RFP Exterior Commercial Building Painting
Project Information
- Bid Title
- RFP Exterior Commercial Building Painting
- Issuing Agency
- Quinault Indian Nation
- Location
- Washington
- Published Date
- Jun 3, 2026
- Closing Date
- Jun 26, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: RFP Exterior Commercial Building Painting
Category: Tribal Employment Rights Ordinance (TERO) Status: Open Description: Quinault Wellness Center (QWC) and Quinault Community Health (QCH) are seeking qualified and experienced contractors to submit proposals for painting the exterior of the organizations' Administration Building located at 421 W. State St., Aberdeen, WA. 98520.
SEE RELATED DOCUMENT BELOW
Publication Date/Time: 6/2/2026 12:00 AM Closing Date/Time: 6/26/2026 11:59 PM Contact Person: Proposal Submittal
Firms are solely responsible for all costs incurred in the preparation and submittal of the RFP. Submittal becomes the property of QWC/QCH and will not be returned.
•
Respondents shall submit an electronic proposal that is limited to 10 pages. Responses must be received by June 26, 2026.Send your submittals to:
Jim Scott
Facilities Director
Quinault Community Health
jim.scott@quinaultwc.org.
Related Documents: - Attachment Preview
-
Quinault Wellness Center and Quinault Community Health421 W. State Street Aberdeen, WA 98520 Tel: (564) 544-1950June 1, 2026Request for Proposal# 2026-0004Exterior Commercial Building PaintingRequest for ProposalsQuinault Wellness Center (QWC) and Quinault Community Health (QCH) are seeking qualified andexperienced contractors to submit proposals for painting the exterior of the organizations'Administration Building located at 421 W. State St., Aberdeen, WA. 98520.IntroductionQWC and QCH invite qualified painting contractors to submit proposals to provide exterior surfacepreparation and painting services for the Administrative Building.The selected contractor shall provide all labor, supervision, equipment, tools, materials,transportation, and consumables necessary to complete the project in a safe, professional, andtimely manner.The purpose of this project is to improve and preserve the exterior appearance and integrity of theAdministrative Building while ensuring durability against Western Washington weather conditions.All work shall be completed in accordance with industry standards, manufacturer recommendations,and applicable federal, state, and local regulations.Scope of WorkThe selected contractor shall provide all labor, materials, equipment, lifts, scaffolding, safetymeasures, and supervision necessary to complete the project.1. Surface Preparation• Pressure washing and cleaning of all applicable exterior surfaces• Scraping and removal of loose or peeling paint• Sanding and surface preparation as needed• Caulking and sealing gaps, joints, and penetrations• Minor patching and repair of damaged surfaces prior to painting• Protection of windows, doors, landscaping, walkways, and adjacent surfaces2. Exterior Painting• Priming of surfaces as required• Application of commercial-grade exterior paint coatings• Painting of exterior siding, trim, fascia, soffits, doors, and other designated surfaces.RFP QWC and QCH Admin Building Exterior Paint– June 2026Page 1 of 5Quinault Wellness Center and Quinault Community Health421 W. State Street Aberdeen, WA 98520 Tel: (564) 544-19503. Site Protection and Cleanup• Daily cleanup of work areas• Proper disposal of paint materials and debris• Protection of patients, staff, visitors, and vehicles during work activities• Final site cleanup upon project completion4. Project Coordination• Coordination of work schedules to minimize disruption to office operations• Communication with the Facilities Director regarding project progress and scheduling• Notification of unforeseen conditions requiring additional work or repair5. Contractor Responsibilities• Provide a designated project manager or primary point of contact• Maintain all required business licenses and insurance• Comply with OSHA, state, and local safety regulations• Ensure all personnel maintain professional conduct while on-site• Provide all necessary safety equipment and fall protection measures6. Materials and Product RequirementsContractors shall specify the following within their proposal:• Paint manufacturer and product line• Surface preparation methods• Primer products to be utilized• Estimated paint coverage and number of coats• Warranty information for labor and materialsAll materials shall be commercial-grade products suitable for exterior healthcare facility