Request for Service Qualifications for As-Needed Routine Maintenance
Project Information
- Bid Title
- Request for Service Qualifications for As-Needed Routine Maintenance
- Issuing Agency
- San Mateo County Flood & Sea Level Rise Resiliency District
- Location
- California
- Published Date
- Jan 14, 2026
- Closing Date
- Feb 18, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Request for Service Qualifications for As-Needed Routine Maintenance
The San Mateo County Flood and Sea Level Rise Resiliency District (also known as OneShoreline) is seeking proposals from qualified firms, teams, joint ventures (JV), or other qualified business entities to submit a Qualifications Package for as-needed routine maintenance services in San Mateo County. OneShoreline anticipates awarding up to three (3) multi-year and multiple-project As-Needed Agreements from this Solicitation.
If interested please submit an electronic copy of a proposal by:
February 18, 2026, 5 PM Pacific Time, to:
Johnathan Perisho, Project Manager
San Mateo County Flood and Sea Level Rise Resiliency District
Projects@OneShoreline.org
Subject line: As-Needed Routine Maintenance RFSQDocuments
As-Needed Routine Maintenance RFSQ (January 14, 2026)
Appendix A — OneShoreline Standard Agreement
Appendix B — Minimum Qualifications Application
Appendix C — Proposer Qualification Forms
- Attachment Preview
-
Request for Service Qualifications forAs-Needed Routine MaintenanceRFSQ Number FSLRRD-2026-01-14Release Date: January 14, 2026Deadline to Respond:February 18, 2026 by 5:00 PMPre-Proposal Workshop:January 27, 2026 at 3 PMDeadline for Questions:February 4, 2026 by 5:00 PMTABLE OF CONTENTSI. Introduction .................................................................................................................................21.1. Project Overview.....................................................................................................................21.2. About OneShoreline ...............................................................................................................2II. Proposal Process and Requirements......................................................................................32.1. RFP Schedule..........................................................................................................................32.2. Pre-Proposal Workshop.........................................................................................................3Register here: .........................................................................................................................32.3. Submission of Questions ......................................................................................................32.4. Submission of Proposals ......................................................................................................42.5. Proposal Requirements .........................................................................................................42.5.1. Format and Length .......................................................................................................42.5.2. Exclusions from the 20-page Limit...............................................................................42.5.3. Required Content .........................................................................................................42.5.4. Minimum Qualifications Application (MQA) .................................................................42.5.5. Introduction & Executive Summary..............................................................................52.5.6. Proposer’s Responsibilities and Qualifications ............................................................62.5.7. Relevant Construction Experience...............................................................................72.5.8. Project References.......................................................................................................82.5.9. Key Personnel Experience and Qualifications.............................................................82.6. Initial Review ...........................................................................................................................92.6.1. Minimum Qualifications Application ...........................................................................102.6.2. Evaluation...................................................................................................................102.6.3. Selection and Award of Agreement ...........................................................................102.6.4. Legal and Contractual Disclosures ............................................................................10III. Project Background................................................................................................................113.1. Project Governance..............................................................................................................113.2. Colma Creek Flood Zone .....................................................................................................113.3. San Bruno Creek Flood Zone ..............................................................................................133.4. San Francisquito Creek Flood Zone...................................................................................163.5. Bayfront-Atherton Diversion Structure ..............................................................................173.6. Other Bayside Creeks and Coastside ................................................................................17IV. Scope of Work, Schedule, and Budget................................................................................184.1 Scope of Work........................................................................................................................184.1.1. General Repairs and Maintenance ............................................................................184.1.2. Example Permits ........................................................................................................194.2. Contract Service Orders (CSOs).........................................................................................194.2.1. Anticipated CSO Schedule.........................................................................................204.2.2. Anticipated CSO Budget ............................................................................................20AppendicesAppendix A — OneShoreline Standard Agreement and Insurance RequirementsAppendix B — Minimum Qualifications ApplicationAppendix C — Proposer Qualification FormsAppendix D — Example Permits1I. Introduction1.1. Project OverviewThe San Mateo County Flood and Sea Level Rise Resiliency District (also known asOneShoreline) is seeking proposals from qualified firms, teams, joint ventures (JV), or otherqualified business entities (“Proposers”) to submit a Qualifications Package for as-neededroutine maintenance services. Per California Public Contract Code Section 22002(d)maintenance includes routine, recurring, and usual work for the preservation or protectionof any publicly owned or publicly operated facility for its intended purposes.OneShoreline anticipates awarding up to three (3) As-Needed Agreements from thisSolicitation. The As-Needed Agreements will be multi-year and multiple-project as-neededroutine maintenance agreements. Actual routine maintenance services will be authorizedby OneShoreline through Contract Service Orders (CSOs). Each CSO shall include adescription of the service(s) needed, construction costs, required deliverables, andschedule of performance.Proposers with previous relevant experience and qualifications related to the Workdescribed in Section 4 Scope of Work, Schedule, and Budget are invited to submit aMinimum Qualifications Application (MQA) (Appendix B) and Qualifications Package(Appendix C) in accordance with the requirements set forth in this Solicitation, including theformat and content guidelines outlined in Section 2 Proposal Process and Requirements.This work will support operation and maintenance of multi-jurisdictional flood infrastructureserving communities that are vulnerable to flooding, conserving sensitive habitats, andprotecting critical infrastructure. Proposers shall demonstrate deep experience ininfrastructure management and adherence to strict environmental compliance.1.2. About OneShorelineGiven the extreme vulnerability to the water-related impacts of climate change in San MateoCounty, State legislation established OneShoreline in 2020 as the first independentgovernment agency to address the challenges of sea level rise, extreme storms, drought,coastal erosion, and other issues across jurisdictional boundaries. OneShoreline works witha wide range of stakeholders to build aligned resilience for developed and natural areas,and to plan land use and infrastructure for both immediate and future climate-drivenconditions. Resilience to this transformative challenge requires a holistic approach to:• Geography: OneShoreline is a vehicle through which San Mateo County and its citiescan align efforts across jurisdictions• Threats: OneShoreline focuses on climate change’s multiple water-related impacts• Objectives: OneShoreline reduces these threats and incorporates naturalinfrastructure, recreation, and public and private land into its efforts2II. Proposal Process and Requirements2.1. RFP ScheduleAdvertisement of RFP---------------------------------------------------------------------------- 1/14/2026Pre-Proposal Workshop ---------------------------------------------------------- 1/27/2026 at 3:00 PMDeadline for Proposers to Submit Questions --------------------------------- 2/4/2026 by 5:00 PMOneShoreline Posts Responses to Questions ------------------------------- 2/6/2026 by 5:00 PMDeadline for Proposers to Submit Proposals--------------------------- 2/18/2026 by 5:00 PMNotification of Selection ------------------------------------------------------------------------- 2/27/2026Deadline for Negotiation of Agreement ------------------------------------------------------ 3/17/2026OneShoreline Board Authorization to Execute Agreement ------------------------------ 3/23/20262.2. Pre-Proposal WorkshopOneShoreline encourages prospective Proposers to attend a virtual pre-proposal workshopto learn more about the project scope, site conditions, and proposal requirements. Duringthe session, staff will address questions and provide clarifications related to this RFSQ.• Date/Time: January 27, 2026 at 3:00 PMRegister here:https://oneshoreline-org.zoom.us/j/82327128183?pwd=Idbl6MN4lWxGvD5dXVnHbqx5U4o3XC.1Proposers are encouraged to independently visit the publicly accessible Colma Creekchannel and other publicly accessible visible infrastructure to inform their proposals.While oral responses may be provided during the workshop, only written addenda issued byOneShoreline shall be considered binding.2.3. Submission of QuestionsQuestions regarding this RFSQ must be submitted via email to:Projects@OneShoreline.orgSubject line: As-Needed Routine Maintenance RFSQResponses to all questions will be posted at: https://oneshoreline.org/document-library/32.4. Submission of ProposalsProposers must submit an electronic copy by the proposal deadline to:Johnathan Perisho, Project Manager at Projects@OneShoreline.orgProposals must be valid for a period of 120 days from the date of submission. Late orincomplete proposals will not be considered.2.5. Proposal RequirementsAll proposals must adhere to the following formatting and content requirements. Proposalsthat do not comply with these instructions may be deemed non-responsive and disqualifiedfrom further consideration.2.5.1. Format and Length• Maximum Length: 20 pages total, including all supporting materials except as notedbelow.• Font: Minimum 11-point for body text; 10-point minimum for graphics and tables.• Page Numbering: Number all pages clearly and sequentially. Do not number coverpages or section dividers2.5.2. Exclusions from the 20-page Limit• Cover (front and back)• Section dividers• Staff resumes (Maximum 2 pages per staff)• Required legal and contractual disclosures• Minimum qualifications2.5.3. Required ContentProposals must include the following sections, organized in the order listed below:• Cover Materials• Proposal cover including RFSQ title and number, prime firm name, and submissiondate• Signed cover letter from an individual authorized to contractually bind the proposer• Primary point of contact (name, title, phone number, and email address)2.5.4. Minimum Qualifications Application (MQA)Proposers must submit one completed and signed original of the MQA (Appendix B). IfProposer is a JV, Proposer must submit a separate MQA for each JV partner.4
- Commodity Codes
-
- NAICS 561730Landscaping Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Sole Source Teledyne Acoustic...
Follow Sole Source Teledyne Acoustic Doppler Current Profilers Repair Services Active Contract Opportunity
COMMERCE, DEPARTMENT OF
Bid Due: 7/13/2026
Water Truck Repair, Maintenan...
Project ID: 2026-Informal-0389 Title: Water Truck Repair, Maintenance, Fabrication, and Parts Addenda: 0
City of Pasadena
Bid Due: 7/13/2026