Runway Pavement Rehabilitation at the Billy Mitchell Airport (HES) in Dare County for the NCDOT Division of Aviation Addendum 1
Project Information
- Bid Title
- Runway Pavement Rehabilitation at the Billy Mitchell Airport (HES) in Dare County for the NCDOT Division of Aviation Addendum 1
- Issuing Agency
- Division of Highways
- Location
- North Carolina
- Published Date
- Jun 10, 2026
- Closing Date
- Jun 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
DA00681POCRunway Pavement Rehabilitation at the Billy Mitchell Airport (HES) in Dare County for the NCDOT Division of Aviation
-
DA00681 Addendum 1.pdfDoc. Type:
Addendum
Description: Runway Pavement Rehabilitation at the Billy Mitchell Airport (HES) in Dare County for the NCDOT Division of Aviation POC -
DA00681 Billy Mitchell Pre-Bid Recording.m4aDoc. Type:
Contract Information
Description: Runway Pavement Rehabilitation at the Billy Mitchell Airport (HES) in Dare County for the NCDOT Division of Aviation POC -
DA00681 Invitation to Bid, Mandatory Pre- bid.pdfDoc. Type:
Invitation to Bid
Description: Runway Pavement Rehabilitation at the Billy Mitchell Airport (HES) in Dare County for the NCDOT Division of Aviation POC -
DA00681 Plans - Complete Set.pdfDoc. Type:
Plans
Description: POC -
DA00681 Plans - Individual Sheets.zipDoc. Type:
Plans
Description: POC -
DA00681 Prebid Meeting Sign-in Sheet.pdfDoc. Type:
Bid Roster
Description: POC -
DA00681 Proposal.pdfDoc. Type:
Proposals
Description: POC
- Attachment Preview
-
JOSH STEINGOVERNORSTATE OF NORTH CAROLINADEPARTMENT OF TRANSPORTATIONDANIEL H. JOHNSONSECRETARYADDENDUM NO. 1June 10, 2026Contract No.TIP No.:Federal Aid No.:WBS Element:County:Description:Letting Date:DA00681N/AState Funded36244.73.1.1DareRunway Pavement Rehabilitation at the Billy Mitchell Airport (HES)June 17, 2026To Whom It May Concern:This Addendum is issued to modify or clarify the bid documents previously furnished for theabove-referenced project. The following changes shall be incorporated into the contractdocuments:In response to questions during the pre-bid meeting, and to ensure consistent information for allparties, we have listed the inquiries and answers below.Questions:1) Can more time be allotted for the bid option due to crack seal time frame?Answer: The contract time will remain as defined in the contract documents. If thecontractor experiences delays to the project due to circumstances outside of theircontract, including delays associated with the crack seal, the contractor shall not bepenalized for those delays. It shall be the contractor's responsibility to document thosedelays in writing to the project representative during and immediately after the delay.2) How will payment for patching with ABC be handled for the removal of tie downs bycontractor?Answer: Cost of stone or other approved method for replacing/repairing the stone at thearea for the tie down removal shall be considered incidental to the tie down removal.Mailing Address:NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS – DIVISION 1113 AIRPORT DIVE, SUITE 100EDENTON, NC 27932Telephone: (252) 482-1850Fax: (252) 482-8722Customer Service: 1-877-368-4968Website: www.ncdot.govLocation:113 AIRPORT DRIVE, SUITE 100EDENTON, NC 27932DA00681 Addendum #13) At what depth should the subgrade stabilization, if required, be for estimating purposes?Answer: If the underlying material is deemed not suitable then the Contractor shallstabilize the subgrade per Type I subgrade stabilization as outlined in Section 505 of the2024 NCDOT SSRS. Per Section 505 of the 2024 NCDOT SSRS, Type 1 – A 6- to 24-inch-thick aggregate subgrade with Class IV subgrade stabilization compacted to 92% ofAASHTO T 180 as modified by the Department or to the highest density that can bereasonably obtained.4) How will contract time be addressed if something happens outside of the contractors’control?Answer: See Answer to Question 1.5) What is the depth of the existing asphalt section?Answer: 3.5” - 6” on the runway.6) Is funding already secured for this project?Answer: Yes.7) Do the joints for the paved areas need cut back?Answer: All joints left exposed for more than four (4) hours, or the surface temp hascooled to less than 1750F must be cut back a max of 3”.8) Is a shuttle buggy or MTV required for this project?Answer: Yes9) What methods can be used for the tie down removal and will they need to be salvaged.Answer: Tie downs can be removed six inches below bottom of stone by cutting orgrinding and leaving the anchor in place. The tie downs do not need to be salvaged.10) What are the work restrictions for the project?Answer: Work can be seven (7) days a week, sunrise to sunset.Other Notes from the Pre-bid Meeting:• Closure markers are provided by NPS. Airport to be closed throughout the duration of theproject. Contractor to monitor CTAF.• Airport gate is to remain closed and locked when not in use. Contractor to be responsiblefor security while onsite. If you see something, the contractor should notify the appropriateparties. Contractor to contact 911 or emergency services for emergencies.• NOTAMs are to be coordinated and issued by NPS.Page 2 of 3DA00681 Addendum #1All other terms and conditions of the original bidding documents remain unchanged.Sincerely,Mark S. WinslowDivision Contract Engineercc: R. K. Sawyer, PEM. B. Gill, PEB. N. Braswell, PED. B. Otts, PEC. A. Spear, PEJ. B. SchronceK. I. LongPage 3 of 3
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Historic Courthouse Drywall C...
Bid Title: Historic Courthouse Drywall Ceiling Repairs and Painting RFP Category: Public Buildings
County of Carteret
Bid Due: 7/16/2026
Follow Repair BEQ HP135 Active Contract Opportunity Notice ID N4008526R9044 Related Notice Department/Ind.
DEPT OF DEFENSE
Bid Due: 7/16/2026