Springfield, Greene County Route: Various, An access and operational study for US-60, US-65, and proposed East-West Arterial corridors
Project Information
- Bid Title
- Springfield, Greene County Route: Various, An access and operational study for US-60, US-65, and proposed East-West Arterial corridors
- Issuing Agency
- Missouri Department of Transportation(MDOT)
- Location
- Missouri
- Published Date
- Nov 13, 2025
- Closing Date
- Dec 5, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date NEW 11/12/25 OT2601-26A2 Springfield, Greene County Route: Various, An access and operational study for US-60, US-65, and proposed East-West Arterial corridors Jennifer Thomas jthomas@ozarkstransportation.org 417-865-3042 x108 12/5/25 - Attachment Preview
-
Ozarks Transportation Organization2208 W. Chesterfield Blvd., Suite 101Springfield, MO 65807Phone: (417) 865-3042 Ext. 100REQUEST FOR QUALIFICATIONS: RFQ 2025-3 US-60/US-65 Access and Operational StudyDEADLINE: Friday, December 5, 2025, at 3:00 PM, Central Standard TimePURCHASING AGENT: Debbie Parks, 417-865-3042 x 106, dparks@ozarkstransportation.orgDATE OF ISSUE: Wednesday, November 12, 2025Dear Consultant:The Ozarks Transportation Organization is requesting the services of a consulting engineering firm toperform the professional services described for the project included on the attached list. If your firmwould like to be considered for these consulting services, you may express your interest by responding tothe appropriate office, which is indicated on the attachments. Limit your Statement of Qualifications to nomore than 5 (five) pages. This letter should include any information which might help us in the selectionprocess, such as the persons or team you would assign to each project, the backgrounds of thoseindividuals, and other projects your company has recently completed or are now active. It is required thatyour firm be prequalified with MoDOT and listed in MoDOT’s Approved Consultant Prequalification List, oryour firm will be considered non-responsive.DBE firms must be listed in the MRCC DBE Directory located on MoDOT’s website at www.modot.gov, inorder to be counted as participation towards an established DBE Goal. We encourage DBE firms to submitletters of interest as prime consultants for any project they feel can be managed by their firm.We request all letters be received by December 5, 2025, at 3:00 pm at dparks@ozarkstransportation.org.Sincerely,Jennifer Thomas, P.E.Transportation EngineerRFQ 2025-3 US-60/US-65 Access and Operational StudyPage | 1COVER SHEETRFQ 2025-3 60/65 Access and Operational StudyThe undersigned hereby certifies a thorough review of this Request for Qualifications. Theundersigned also certifies the firm and key personnel indicated in its Statement of Qualifications willbe used on this project in the same manner and to the same extent as indicated. All statements,representations, covenants, and/or certifications set forth in the Statement of Qualifications arecomplete and accurate.Name of Firm/Consultant:Contact Person:E-Mail:Business Address:City:Signature:State:Title:Phone:Zip:Date:RFQ 2025-3 US-60/US-65 Access and Operational StudyPage | 2City/County: Springfield, Greene County Route: VariousTIP No:OT2601-26A2Location:Springfield, MOLength:Approximately 12 milesProposed Improvement:An access and operational study for US-60, US-65, and proposed East-West Arterial corridors.DBE Goal Determination:Consultant Services Required:0%See Draft Scope of ServicesOther Comments:Execution of this study contract is contingenton full execution of agreement(s) with City ofSpringfield, Missouri, Missouri Highways andTransportation Commission, Greene Countyand City Utilities.Contact:Name: Jennifer Thomas, P.E.Phone: 417-865-3042 x108Email: jthomas@ozarkstransportation.orgDeadline:12/5/25 at 3:00pmSubmit: Statements of Qualifications should not exceed 5 pages total. A page is defined as 8-1/2by 11 inches and printed on one side. Electronic submissions only.Pursuant to the Brooks Act for Consultant Selection – the following criteria will be the basis for selection.Project Understanding & InnovationPast PerformanceQualifications of Personnel AssignedGeneral Experience of FirmFamiliarity/CapabilityAccessibility of Firm & StaffProject Schedule25 Points Max25 Points Max20 Points Max10 Points Max10 Points Max5 Points Max5 Points Max100 Points Max TotalRFQ 2025-3 US-60/US-65 Access and Operational StudyPage | 3I. GENERAL INFORMATIONBACKGROUND. The US-60/US-65 Access and Operational Study includes analysis of two US highwaysthat intersect in the southeast area of Springfield. These highways provide critical linkages to a largeportion of Missouri.This study will examine alternatives within the study limits to serve existing and future needs with theintent to improve traffic operations, travel time, reliability, economic development and safety. Thisstudy will also include a detailed analysis of current and projected traffic in relation to current facilitydeficiencies, including