Addendum No. 1 ITB25-FAC-0083 Chiller Replacement @ Abramson School (2.13.26)
Project Information
- Bid Title
- Addendum No. 1 ITB25-FAC-0083 Chiller Replacement @ Abramson School (2.13.26)
- Issuing Agency
- New Orleans Public Schools
- Location
- Louisiana
- Published Date
- Feb 13, 2026
- Closing Date
- Feb 24, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 25-FAC-0083
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Addendum No. 1 ITB25-FAC-0083 Chiller Replacement @ Abramson School (2.13.26) - Attachment Preview
-
PIVOTAL , LLC1515 POYDRAS STREET, SUITE 1150NEW ORLEANS, LA. 70112(504) 799-3653ADDEDNDUM # 1CHILLER REPLACEMENT @ ABRAMSON SCHOOLOwner: Orleans Parish School Board (OPSB)Program Manager: Manning Architects (Clarence Eugene III – Sr. Project Manager)Project #: ITB25-FAC-0083Date: 02/13/2026Project Location: 5552 Read Bl, New Orleans, LA. 70127POR: Pivotal Engineering LLC, Bassam Rossi Mekari, PE / 225-205-3490I- Answers To Questions/Emails:Email Questions/Answers in red below:1. Is the roof under a current warranty and if so, who holds the warranty? Who installed the roof? What typeof roof?Answer: See attached Appendix D2. Will contractor be allowed to use dura-block pipe supports for new piping vs opening the roof to mountnew supports? On page m-1.0 ( typical pipe supports) this particular support will not apply to corrugateddeck roof. Please advise.Answer: Dura-Block, Piers, Cooper or any weather resistant and UV resistant supports areacceptable.3. What is the existing piping material? Steel or Aquatherm?Answer: Bid on Steel pipe. Verify with engineer during construction and prior to any rough in orpurchasing of any material.4. Will temp chiller be required? If so , what tonnage is required and will there be a pump needed? Where canwe get temp chiller power? Were will we be allowed to place temp chiller and pump?Answer: This falls mainly under Contractor means and methods. The critical requirement is thatthe school has the ability to always condition the air. How that is accomplished is in the purview ofthe contractor. For rental chillers, contractor has a choice to provide a pump or use existing pumpsas long as the pressure drop across the rental Chiller with the hose pipe length is less than the newChillers pressure drop. Coordinate lay-down area with school maintenance. As discussed in the pre-bid meeting, rental chillers cannot be placed on the roof . Size of the Chiller will depend on time ofyear. Off season, cooler weather 110-125 Tons, Warmer weather Tons 180 Tons.For powering the rental Chiller, the contractor can use the existing MDP in the mechanical room anduse one or both of the (2) 400 A, CBs that are presently powering the (2) existing chillers. If rentalPage 2 of 5chiller requires more than 400 A, GC can supply a temp CB and install in the existing MDP whilecoordinating with the engineer sizes of CBs and temp feeders.5. Per pre bid conference , we were told that ceiling work is required to install new beams under existingchiller platform. This will require removing a lot of sheetrock ceilings and install a lot of scaffolding toreach ceilings. There will be extensive work to be done in these areas that are not on the prints. Also, toattach new steel, holes will have to be burned into existing steel to bolt up new steel. Smoke , potential forfire in this area and construction debris will be present while this work takes place. These areas will not beaccessible to the school until this work is completed. The only other way to do this work would be to cutopen the roof and remove the corrugated decking to expose the entire space below. This would be a majorcompromise to weather with not a lot of ways to protect the building from water damage from rain. Pleaseadvise.Answer: This is part of the contractor's means and methods. GC to coordinate with schoolwith closure of the work area. This portion of the work has to be completed prior toinstalling the Chillers.6. Architectural drawings are referenced on sheet S001, but the current bid set does not includearchitectural drawings. Will architectural drawings be provided?Answer: This refers to some dimensions taken from old drawings. GC to verify thedimensions with existing at site prior to any rough ins or ordering equipment. Informengineer if any conflicts exist.7. Davis Bacon rates are referenced in the bid documents, but the bid documents don't include awage determination. Which determination/decision applies to this project?Answer: There are no federal funds associated with this project; therefore, this programdoesn’t apply to this project.8. Is BUY America required for this project?Answer: Same as #7 above.9. There seems to be conflicting information regarding whether the material should be shop primedor galvanized. Which is correct?Answer: All steel needs to be shop primed and the bolts are galvanized.10. Are the existing beams shown on sheet S100 apart of the existing roof structure or apart of theexisting chiller platform?Answer: The "Roof framing plan" refers to existing roof and "High roof framing plan"refers to the chiller platform. Accordingly, beams referred to as "existing" on plan exist atthat elevation11. Sheet S100 mentions reusing existing steel members. What are the size of these members, andhow should they be reused?Answer: Some existing steel beams need to be cut to the new layout. GC may use theexisting material or new of same size. Per the old drawings, the existing beams are the samesize as the new ones shown. GC to verify.12. What are the height of the new columns or how can we determine per the drawings?Answer: These are approximately 2’ long columns. Exact length to be field verified bybidder.13. Sheet S100 references removal of the beams highlighted below but also label them as existing