Traffic Signal Design
Project Information
- Bid Title
- Traffic Signal Design
- Issuing Agency
- City of Cleveland
- Location
- Tennessee
- Published Date
- Jan 21, 2026
- Closing Date
- Feb 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Traffic Signal Design
Category: Purchasing Status: Open Description: REQUEST FOR QUALIFICATIONS (RFQ)
Professional Engineering Services – Traffic Signal Design (Seven Intersections)
City of Cleveland, Tennessee
Issue Date: January 22, 2026
Statements of Qualifications Due: On or before February 9, 2026, at 4:00 PM, ET
Delivery Location: Email to Kristi Powers at
For security reasons, you must enable JavaScript to view this E-mail address.
1. InvitationThe City of Cleveland, Tennessee ("City") is requesting Statements of Qualifications (SOQs) from qualified professional engineering firms to provide traffic signal design services for seven (7) intersections within the City. The City intends to procure these services using a qualifications-based selection approach and will negotiate scope and compensation with the highest-ranked firm in accordance with applicable City procurement policies and any applicable state or federal requirements.
Important: This is an RFQ. Fee proposals are not requested at this stage.
2. Project Overview and IntersectionsThe City anticipates design services for the following intersections (dates indicate current planning targets and may be adjusted):
#
Intersection
Existing Control
Target Construction Window
1
Stuart Rd @ Hardwick Farms Pkwy
Un-signalized
Q1 2027
2
North Lee Hwy (TN State Route 2) @
Sequoia RdUn-signalized
Q3 2027
3
Paul Huff Parkway @ Frontage Rd /
Adkisson DrSignalized
Q1 2028
4
25th St (TN State Route 60) @
Westside Dr / Georgetown RdSignalized
Q1 2028
5
25th St (TN State Route 60) @ Peerless Rd
Signalized
(wood poles
with anchors)Q3 2028
6
North Lee Hwy (TN State Route 2) @
Stuart CrossingUn-signalized
Q2 2029
7
Pleasant Grove Rd @ Harris Creek Pkwy
Un-signalized
TBD (Q1 2027 - Q1 2029)
All intersections shall be designed with new powder-coated black mast arms.
TDOT Standards: Use TDOT standard traffic specifications and drawings (T-SG series) for traffic signal components and related work where not specified by TDOT Special Provision 730CLEV.
All furnishing, materials, equipment, and installation necessary to complete traffic signal installation (including incidentals required for a complete and operational system) shall adhere to TDOT Special Provision 730CLEV (SP730CLEV), Section 730 – Traffic Signals.
3. Anticipated Scope of Services3.1 Project Management and Coordination- Kickoff meeting; field reviews; coordination with City staff and, as needed, TDOT and utilities.
- Identify design criteria, constraints, right-of-way considerations, utility conflicts, and constructability concerns.
- Maintain a project schedule aligned with the City’s anticipated letting and construction windows.
- Apply QA/QC procedures to all deliverables.
3.2.1 Scope Clarifications - Turn Lanes, Drainage, and Channelized Right-Turn IslandsFor clarity, the City intends the following scope inclusions/exclusions to apply to all intersections:
- Turn lane design and associated roadway/drainage design (e.g., geometric widening, taper/auxiliary-lane extensions, curb-and-gutter/edge-of-pavement shifts, storm drainage modifications) are not included in the anticipated scope unless specifically authorized by the City via a negotiated amendment or task authorization.
- If raised concrete channelized right-turn islands are deemed required within the existing intersection footprint, the island design (including geometry, curb details, signing/striping impacts, and related notes/details) shall be included in the design package.
- If raised concrete channelized right-turn islands are deemed required and the corresponding existing footprint requires alteration to accommodate the island, that alteration within the intersection footprint and the island design shall be included in the design package. Drainage design beyond incidental surface adjustments within the immediate island/footprint alteration remains excluded unless specifically authorized by the City.
- Prepare traffic signal plans, including field verification as needed to support design.
- Mast arm signal design: Provide new powder-coated black mast arm layouts (foundation, pole locations, arm lengths, clearances, and related details).
- Incorporate TDOT T-SG standard drawings and specifications for components and installation requirements.
