/6759b2e4858f64006774ac17 Documents Gampel-RFQ-Supp-Phase-1-Final .pdf (Instructions For Prequalifying Contractors) - Attachment Preview
-
GAMPEL PAVILION RENOVATIONPROJECT #: 3002842098 HILLSIDE ROADSTORRS, CT 06268INSTRUCTIONS FOR PREQUALIFYING CONTRACTORSREQUEST FOR STATEMENT OF QUALIFICATIONS - SUPPLEMENTALUCONN GAMPEL PAVILION RENOVATIONS – PHASE 1Date: November 19, 20251.Intent of this SolicitationThe purpose of this Request for Qualifications (RFQ) is to solicit experienced and qualified trade contractingcompanies to pre-qualify to bid the Gampel Pavilion Renovations project on UConn’s Storrs campus, for phase1 of the project. Critical Dates:Pre-Proposal Conference Date and TimeNovember 25, 202510:00amPre-Proposal Conference LocationVirtual (Link here to Teams meeting)RFI Due Date and TimeDecember 3, 20252:00pmRFQ Proposal Due Date and TimeDecember 10, 20252:00pmo Contractors that do not pre-qualify through this RFQ process will not be able to bid, provide servicesor permitted to perform work on site, as applicable to packages requiring prequalification.o If Proposer is submitting for multiple packages, a separate and complete submission is required foreach package. Proposers submission should indicate which package you are submitting for. Pre-Proposal Conference: The pre-proposal conference will be virtual and accessible through the Teamsmeeting link provided above. Request for Information: All RFI questions are to be submitted on the form provided and posted toBuilding Connected at link provided below. No phone calls or RFI questions emailed directly to DPR willbe accepted. No RFI questions will be accepted after due date and time stated above. Addenda Process: All interpretations of the RFI responses, contract documents and supplementalinstructions will be in the form of a clarification/addendum. Addenda will be posted on Building Connected Location of Solicitation: Prequalification documents are available for download through BuildingConnected: Building Connected Consideration of Proposal: The Proposer will be required to demonstrate, to the satisfaction of DPRConstruction and the University of Connecticut, that they possess the financial ability, managerial ability,technical ability, and the integrity, necessary to perform the Scope of Work faithfully and e iciently for thisProject, without conflict of interest and within the scheduled durations outlined in Section 2. Proposalsshall be evaluated as outlined within this RFQ, as well as any additional information obtained from personsor other sources identified in the Proposal with the intent of developing a list of prequalified biddingcontractors.o A Proposal with incomplete responses, inaccurate information, or missing documents will be deemeda non-responsive Proposal and the Proposal will not be accepted. Complete and provide informationand supplemental documents for Al RFQ Form worksheets: DAS Construction Contractor Prequalification Program Certificate Project Relevant Experience Project Team Qualifications Integrity Questionnaire Financial Ability Prequalification Requirementso Submit a Statement of Qualifications utilizing the Forms provided. No substitution of the Form ispermitted.o Any Proposal omitting or adding items, altering the Forms, or containing conditional or alternativelanguage/pricing (if applicable), may be deemed a non-responsive Proposal and the Proposal may berejected.o All Proposals must be submitted no later than the closing date and time for this event. No submissionsmay be accepted that are submitted after the due date and time.o The Construction Manager and the University reserve the right to waive any informalities, irregularities,or technical defects in the Proposals, if it is deemed to be in the best interest of the University, providedthe reasons for any such waiver are stated in writing to DPR Construction and the University and madea part of the contract file.2.Project Schedule and Duration – Phase 1 Targeted Start of Construction/Mobilization on Site Phase 1 CompletionMarch 2026October 2026 Note that phasing completion is based upon the start and end to each of the men’s and women’sbasketball season and is non-negotiable. In order to achieve these dates, multiple crews will need tobe available for work occurring in multiple levels and locations.3.Overall Project Summary and OverviewDPR Construction (DPR) is the awarded Construction Manager for the Gampel Pavilion Renovations project.The University of Connecticut (UConn) is undertaking a focused renovation to Gampel Pavilion on the Storrscampus. Gampel Pavilion is an approximately 171,000 square feet, 10,299- seat multipurpose dome that wasoriginally constructed beginning in 1988 and opened in January 1990. Gampel Pavilion consists of four floorlevels that include the court/floor