structural bottlenecks, substandard roadway design, system capacity andreliability during weather events, emergency operations, and environmental constraints.PROJECT GOALS. The primary goals of the Access and Operational study are to:• Develop both short-term and long-term alternatives and identify proposed actions forimproving operational performance,• Establish a timeline for improvements of non-flyover ramps at 60/65,• Meeting future transportation needs regarding future and existing access within the studyarea, including potential development driven improvements• Assess overall network connectivity in future scenarios, including evaluation of andrecommendations for the complementary arterial and collector roads within the studyareaThe study area is generally described as the Battlefield/US-65 Interchange to the north, the Greene-Christian County line to the south, the Glenstone/US-60 interchange to the west, and the Routes J-NN/US-60 Interchange to the east, as well as undeveloped areas adjacent to the proposed East-West arterialalignment and areas adjacent to US-60 east to MO-125. See map for further details. As part of the studyprocess, it will be necessary to identify public, environmental and resource concerns and opportunities inthe study area and use this information, along with public/stakeholder involvement, to develop thepurpose and need then evaluate alternatives to address the purpose and need.The Consultant shall follow the requirements outlined in MoDOT’s Engineering Policy Guide, including, butnot limited to, the PEL and NEPA guidance in Section 127.28.SCHEDULE. The following is the schedule of events which are anticipated by OTO for theimplementation and completion of selecting the firm/consultant to provide the requested services asoutlined in the Statement of Scope. OTO may, in its discretion, revise the schedule of events at any timeit may be in its best interests:EventSubmittals DueShortlist NotificationsInterviewsFirm Selection NotificationDateDecember 5, 2025December 12, 2025December 17 or 18, 2025December 19, 2025Initial estimated hours and fee will be due from chosen consultants two weeks after notification, with anyrevisions due one week from revision request.RFQ 2025-3 US-60/US-65 Access and Operational StudyPage | 4OTO POLICIES AND PROCEDURES.This RFQ does not commit OTO to select a firm/consultant or to pay any costs incurred in thepreparation or mailing of the submittal. A failure to award a contract will not result in a cause foraction against the OTO.OTO reserves the right to the following:1. To waive minor deficiencies and informalities;2. To accept or reject any or all submissions received as a result of the RFQ;3. To obtain information concerning any or all proposers from any source;4. To request an oral interview from any or all proposers;5. If the selected firm/consultant undergoes a change of key personnel, OTOreserves the right to approve any substitute personnel or terminate the servicesat OTO sole discretion;6. To seek new submissions when such a procedure is reasonable and in thebest interests of OTO. OTO complies with Federal Contracting Requirements.A list of applicable contract language can be found on the OTO website:htps://www.ozarkstransportation.org/uploads/documents/Federally-Required-Contract-Clauses.pdfThe OTO follows FHWA purchasing guidelines and does not pay retainers or in advance ofcompleted deliverables.II. SUBMISSION INSTRUCTIONSFORMAT OF SUBMISSIONS. In order for the OTO to adequately compare statements of qualifications(SOQ) and evaluate them uniformly and objectively, all SOQs shall be submitted in accordance withthe format outlined below. The SOQ should be prepared simply and economically, providing straight-forward and concise information as requested.Below are the requirements for the statement of qualifications:Cover Sheet – SignedProject Understanding & Innova�on, Past Performance, Qualifica�ons ofPersonnel assigned, General Experience of Firm, Familiarity/Capability,Accessibility of Firm and Staff, Project ScheduleSimilar Projects* A page will be considered one side of an 8.5”x11” size sheet of paperMaximum No.Pages*131It is required that your firm be prequalified with MoDOT and listed in MoDOT’s ApprovedConsultant Prequalification List, or your firm will be considered non-responsive.RFQ 2025-3 US-60/US-65 Access and Operational StudyPage | 5
- Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541611Administrative Management and General Management Consulting Services
- NAICS 541690Other Scientific and Technical Consulting Services
- NAICS 541990All Other Professional, Scientific, and Technical Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
REQUEST FOR PROPOSAL (RFP) ST...
REQUEST FOR PROPOSAL (RFP) STATE 0000000444SL: Rural Medical Clerkship Development Close Date 07/07/2026
State Government of Missouri
Bid Due: 7/07/2026
Community Development Rehabil...
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of St. Joseph
Bid Due: 8/05/2026