RFB-112-25 23122AMLBAML Morton Lane Slide

Project Information

Bid Title
RFB-112-25 23122AMLBAML Morton Lane Slide
Issuing Agency
State Government of Kentucky
Location
Kentucky
Published Date
Nov 7, 2024
Closing Date
Nov 14, 2024
Government Level
State & Local
Status
Closed
Ref. #
RFB-785-2500000210-2
Original Source
Join to Access Full Details
Project Description

Description: RFB-112-25 23122AMLBAML Morton Lane Slide

Department: Facilities & Support Services

Buyer: Kristi Sharp

Solicitation Number: RFB-785-2500000210-2

Type: Request for Bids (RFB)

Category: Construction

Closing Date and Time: 11/14/2024 09:30 AM EST


Buyer Information
Buyer Name
Kristi Sharp
Buyer Email
Kristi.Sharp@ky.gov
Buyer Phone
502-330-9858
Important Dates
Issue Date
10/21/2024
Closing Date
11/14/2024 09:30 AM EST
Bid Opening Date
11/14/2024 11:00 AM EST
Last Amended
11/07/2024
Department Information
Category
Construction
Type
Request for Bids
Document Department
785
Status
Amended
Description
RFB-112-25 23122AMLBAML Morton Lane Slide
Group 1
Default Commodity Group
Number of Lines: 1
Line Number Commodity Description Details Requested
1
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Docum 23122AMLBAML (Morton Lane Slide Reclamation Project) Hopkins County, Kentucky Project Description The 23122AMLBAML (Morton Lane Slide AML Reclamation Project) is located in Hopkins County, Kentucky, at N 37°13'38.4", W 87°25'38.7" will reclaim approximately 14.5 acres adversely affected by previous coal mining operations. The project consists of reclaiming a 5-acre landslide and eliminating approximately 2.5 acres of poor water quality mining pits. The pits will be backfilled with slide material and on-site mine spoil material to create positive drainage with transitions as required. Blasting will not be permitted. The water in the pits will be treated and raised to a pH of 6 or greater prior to release and backfilling of the pit in accordance with KYDAML Technical Specifications. Work for this project will involve the removal of trees measuring over 3 -inches in diameter at breast height (DBH) at the project location outside of exempt unstable areas and this cutting shall occur from October 15th March 31st, when the imperiled forest-dwelling bats are either within or in the immediate vicinity of their winter hibernacula. The clearing of trees over 5 DBH, which also display characteristics such as shaggy, exfoliating bark, or crevices and hollowed-out cavities within their trunks and larger limbs is also required outside of the exempt unstable areas, and consultation with United States Fish and Wildlife Service (USFWS) has taken place. The slide will be excavated to the templates shown in the drawings, basically at a 5h:1v slope with a 10 ft wide diversion bench every 100 ft horizontally. If solid competent bedrock is encountered prior to achieving the designed slope, the excavation will follow the rock line until returning to the designed slope. If acidic spoils are encountered in the slide or spoil piles, they shall be used first in backfilling the pit to eliminate the acid forming potential of these materials. This effort will require additional effort and may require double handling of some soils. Once all acidic spoils are placed in the pit, then slide materialwill be utilized in developing the positive drainage for the pits. Ditches consisting of both riprap and ECB will be utilized when necessary to control and establish drainage once the pit is closed. ECB diversion ditches will run to riprap down drains that will tie in the roadside ditch. The drop drains will be located as depicted on the design plans or as required by the Engineer. Drainage ditches will direct run-off into the existing mine pit/bench. Some select slide material can be placed as shown on the plans on the Willis property. Best Management Practices (BMP's) for sediment control will be utilized at all times and any necessary silt control will be in place prior to any backfilling the pits or excavating the slide. Rock checks will be placed as needed in steep slope areas. Roadside ditches will be improved to allow for greater flow. Roadway stone will be placed on all gravel accesses and used as necessary during the project and at the conclusion of the project. Roadway ditches will be cleaned out and ECB or Class II will be installed as directed. HDPE culverts will be installed as shown on the plans. Concrete will be used to grout the Class II at the outlet of the culvert installed beneath Morton Lane. Revegetation efforts will be performed according to AML Specifications. Lime will be spread at 15 tons to the acre. Fertilizer will be 18-46-60 at a rate of 0.375 tons per acre. The seed mix for the site will be an AML mix broadcast at 80 pounds pure live seed per acre. All other aspects of revegetation will conform to the technical specificatio
Specifications
Commodity Code
912
Service From
11/20/2024
Service To
08/17/2025
View Purchase History
Additional Information
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.