for reuse.Initially we did not see the note that calls for reusing all of the material that will be removed. We are of thePage 3 of 5opinion it may be more cost effective to replace the existing beams and columns rather than removing andmaking adjustments to the old material. Please let us know if this will cause an issueAnswer: That is not an issue.General Clarifications/Field Discussions:1- School has to remain conditioned during construction.2- The roofing contractor has to be certified by Soprema and need to include his/her certification as part of theroofing submittal (see attached roof warrantee – Appendix D)3- All work is performed on the roof level and above as per plans. A mechanical platform for new Chillershas to be built above the roof (new base is longer and narrower than existing). Plan 1 shows the workneeded for the existing roof framing and Plan 2 shows the work needed for the platform. If a contractorhas a different means and methods for modifying the existing platform, submit to engineer for approval.4- If Acquatherm is no longer in business producing plastic pipe, then contractors can use compatible productsfrom a compatible chilled water piping manufacturer such as NUPI, Interplast, Isco etc. Contractor isresponsible to coordinate and select compatible fittings to match proper sizing (English/Metric)Additional Piping Information:A. Chilled Water Piping1.Larger than 2” Steel Pipe: ASTM A53/A53M, Grade B, Schedule 40, black., Malleable iron orforged steel fittings, threaded or welded joints.2.Larger than 2” PP-R (random copolymer polypropylene): ICC-ES PMG-1244, IAPMO FILE9840, ASTM F2389Socket fusion connections, instabranch and instaheader branches.3.2” and below Copper Tubing: ASTM B88, (ASTM B88M), Type L, drawn, cast brass, wroughtcopper, or mechanically extracted fittings, lead free solder joints.4.Below Grade PVC Pipe: ASTM D1785, Schedule 40 ASTM D2241, SDR 21 or 26 solvent weldjoints.5- Flushing of existing water loop piping: Water shall be treated as per AWT standards by a qualified watertreatment specialist. No water allowed to enter new chillers without flushing the system. Use Start upstrainers with manufacturers’ recommendations for screens micron size. Some typical values for closedloop Chilled Water Systems:a. Ph 8 to 10b. TSS < 10 mg/lc. Turbidity < 10 NTUd. Iron < 0.3 mg/le. Oil/Grease NDf. Chlorides – as recommended by manufact.II- Substitutions Information:As per the front-end bid documents in section 4.3, the following guidelines shall be met:“4.3 Substitutions:4.3.1 The materials, products and equipment described in the Bidding Documents establish a standardof quality, character, type, style, function, dimension, and appearance desired. Equivalent products maybe acceptable, as stated in La. R.S. 38:2212.T(2). It shall be the responsibility of the Architect/Engineer todetermine if a proposed substitution is equivalent. No substitutions shall be allowed after bidding, exceptas may be provided in the Contract Documents.4.3.2 No substitution will be considered unless written request for approval has been submitted by thePage 4 of 5Proposer and has been received by the Architect/Engineer at least seven (7) working days prior to thedeadline for submission of Bids. (La. R.S. 38:2295.C) Each such request shall include the name of thematerial or equipment for which it is to be substituted and a complete description of the proposed substituteincluding model numbers, drawings, cuts, performance and test data and any other information necessary foran evaluation. A statement setting forth any changes in other materials, equipment or work that incorporationof the substitute would require shall be included. It shall be the responsibility of the Proposer to includein his proposal all changes required of the Contract Documents if the proposed substitution is used. Priorapproval is given contingent upon supplier being responsible for any costs which may be necessary tomodify the space or facilities needed to accommodate the materials and equipment approved.4.3.3 If the Architect approves any proposed substitution, such approval will be set forth in anAddendum. Bidders shall not rely upon approvals made in any other manner.”The design/dimensions/roof modifications/electrical power distribution are based on Trane Chillers asscheduled in our bid documents.No accepted substitutionsIII- Tax ExemptionThis project is tax exemptIV- Cost EstimateOpinion Of Probable Cost = $1,275,000.00V- General Discussions During Pre-Bid Conference1- Logistics/Staging/School Entry explanations. Sign in log for all workers. Safety discussions aboutstaging for Cranes and equipment. Qualified/certified operators required for heavy equipment.Stand by Chiller rental. Extreme caution during roof work.2- Post Bid Documents submission discussions.3- GC is responsible for obtaining Addendum #14- During phasing of the work, GC is responsible to ensure that school is conditioned at all times.5- All CWS/CWR lines shall be properly flushed using chemicals/start up strainers prior toconnecting new Chillers.VI- Post Bid Document Checklist From OPSBAttached Appendix AVII- School CalendarAttached Appendix BVIII- Prebid Meeting AgendaAttached Appendix CPage 5 of 5IX – Roof WarranteeAttached Appendix DX – Sign In SheetAttached Appendix EEnd of Addendum #1Bassam Rossi Mekari, PE - PrincipalBassam Rossi MekariPivotal Engineering
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Bid Number Description Date Issued Bid Open Date/Time 50017-D2600050 Window Replacements Non-Mandatory Pre-Bid
State Government of Louisiana
Bid Due: 7/08/2026
Re-Bid #0004 Chiller Replacement
Bid Number Description Date Issued Bid Open Date/Time 50014-0004 Re-Bid #0004 Chiller Replacement
State Government of Louisiana
Bid Due: 7/22/2026