level (Activity Level), entrance / street level (Concourse Level), mechanicallevel (Fan Room Level) and upper concourse (Upper Level). Gampel Pavilion is the largest on-campus venuefor college basketball in the New England area. The goal of this project’s renovation is to modernize and createmaximum e iciencies of the existing spaces in Gampel Pavilion while also further increasing new revenuegenerating areas and opportunities that support the facility’s use. The renovation scope for the project couldinclude, but are not limited to: New Student Athlete Training Table Grab & Go food service options New concessions and options New Premium Club spaces Loge Box and press seating options Locker room enhancements Building canopy enclosures Technology and FFE enhancements Dome condensation and roof leak Revenue generation opportunities4. Project Scope: Phase 1 (Kinesiology, Team Locker Rooms/Coaches Suite, New Elevator/ Stair, Grab n Go’s)The project scope will include but is not limited to selective demolition (interior and exterior), structural demolition,shoring, sca olding, concrete foundations, slab on grade, slab trenching, concrete pits and bases, structural steel& miscellaneous metals, GWB and CMU partitions, curtainwall assemblies, equipment screens, D/F/H, interiorwindows, ACT, interior specialties, tile, vinyl wall covering, paint, epoxy flooring, vinyl floor tile, resinous flooring,resilient base, acoustical ceiling finishes, elevators, M/E/P-FP systems, telecommunications, sound and AVsystems, access control and surveillance systems, integrated automation, laboratory fume hoods, sterilizationequipment, laboratory casework, interior architectural woodwork and casework.5. Bid Packages, Estimated Values and DAS Contractor Prequalification Requirements: The table belowidentifies the anticipated bid packages, estimated values, set-aside packages for Small Business Enterprise (SBE),Minority Business Enterprise (MBE), Women-Owned Business Enterprise (WBE) and Disabled Veterans (DisVE), CTDAS (Connecticut Department of Administration Services prequalification required packages and ContractorClassification requirements. Reference Section 9 below for CT DAS Construction Contractor Prequalificationprogram requirements and Set-Aside or 30/10 requirements for this project.BidPackageNo.021730313232A32CUConn – Gampel Pavilion Renovations Bid PackagesBid Package NameEstimatedValueDASRequired(Yes/No)CT DASClassificationDemolition and Abatement$1,500,000YesDemolitionDrywall and Framing$1,000,000YesCarpentry/Millwork/Drywall/AcousticalPlumbing$2,675,000YesPlumbingHVAC$1,440,000YesHVACElectricalAccess Controls and SecurityAV & Data Communications Systems$5,580,000$1,000,000$2,452,000YesElectricalYesElectrical or AlarmSystemsYesElectrical orTelecommunicationsSet-Aside or30/1030/1030/1030/1030/1030/1030/1030/106. Proposed Team Qualifications: On the form included with this RFQ, the Proposers must demonstrate the abilityto sta the Project with high quality, experienced personnel. Describe the qualifications and responsibilities of thekey personnel who will be assigned to the Project including their experience on similar assignments and theirspecific responsibilities for the proposed Project.o It is recommended that the Proposer provide the following positions: Project Superintendent/lead foreman,Project Manager, and Project Safety O icer. Only provide resumes for the key project team; do not includeresumes for personnel not assigned to the team.7. Previous Relevant Experience: On the form included with this RFQ, the Proposers must meet the followingrequirements and describe their overall qualifications, including background in this field and the services that itprovides.a. It is recommended that the Proposer provide a minimum of three (3) examples of projects that are inprogress or completed within the past ten (10) years, comparable in size, scope, and similar environmentto this Project, with an emphasis on occupied collegiate and/or professional multi-use sports arenas andin the following but not limited to and as applicable: Safety: Emphasis on company’s safety record and will be evaluated based on project requirements. Structural Demolition: Emphasis on engineered shoring systems and coordination with criticalcomponents of structural walls Concrete: Emphasis on the critical nature of placing concrete with limited access to areas requiringwork, logistics and knowledge and experience in planning to complete work in an occupied buildingsetting Structural Steel and Misc. Metals: Emphasis on the critical nature of erecting steel in limited accessto areas requiring work, logistics and knowledge and experience in planning to complete work in anoccupied building setting MEP/FP: Emphasis on critical nature of submitting and procuring material and