BD27-103 Atchee Ridge Fuel Break Bullhog
Project Information
- Bid Title
- BD27-103 Atchee Ridge Fuel Break Bullhog
- Issuing Agency
- State Government of Utah
- Location
- Utah
- Published Date
- Sep 8, 2026
- Closing Date
- Sep 14, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- BD27-103
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project: BD27-103 Atchee Ridge Fuel Break BullhogRef. #: BD27-103Department: Division of PurchasingType: IFBStatus:OpenOpen Date: Sep 3rd 2026, 9:00 AM MDTQuestions Due Date: Sep 11th 2026, 8:00 AM MDTClose Date: Sep 14th 2026, 2:00 PM MDT
Project Description: Issuing Procurement Unit: State of Utah Division of Purchasing
Conducting Procurement Unit: Division of Wildlife Resources + USWFS + BLM
Participation in this solicitation is limited to prequalified contractors only. Do NOT submit if you are not on the current Pre-approved/Pre-qualified Vendor list.
The purpose of this IFB is to enter into a contract to provide: wildlife habitat improvement and wildland fire hazard reduction by mechanically removing/shredding standing live and dead pinyon and juniper trees, saplings, and brush with a wheeled or tracked mechanical mulcher/shredder/masticator on 260.4 acres of the Indian Spring and Augisi Ridges, Book Cliffs, and Spring Ridge by November 30th, 2026.
Mandatory Site Visit: A site visit will NOT be held prior to bidding. It is strongly recommended that each potential bidder inspect the site where services are to be performed and satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
It is strongly recommended that each potential bidder ensures that they have a complete understanding of the requirements of this project. Bidders are urged to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
.
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.
Project Performance Time: From time of award until November 30th, 2026.
Vendor must guarantee its pricing through completion of the project.
- Commodity Codes
-
- NAICS 115310Support Activities for Forestry
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CC26066? Outdoor Christmas Tree
description opening date closing date CC26066 Outdoor Christmas Tree September 16, 2026 :
City of Riverton
Bid Due: 10/22/2026
AS27-118 Color Country Paria ...
Project: AS27-118 Color Country Paria River District Lop and Scatter Ref. #: AS27-118
State Government of Utah
Bid Due: 10/23/2026