RFP for Primary Sludge Piping System Replacement and Installation
Project Information
- Bid Title
- RFP for Primary Sludge Piping System Replacement and Installation
- Issuing Agency
- City of St. Cloud
- Location
- Minnesota
- Published Date
- Feb 14, 2026
- Closing Date
- Feb 27, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: RFP for Primary Sludge Piping System Replacement and Installation
Category: Requests for Proposals/Qualifications Status: Open Description: Request for Proposals for PRIMARY SLUDGE PIPING SYSTEM REPLACEMENT AND INSTALLATION
Proposal
The City of St. Cloud, Minnesota is soliciting Request for Proposals from qualified vendors for valve and piping component replacement for an existing Primary Sludge Conveyance System.
Submission RequirementsSite visits and/or questions shall be directed to Jacob Ethen , Wastewater Services Manager, by Friday, February 20, 2026.
Proposals will be accepted until Friday, February 27, 2026, at 4:00 PM(CST) and are to be submitted in PDF format via email to: Jacob Ethen , Wastewater Services Manager, Subject Line to Read: RFP-Primary Sludge Piping System Replacement and Installation.
Publication Date/Time: 2/13/2026 3:00 PM Closing Date/Time: 2/27/2026 4:00 PM Related Documents: - Attachment Preview
-
PUBLIC UTILITIES DEPARTMENTRequest for ProposalsPrimary Sludge Piping SystemReplacement and InstallationProposalThe City of St. Cloud, Minnesota is soliciting proposals from qualified vendors for valve andpiping component replacement for an existing Primary Sludge Conveyance System.Background InformationThe existing Primary Sludge Conveyance piping system was installed at the St. CloudNutrient, Energy and Water (NEW) Recovery Facility in 1973. This system was modified in2008 to its current configuration. This piping is necessary to convey solids from the primaryclarifiers to solids processing at the Gravity Belt Tables, (GBTs).Location: 525 60 Street South, St. Cloud, MN 56301Existing system details: 4” and 6” ductile iron piping, fitting and Dezurik quarter turn plugvalves with pneumatic cylinder actuators.Material Specifications and Scope of Services• 4” and 6” flanged ductile iron pipe, spool pieces, and fittings, cement lined• Six (6) 6” plug valves with Rotork K-Tork rotary vane pneumatic actuator• Four (4) 4” plug valves with Rotork K-Tork rotary vane pneumatic actuator• Four (4) 6” isolation valves operated manually with a lever or handle• All valves shall be 1/4 turn full port with included grease fittings• All fasteners, anchors, and supports shall be 304 or higher grade stainless steel• Globally sourced materials• Removal and installation of piping system to be coordinated daily with facility staff tomaintain primary clarifier and GBT operations. Scheduled outages can becoordinated with facility personnel; 24 hours’ notice is required, and any one outageshall not exceed 8 consecutive hours• Disconnect and reconnect all electrical and process air terminations• Paint new piping, spool pieces, valves, and fittings with epoxy paint to match existingPage 1 of 2Resources AvailableSite visit for measurements; see contact details in Additional Information below toschedule site visit.Submission RequirementsProposals will be accepted by 4:00 PM(CST) on Friday, February 20, 2026, and are to besubmitted in PDF format via email to:Jacob.Ethen@ci.stcloud.mn.usSubject Line to Read: RFP Primary Sludge Piping System Replacement and InstallationVendor Selection ProcessThe proposals will be evaluated based on qualifications and experience of thevendor/supplier, the anticipated cost of services, and other appropriate factors (seebelow).Selection criteria shall include, but shall not be limited to, the following factors:1. Related professional experience, specific project responsibility and availability ofkey personnel assigned to the project.2. Vendor/supplier recent experience in the provision of comparable wastewaterpiping systems and design services including references.3. Current lead-times4. Anticipated cost.As the contracting authority, the City of St. Cloud shall make the final decision concerningvendor selection. The City reserves the right to negotiate professional services from theselected consultant(s)/ contractor(s) as deemed necessary to fulfill the complete projectintent. The City reserves the right to terminate the contract and delete all remaining worktasks at its discretion.ScheduleRequest For Proposals AdvertisedQuestions/site visits acceptedProposals DueTentative Selection AnnouncedFinalize Work Plan, Fees and ContractFebruary 13, 2026February 20, 2026February 27, 2026, 4:00 PM(CST)March 13, 2026March 27, 2026Additional InformationSite visit requests and/or questions should be submitted to the Wastewater ServicesManager by date listed above. Questions shall be submitted in writing via email.Mr. Jacob Ethen, Wastewater Services ManagerJacob.Ethen@ci.stcloud.mn.us(320) 255-7226Page 2 of 2
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Project # 618-26-701 - EHRM -...
Follow Project # 618-26-701 - EHRM - Infrastructure Upgrades - Main Computer Room
Federal Agency
Bid Due: 7/15/2026
Z2DA--618-CSI-240, SPS Equipm...
Follow Z2DA--618-CSI-240, SPS Equipment Site Prep 36C263-26-AP-1525 - FY26 NRM OS Active Contract
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 8/03/2026