equipment toaccomplish scheduled dates including how this will be accomplished. This includes coordination ofwork with other trade work in place, planning and coordination with 3rd party vendors and planningcapabilities to meet the schedule requirements.b. It is recommended to provide project examples that have a construction value that is equal to or greaterthan the estimated values in the Bid Package table in Section 5 above.c. A detailed description of the work performed and how it relates to the Scope of Work outlined in the RFQshall be included.d. Projects with any information on the Form stated as “confidential” may not be considered.8. Financial Ability: The Proposer must demonstrate the financial ability and bonding capacity to complete aconstruction project with a minimum value of at least equal to the estimated value indicated in the table in Section5 above. See the Financial Ability Prequalification Requirements Document for further information.9. DAS Contractor Pre-Qualification Requirements: The pre-qualification program for this project will requiresubmitting additional documentation including but not limited to CT DAS Construction Contractor Certificates asapplies to this project and estimated package values, CT DAS Supplier Diversity Certificates (set-aside bidpackages identified in Section 5 above), resume for your company safety manager if applicable, and projectreferences. For bid packages with an estimated cost more than $1,000,000: The Proposer must be prequalifiedpursuant to C.G.S. Section 4a-100 (CT DAS Construction Contractor Prequalification Program) Applicantshall provide their CT DAS Construction Contractor Certification and Classification. DAS ContractorClassifications can be found at the following website: https://portal.ct.gov/das/procurement/prequal/das-contractor-classi%EF%AC%81cation-list SBE/MBE PARTICIPATION: DPR Construction and the University of Connecticut are committed to providinga professionally inclusive environment within which small and minority businesses. As such, weencourage participation by Small (SBE) businesses, Minority-Owned (MBE) businesses, Woman-Owned(WBE) businesses, and businesses owned by persons with a disability (DisBE), certified as such by theConnecticut’s Department of Administrative Services Supplier Diversity Division.o For further information, visit: https://portal.ct.gov/DAS/Services/Licensing-Certification-Permitting-and-Codes/Small-Minority-Business-Centero To learn about the University of Connecticut’s Supplier Diversity Program, visit:https://supplierdiversity.ubs.uconn.eduo Proposers that intend to prequalify for a set-aside designated bid package on this project must providetheir Connecticut Department of Administrative Services certification in the Supplier Diversityprogram as required by this solicitationa. 30/10 Requirements: Proposers are advised to award 30% and 10% of the total estimated value of theirdesignated bid package(s) to SBE/MBE sub-tier Contractor(s) as designated in the Bid Packages listed inSection 5 above:o Thirty percent (30%) to Connecticut certified SBE’s (Small Business Enterprises)o Ten percent (10%) to Connecticut certified MBE’s (Minority Business Enterprise) which includes WBE’s (Women-owned Business Enterprises) DisBE’s (Disability Owned Business Enterprises)o Ten percent (10%) is allowable to be included in the 30% SBE requiremento The Proposer is responsible for ensuring that the SBE/MBE they have selected, are State ofConnecticut SBE/MBE certified.o If the Contractor is an S/MBE, then any self-performed work may be included in the 30/10 requirement.b. Set-Aside Requirements: Proposers are a certified SBE/MBE Contractor that meet the SBE/MBEpercentage as outlined in item a. above:o Contractor is an SBE/MBE, self-performing work meeting the estimated total value of the designatedBid Package(s) Reference Section 5 above for Bid Packages designated as “Set-Aside”o CT DAS Supplier Diversity Certificates are required for set-aside bid packages and must be active asof the due date of the RFQ.10. CT Commission on Human Rights & Opportunities RequirementsThe project will be subject to the contract compliance laws and requirements of the Connecticut Commission onHuman Rights and Opportunities (CHRO). Information regarding the CT CHRO can be found online at:https://portal.ct.gov/chro/contract-compliance/contract-compliance/contract-compliance-forms-and-reports.Monthly utilization and status reports will be required during the course of construction as outlined in theConnecticut General Statutes and can be found in the above referenced website.END OF INSTRUCTIONS TO PREQUALIFYING CONTRACTORS
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Jun 24, 2026 July 8, 2026 RFQ - Land Use Attorney Planning &
Town of Litchfield
Bid Due: 7/08/2026