applicationsand Western Washington environmental conditions.A pre-bid site walk with the Facilities Director is required to improve bid accuracy and reduce changeorders.All work must be completed in a manner that minimizes disruption to office operations.Cost EstimatesProposals must include a detailed cost estimate, including:• Labor costs• Materials and equipment• Permits and fees• Project management costs• Any additional or optional costs• Clearly identified allowances or contingenciesRFP QWC and QCH Admin Building Exterior Paint– June 2026Page 2 of 5Quinault Wellness Center and Quinault Community Health421 W. State Street Aberdeen, WA 98520 Tel: (564) 544-1950Project TimelineContractors should demonstrate the ability to meet timelines while accommodating a healthcaresetting with active patient services.• Estimated Project Start Date: July 6, 2026• Estimated Project Completion Date: July 13, 2026Proposal SubmittalFirms are solely responsible for all costs incurred in the preparation and submittal of the RFP.Submittal becomes the property of QWC/QCH and will not be returned.• Respondents shall submit an electronic proposal that is limited to 10 pages. Responses mustbe received by June 26, 2026.Send your submittals to:Jim ScottFacilities DirectorQuinault Community Healthjim.scott@quinaultwc.org.Proposals shall demonstrate that the firm has the professional capability and availability to completeall the tasks satisfactorily. Contractors must be properly licensed and meet Washington StateDepartment of Labor & Industries requirements. Responses shall include:1. The company’s legal name, address, telephone number and key contact email address;2. The project manager assigned this project and a brief description of their qualifications andlist of projects and date of completion for projects similar in scope and experience workingwith tribes;3. The proposed work plan and schedule for activities to be performed;4. Bid proposal based on the proposed scope of work, work plan and schedule;5. Equipment specifications including manufacturer, make, and model numbers;6. Warranty details including parts and labor;7. Necessary or planned subcontractors, if any;8. The firm’s Billing contact name, email, and phone number. Also include the preferredinvoicing schedule and terms;9. Proof of current license, bond and insurance, including general liability insurance, worker’scompensation, professional liability insurance, if applicable. Include coverage limits andcertificates of insurance;RFP QWC and QCH Admin Building Exterior Paint– June 2026Page 3 of 5Quinault Wellness Center and Quinault Community Health421 W. State Street Aberdeen, WA 98520 Tel: (564) 544-195010. A minimum of three references that are knowledgeable regarding the firm’s performance onprojects. The references shall be for projects on which the Project Manager has performed.Evaluation Criteria and the Selection ProcessThe basis of the award will be to the respondent receiving the most points based on the followingcriteria:• Completeness of the submittal (15 points)• Quality of services (20 points)• Cost / Price Proposal (20 points)• Reputation and experience (15 points)• Ability to meet all deadlines for delivery of the items (15 points)• Understanding of healthcare facility requirements (15 points)Total Possible Score: 100 PointsProposals scoring below 70 points may be considered non-responsive and may not be eligible foraward.Preference will be given to qualified Indian-owned firms per the QIN’s Indian Preference Policy.Respondents must not have been suspended or debarred by the federal government.RFP QWC and QCH Admin Building Exterior Paint– June 2026Page 4 of 5Quinault Wellness Center and Quinault Community Health421 W. State Street Aberdeen, WA 98520 Tel: (564) 544-1950The successful bidder will sign a Standard Independent Contractor Agreement with QWC/QCH.QWC/QCH reserves the right to accept or reject all or part of the proposal/bid, and to negotiate withthe respondents to ensure that QWC/QCH receives appropriate deliverables within the requiredtimeframe.*** END ***RFP QWC and QCH Admin Building Exterior Paint– June 2026Page 5 of 5
- Commodity Codes
-
- NAICS 238320Painting and Wall Covering Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
BID - SVC - Old Main Sewer Re...
Project: BID - SVC - Old Main Sewer Replacement - Skagit Valley College
State Government of Washington
Bid Due: 7/23/2026
BID - SVC - MV Campus - Aspha...
Project: BID - SVC - MV Campus - Asphalt Repair and Re-striping -
State Government of Washington
Bid Due: 7/09/2026