- Traffic signal design shall include all required phasing drawings and associated plan sheets.
- SP730CLEV Compliance: Prepare plans and bid documents that incorporate and reference TDOT Special Provision 730CLEV (SP730CLEV) as the governing special provision for furnishing and installing all necessary materials and equipment for complete in-place traffic signal systems, including required incidentals.
- Include all necessary traffic control as a required design deliverable appropriate to each intersection and construction staging needs.
- Provide Traffic Control Plans (TCPs) / MOT plans and narrative suitable for inclusion in bid documents, consistent with TDOT standards and practices.
- Address lane closures, temporary signing and pavement markings, and sequencing considerations.
- Provide soil boring data and geotechnical deliverables necessary for mast arm foundations and related structures.
- Include boring locations at proposed pole/foundation sites as appropriate and a geotechnical report suitable for design and construction.
- If geotechnical services are subcontracted, identify the subconsultant and qualifications within the SOQ.
Design each intersection to be ready for future pedestrian equipment, including (at minimum) accommodations in plans and details such as:
- Conduit/cable routing provisions and pull box locations as appropriate.
- Space and mounting considerations for future pedestrian indications and pushbuttons (including ADA/PROWAG considerations as applicable).
- Placeholder notes/details indicating future pedestrian equipment integration requirements.
- Provide pavement marking plans for each intersection, including stop bars, lane lines, arrows, and channelization markings.
- Include all required pedestrian markings (e.g., crosswalks and related markings) where applicable to the intersection’s design and future readiness.
- Ensure plans are consistent with TDOT standards and MUTCD requirements.
For the two intersections with existing signals:
- 25th St (TN State Route 60) @ Westside Dr / Georgetown Rd
- 25th St (TN State Route 60) @ Peerless Rd
Provide project phasing/staging to coordinate:
- Transition from existing wood poles/anchors to new mast arms.
- Existing equipment removal/abandonment requirements.
- Temporary operations required to maintain signal control during construction (as applicable).
- Coordination notes for contractor sequencing and any temporary traffic control needs.
The City is intentionally leaving the following component specifications as placeholders within this RFQ. The selected consultant shall develop project-specific recommendations during design consistent with Cleveland proprietary product list on file with TDOT (dated 9/22/2025), TDOT T-SG standards, City preferences, and/or SP730CLEV.
Include placeholders within plans and/or special provisions for items such as:
- Signal cabinet and internal components: [PLACEHOLDER – CABINET MAKE/MODEL, CONTROLLER, MMU, COMMUNICATIONS, DETECTION INTERFACES, ETC.]
- Signal conductors, conduit, and related materials: [PLACEHOLDER – CONDUCTOR TYPE/COUNT, CONDUIT SIZES, ROUTING ASSUMPTIONS]
- Signal heads and indications: [PLACEHOLDER – HEAD CONFIGURATIONS, BACKPLATES, VISIBILITY LIMITS]
- Battery backup / UPS: [PLACEHOLDER – TYPE, RUN-TIME, INTEGRATION REQUIREMENTS]
- Signs (advance warning, street name signs, regulatory/warning): [PLACEHOLDER – SIGN SCHEDULE ASSUMPTIONS]
- Detection (video/radar/loops) as applicable: [PLACEHOLDER – DETECTION STRATEGY BY APPROACH]
- Lighting/illumination (if applicable): [PLACEHOLDER – INTERSECTION LIGHTING ASSUMPTIONS]
- Communications / interconnect (if applicable): [PLACEHOLDER – FIBER/WIRELESS/ETHERNET ASSUMPTIONS]
Final deliverables are expected to be suitable for bidding and construction and may include, as applicable:
- Plan set(s) for each intersection (or packaged sets as directed by the City), including signal layout, foundations, conduit/cable, phasing drawings, signing, pavement markings, traffic control/MOT, and (where applicable) removal/demolition plans.
- Engineer’s opinion of probable construction cost (OPCC) and quantity summaries.
- Technical specifications/special provisions consistent with TDOT T-SG series (and City requirements).
- Special Provisions: Include TDOT Special Provision 730CLEV (SP730CLEV) in the bid documents/specifications package and ensure plan notes and pay item scope are consistent with SP730CLEV requirements for complete, operational signal systems (including incidentals).
