RFP for Professional Eng. Svcs. for Rehab of the 15-inch Drain Line Project J-2150

Project Information

Bid Title
RFP for Professional Eng. Svcs. for Rehab of the 15-inch Drain Line Project J-2150
Issuing Agency
Santa Fe Irrigation District
Location
California
Published Date
Sep 16, 2026
Closing Date
Oct 14, 2026
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
Bid Title: RFP for Professional Eng. Svcs. for Rehab of the 15-inch Drain Line Project J-2150
Category: Capital Improvement Projects
Status: Open
Additional Status Information: See
Description:

REQUEST FOR PROPOSALS

PROFESSIONAL ENGINEERING SERVICES

FOR

Rehabilitation of The 15” Drain line Project

Risk Assessment Study

1 INTRODUCTION

1.1 Purpose


The Santa Fe Irrigation District (SFID) is seeking proposals from qualified Engineering Firms to provide Professional Engineering Servicesfor the Rehabilitation of the 15-Inch Drain Line Project (J-2150) - Risk Assessment Study (The Project).  SFID is a public agency existing and operating pursuant to the Irrigation District Law, California Water Code Section 20500 et seq. This Request for Proposals (RFP) describes The Project, the required scope of services, the consultant selection process, and the minimum information that must be included in the proposal. Failure to submit information in accordance with the RFP requirements and procedures may be cause for disqualification. SFID reserves the right to waive minor proposal deviations or omissions at its sole discretion.


The Engineering Firm (Consultant) shall perform the general tasks as described in the Scope of Work. SFID intends to select the most qualified Engineering Firm for the project. Proposals will be evaluated by SFID’s Screening and Selection Committee based on the following criteria:


  1. Project Understanding and Approach
  2. Scope of Work and Reasonableness of the Schedule of Services
  3. Qualifications of Key Personnel (team) and Relevant Experience
  4. Overall Clarity of Proposal/Compliance with the RFP
  5. Cost of Proposal


Please refer to Section 4 in the RFP for more detailed scope requirements.


Failure to submit information in accordance with this RFP's requirements and procedures may be cause for disqualification.


1.2 E-Notification Information

Notifications regarding amendments or other information regarding this RFP will be automatically distributed via firms who sign up through SFID’s website at Notify Me • Santa Fe Irrigation District, CA • CivicEngage (sfidwater.org) for Professional Engineering Services for the Rehabilitation of the 15-Inch Drain Line Project -Risk Assessment Study, at no cost. A link to the RFP can be found on the SFID website at www.sfidwater.org and selecting “Bids/Projects” at the top of the page. Select “Listing of Capital Improvements Projects” and the Professional Engineering Services for the Rehabilitation of the 15-Inch Drain Line Project -Risk Assessment Study . Please note that each consultant will be required to acknowledge receipt of Addenda in the proposal.


1.3 Due Date and Delivery


Electronic proposal shall be marked “Professional Engineering Services for the Rehabilitation of the 15-Inch Drain Line Project -Risk Assessment Study ”, and must be received via email to For security reasons, you must enable JavaScript to view this E-mail address. on or before:


Time: 2:00 p.m.

Date: Wednesday, October 14, 2026


Proposals received after this time will not be accepted. Faxed proposals will not be accepted.


1.4 Questions Concerning Proposals


Requests for interpretation, clarification and/or explanation regarding any aspect of this RFP must be received in writing, via email, by SFID no later than 12:00 P.M., Pacific Standard Time (PST), Wednesday, October 7, 2026. Questions must be sent to the attention of Hanna Dodd Gabin, Senior Civil Engineer, via e-mail to For security reasons, you must enable JavaScript to view this E-mail address.. Questions submitted via e-mail shall contain the following title in the Subject line Professional Engineering Services for the Rehabilitation of the 15-Inch Drain Line Project -Risk Assessment Study .

Questions will not be accepted by telephone. Any questions received after this date may not receive a response. Written responses to questions will be sent to all Proposers.


1.5 Pre-Proposal Meeting

A non-mandatory pre-proposal meeting will be held on Friday, October 2, 2026, at 1:30 pm at the R.E. Badger Water Filtration Plant located at 18535 Aliso Canyon Road, Rancho Santa Fe California, 92091. Attendance at the pre-proposal meeting not mandatory but is strongly recommended. The pre-proposal meeting WILL NOT BE held at the Santa Fe Irrigation District Office located at 5920 Linea Del Cielo, Rancho Santa Fe, 92067. Proposers are encouraged to attend.


Due to access restrictions along “Cross-Country” easement portions of the alignment, Proposers are NOT permitted to visit the site on their own. The only site visit will occur during the pre-proposal meeting.


1.6 Project Schedule


The Project shall be completed within approximately 16 weeks after notice to proceed. The solicitation, receipt and evaluation of proposals, selection of the provider of Consulting services, and the completion of the scope of work shall correspond to the tentative schedule shown in Table 1. Actual schedule dates are subject to change based on information presented in the selected Consultant’s proposal and subsequent discussions with the selected Consultant.


Table 1

Tentative Consultant Selection and Project Schedule

Release of RFP:

September 16, 2026

Pre-Proposal Meeting

(Attendance Strongly Encouraged)

October 2, 2026

Question Deadline:

October 7, 2026

Proposal Due Date:

October 14, 2026

Negotiations (if required):

October 21, 2026

Staff Selection of Apparent Successful Consultant

October 26, 2026

Recommend Contract Award to Water Resources Committee:

November 5, 2026

Recommend Contract Award to Board of Directors:

November 19, 2026

Notice To Proceed *

December 1, 2026

Project Kickoff Meeting

(In Person at REB Plant)

December 2, 2026

Submit Detailed Risk Assessment Study Outline and Work Plan

(Overview Meeting – Virtual)

December 16, 2026

Submit Draft 75% Complete

Risk Assessment Study

(In-Person Submittal Overview Meeting)

February 3, 2027

Receive Comments from District

(Comment Review Meeting- Virtual)

February 17, 2027

Submit Draft Final Risk Assessment Study

March 10, 2027

Receive Comments from District

(Comment Review Meeting – Virtual)

March 17, 2027

Submit Final Risk Assessment Study

March 24, 2027

* Pending SFID Board of Directors Approval

Publication Date/Time:
9/16/2026 7:00 AM
Closing Date/Time:
Open Until Contracted
Submittal Information:
See
Bid Opening Information:
October 14, 2026 @ 2:00 PM
Pre-bid Meeting:
October 2, 2026
Contact Person:
Hanna Dodd Gabin, Senior Civil Engineer
hdodd@sfidwater.org.
Download Available:
See
Plan & Spec Available:
See "Related Documents" tab
Business Hours:
8:00 a.m. - 3:00 p.m.
Plan Holders List:
See "Related Documents" tab
Qualifications:
See "Related Documents" tab
Miscellaneous:
See "Related Documents" tab
Related Documents:
Attachment Preview
To access this preview, please sign up here.
Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 237110Water and Sewer Line and Related Structures Construction
  • NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
  • NAICS 541330Engineering Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Replace bridge & culverts, HM...

Basic Information Title Replace bridge & culverts, HMA, RHMA, Mod lighting & erosion

State Government of California

Bid Due: 11/10/2026

IDIQ JOC TOTAL SMALL-BUSINESS...

Follow IDIQ JOC TOTAL SMALL-BUSINESS SET-ASIDE FOR ELECTRICAL AND OTHER WIRING INSTALLATION PROJECTS

DEPT OF DEFENSE

Bid Due: 10/28/2026