Demolition for 104 Indian Center Ct
Project Information
- Bid Title
- Demolition for 104 Indian Center Ct
- Issuing Agency
- City of Kingsport
- Location
- Tennessee
- Published Date
- Mar 26, 2026
- Closing Date
- Mar 31, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Category* Solicitation Name Addenda Engineer/Architect Contact Pre-bid Meeting Bid Opening Date & Time / Reply Date Demolition for 104 Indian Center Ct Engineering Department - 423-229-9475 03/16/2026 @ 10:00 AM ET Mar 31,2026 04:00 PM ET SUBMIT BID - Attachment Preview
-
PROJECT: FORMER PRIME SIRLOIN STEAKHOUSE DEMOLTIONProject Description:Work to be bid upon as follows: Demolition of building at 104 Indian Center Court,Kingsport, TN. Work included but not limited to, total demolition of structure, down to slab ongrad, barricades, fencing, erosion control, and other associated work. The allotted time forconstruction will be 90 calendar days.ENGINEERING DIVISIONCity of Kingsport, TennesseeMemoTo:From:Date:Interested ContractorsCity of Kingsport Engineering DivisionMarch 2, 2026RE:Request for Quotes Concerning Demolition of former Prime Sirloin BuildingPlease provide a price for the below and attached described work for the demolition of formerPrime Sirloin Restaurant building at 104 Indian Center Court Kingsport, TN. Work includesdemolition of building down to slab on grade to remain. Existing asphalt paving to remain.1. Pre-Bid Meeting on site Monday March 16th at 10:00 a.m.2. Contractor must obtain a Demolition Permit from the City of Kingsport Building Department.3. Notification of Demolition and/or Asbestos Renovation must be submitted to TDEC on CN-1055Notification Form, 10 working days prior to demolition as per State regulations.4. City of Kingsport Building Department will not issue demolition permit until permit with State hasbeen filed.5. Tennessee One call www.tenn811.com by calling TN811 must be done at least 3 working days priorto any excavating work if warranted on project.6. The existing AEP transformer is connected to other adjacent properties and is to remain. Thetransformer must be protected during demolition operations.7. AEP representative Tom Hensley must be notified ten days prior to building demolition. Contactinformation for Tom Hensley is office # 423-578-2240 and email address tdhensley@aep.com8. A Pre-Demolition Hazardous Material Assessment Report has been completed and prepared byMattern & Craig dated October 31, 2025, and have been made a part of the bid documents.________________________________________________________________________________________________Engineering Division130 Shelby StreetKingsport, TN 37660Kingsport – The Best Place to Be(423) 229-9475Page 19. Proper notice must be filed with Tennessee Department of Environment & Conservation Division ofAir Pollution Control, Asbestos NESHAP Program.10. Demolition Contractor must be properly licensed and insured by the State of Tennessee andcomply with all applicable Federal, State and local regulations.11. Property must be demolished in a manner that is safe to the adjoining and surrounding businessesand residences.12. Contractor shall be responsible for maintaining a safe working environment for workers andcitizens.13. Be considerate of the adjacent property owners’ yards, landscaping, etc. Take pre-constructionvideos and pictures.14. Contractor to demolish building structure down to existing slab on grade. Slab on grade, asphaltparking and parking lot lights to remain.15. There shall be no fires of any kind or burning of any debris.16. All materials trash, garbage, refuse, brush, debris and building materials must be removed anddisposed of at an approved landfill appropriate for the type of material being disposed of.17. Contractor must keep the surface of the sidewalks and streets affected by their work in a clean andsafe condition.18. Contractor does not need to remove trees larger than 3” in diameter, if applicable.19. The grade must be restored to adjacent established grades, unless noted otherwise per plans forslabs to remain. All grass, weeds and overgrowth will be cut to within 3” of the ground. Alldisturbed property to be seeded and strawed as per City of Kingsport Specs.20. Contractor shall be responsible for all traffic control per City of Kingsport specs, Erosion andSediment Control measures as per TDEC (Tennessee Department of Environment & Conservation)Erosion Prevention & Sediment Control (EPSC) Handbook, latest edition.21. Utilities must be terminated and property capped at the property line.22. A final demolition inspection is required with the City of Kingsport Building Department. CallBuilding Department at 423-224-2717 to make appointments.23. Pay application request to be submitted on AIA Document G702 and Continuation Form G703latest version or digital version printed with three (3) original signed copies. If contractor does not________________________________________________________________________________________________Engineering Division130 Shelby StreetKingsport, TN 37660Kingsport – The Best Place to Be(423) 229-9475Page 2have a subscription to AIA documents, then payment may be submitted with similar formatconsistent with AIA.24. Each Pay request must include three (3) original signed copies of Certificate of the Contractor (seeattachment).25. Final Pay application must include Certificate of the Contractor Form, original signed & notarizedWaiver of Lien (see attachment), and Consent of Surety (if applicable if Bid Bond is required).Attachments: Certificate of Contractor, Waiver of Lien, Google Earth ImageryEnd of Memo________________________________________________________________________________________________Engineering Division130 Shelby StreetKingsport, TN 37660Kingsport – The Best Place to Be(423) 229-9475Page 3Bid ProposalBoard of Mayor and Aldermenc/o Purchasing AgentCity of KingsportKingsport, TennesseeGentlemen:The undersigned propose to perform demolition of the former Prime Sirloin Steakhouse at 104 Indian Center Court in Kingsport, TNand all work pertinent thereto, including any and all work and materials that may be necessary to perform work in a proper andworkmanlike manner, and according to the plans and profiles on file in the Office of the City Engineer, and upon the terms and conditionsof the "Legal Notice" heretofore published by the City of Kingsport, the plans, specifications and special provisions secured from the CityEngineer of the City of Kingsport and the ordinances of the City and the direction of, and to the satisfaction of, the City Engineer, at thefollowing rates to wit:ITEM NO. QUAN UNITDESCRIPTIONUNIT COSTTOTAL COST11.00 LS Demolition of former Prime Sirloin Steakhouse BuildingPROJECT TOTAL:(Revised 09/12/13)
- Commodity Codes
-
- NAICS 238910Site Preparation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
830 & 838 W. Industry Drive D...
Category* Solicitation Name Addenda Engineer/Architect Contact Pre-bid Meeting Bid Opening Date & Time
City of Kingsport
Bid Due: 7/22/2026
Lynn View Community Center De...
Category* Solicitation Name Addenda Engineer/Architect Contact Pre-bid Meeting Bid Opening Date & Time
City of Kingsport
Bid Due: 7/29/2026