RFQ2510-03 Reception/Admin Area Modification (Due 01/30/2026)
Project Information
- Bid Title
- RFQ2510-03 Reception/Admin Area Modification (Due 01/30/2026)
- Issuing Agency
- Housing Authority of Fulton County
- Location
- Georgia
- Published Date
- Jan 9, 2026
- Closing Date
- Jan 30, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
The Housing Authority of Fulton County, Georgia (HAFC) is soliciting quotes from qualified contractors to provide interior renovation services for its main administrative office located at 4273 Wendell Drive SW, Atlanta, GA 30336. This procurement is being conducted in accordance with HUD Handbook 7460.8 REV 2 (Procurement Handbook for Public Housing Agencies), and all applicable federal, state, and local laws and regulations.
RFQ No.: RFQ2510-03
Due Date: 01/30/2026DOCUMENTATION:
- Attachment Preview
-
REQUEST FOR QUOTES (RFQ)RECEPTION/ADMIN AREA MODIFICATIONMAIN OFFICE LOCATIONRFQ No.: RFQ2510-03Re-Issue Date: January 9, 2026Submission Deadline: 5:00 PM (Eastern Time), Friday, January 30, 20261. INTRODUCTIONThe Housing Authority of Fulton County, Georgia (HAFC) is soliciting quotes fromqualified contractors to provide interior renovation services for its main administrativeoffice located at 4273 Wendell Drive SW, Atlanta, GA 30336. This procurement is beingconducted in accordance with HUD Handbook 7460.8 REV 2 (Procurement Handbookfor Public Housing Agencies), and all applicable federal, state, and local laws andregulations.2. PROJECT DESCRIPTIONThe project involves modifying the existing reception and administrative area to create asecure, enclosed reception space with direct visibility to the main lobby. Work willinclude wall construction, door installation, electrical/data relocation, painting, andfurniture relocation.Scope of Work• Wall Construction: Build 13.7’ × 8’10” wall with studs, gypsum board, insulation,paint, and install a minimum size of 36” × 36” security window.• Door Opening/Installation: Cut wall opening, install new 3’0” × 7’0” commercial-gradedoor with hardware.• Finishes: Paint newly constructed wall and enclosed area; restore disturbed areas.• General Requirements: Obtain permits, comply with all codes/ADA/fire-life safety,complete within 30 days of Notice to Proceed.To ensure thorough understanding, all prospective contractors are required to schedulea site visit to the project location; please contact Monica Baugh at mbaugh@hafc.org toschedule your specific time slot, as walk-ins will not be permitted, and this visit is crucialfor developing a complete and accurate proposal, addressing site conditions, logistics,and project specifics.3. CONTRACTOR QUALIFICATIONS• Contractor must be licensed and insured in the State of Georgia.• Contractor must not be debarred or suspended (SAM.gov verification required).• Davis-Bacon wage requirements apply (see attached wage determination).• Contractor shall provide photos of at least two similar interior renovation projectscompleted within the past three years.4. WORK SCHEDULEWork must be performed outside of normal business hours:• Monday – Thursday: 8:30 AM – 5:30 PM• Friday: 8:30 AM – 12:30 PMAlternative scheduling must be pre-approved by HAFC.5. SUBMISSION REQUIREMENTS• Itemized pricing for all labor, materials, permits, and related costs.• Proposed timeline and start date.• Proof of contractor license and insurance.• References and photos of similar completed projects.• Acknowledge receipt of- Davis-Bacon Wage Determination- HUD-4010 Federal Labor Standards Provisions (must be appended to everyconstruction/rehab contract)- HUD-5369-A Representations, Certifications, and Other Statements of Bidders- HUD Form 5370-EZ – General Conditions for Small Construction/DevelopmentContracts• If claiming Section 3 status, the following are critical for identifying and documentingemployment and contracting opportunities for low- or very low-income residents andbusinesses:- HUD-4736B Section 3 Worker Employer Certification PH- Section 3 Action Plan- Previous Section 3 Compliance Certification6. EVALUATION CRITERIAHAFC will award the contract to the responsible firm whose quote is most advantageous,considering price and other factors.Evaluation CriteriaWeightPrice40%Experience & Past Performance25%Capacity & Schedule20%Responsiveness/Completeness15%7. CONTRACT TYPE AND PERIODA firm fixed-price contract will be awarded. The contract period shall be 30 calendardays from Notice to Proceed.8. SUBMISSION INSTRUCTIONSQuotes must be submitted electronically by 5:00 PM (Eastern Time), Friday, January30, 2026.Email: rfp@hafc.orgSubject Line: “RFQ – Reception/Admin Area Modification”Late submissions will not be considered.9. ATTACHMENTS• Attachment A: Photos of Existing Lobby and Examples• Attachment B: Davis-Bacon Wage Determination – GA 3033610. CONTACT INFORMATIONAll inquiries concerning this RFQ must be submitted in writing by 5:00 PM (EasternTime) Monday, January 26, 2026, to:Monica BaughHousing Authority of Fulton CountyEmail: mbaugh@hafc.orgPhone: (404) 588-4950, ext. 7002HAFC reserves the right to reject any or all quotes, to waive informalities, and to award acontract deemed in the best interest of the Authority. Submission of a quote indicates thecontractor’s acceptance of all terms and conditions stated herein.ATTACHMENT A:Photos of Existing LobbyATTACHMENT B:Davis-Bacon Wage Determination – Fulton County, GA
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CSU_J-465-DP One Arsenal Plac...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-47200-RFQ-2026-000000142
State Government of Georgia
Bid Due: 7/16/2026
GSU - Chiller Replacement, Li...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) 50900-eRFQC-001795-2026
State Government of Georgia
Bid Due: 7/21/2026