- Geotechnical report and boring logs/data.
- Submission packages suitable for TDOT review/approval where required.
- Electronic deliverables: PDF and editable CAD files [CAD platform/version placeholder] and associated design files, plus calculations and support documentation.
The City anticipates selecting one (1) firm to provide design services. Contracting may be structured as a single agreement covering all seven intersections with negotiated task authorizations, or separate negotiated scopes aligned with each intersection’s planned delivery window. The City reserves the right to adjust scope, schedule, packaging, and sequencing based on funding, permitting, and project priorities.
7. SOQ Submission RequirementsProvide one (1) complete SOQ organized as follows:
- Cover Letter (signed by an authorized representative).
- Firm Profile (office locations, years in business, Tennessee licensure status; prime/subconsultant roles).
- Project Team and Key Personnel (Project Manager, Lead Signal Engineer, QA/QC lead; brief resumes; relevant certifications).
- Relevant Experience (comparable mast arm, state route coordination, signal replacement, and MOT projects; include references).
- Project Understanding and Approach (delivery sequencing across staggered dates; TDOT coordination; MOT/TCP development; existing-signal changeover phasing; future pedestrian readiness; pavement markings).
- Quality Management (QA/QC processes, checklists, and independent review steps).
- Capacity and Availability (workload and ability to meet anticipated windows Winter 2026 through Q2 2029).
- Litigation/Claims/Disclosures (as required by City policy).
Submittal Format:
- Electronic PDF emailed to Kristi Powers at For security reasons, you must enable JavaScript to view this E-mail address.
- File naming convention: FirmName_SOQ.pdf
- Deadline: February 9, 2026, at 4 PM, ET (Late submittals will be rejected)
SOQs will be evaluated based on qualifications and demonstrated capability, including:
- Project team qualifications and relevant experience (signals, mast arms, replacements).
- Understanding of scope and approach (including MOT, phasing, future pedestrian readiness).
- Experience coordinating with TDOT and working on state routes.
- Quality management / QA/QC procedures.
- Capacity to meet schedule windows.
- Past performance and references.
The City may short-list firms and conduct interviews at its discretion.
9. City ContactsAny project questions should be directed to David Sheely, Transportation Director, For security reasons, you must enable JavaScript to view this E-mail address. . Deadline for questions is February 3, 2026, at 5:00 PM, ET.
10. Reservations and ConditionsThe City reserves the right to:
- Reject any or all SOQs; waive informalities; request clarifications; and modify the schedule.
- Negotiate scope and compensation with the highest-ranked firm; if unsuccessful, terminate negotiations and proceed to the next ranked firm.
- Modify intersection packaging, priorities, or timing.
- Eliminate an intersection from the list and insert a comparable intersection as a substitution.
Appendix A – Required Design Deliverable Checklist (Summary)- New powder-coated black mast arm layouts and foundation designs (all intersections).
- TDOT T-SG series standards incorporated.
- TDOT Special Provision 730CLEV (SP730CLEV) included and applied for complete in-place signal systems (including incidentals).
- Traffic signal phasing drawings (all intersections).
- Traffic control/MOT plans and construction staging (all intersections).
- Soil borings and geotechnical report (all intersections).
- Existing signal transition/removal phasing (Intersections 4 and 5).
- Future pedestrian equipment readiness (all intersections).
- Pavement marking plans including pedestrian markings (all intersections).
- Channelized right-turn island design within the existing intersection footprint (as applicable; see Section 3.2.1).
- OPCC and quantities suitable for bid documents.
Publication Date/Time: 1/21/2026 8:00 AM Closing Date/Time: 2/9/2026 4:00 PM Related Documents: View Document(s) - Commodity Codes
-
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Backflow Inspection, Repair a...
Name of Solication Bid Number Opens Buyer Backflow Inspection, Repair and Installation Services
Knox County
Bid Due: 7/31/2053
Traffic Signal Equipment - Ma...
Bid Number: 27-0003 Bid Title: Traffic Signal Equipment - Materials Only - Annual
City of Hendersonville
Bid Due: 7/31/2026