On-Call Sidewalk Construction RFIs & Answers
Project Information
- Bid Title
- On-Call Sidewalk Construction RFIs & Answers
- Issuing Agency
- Town of East Lyme
- Location
- Connecticut
- Published Date
- Feb 19, 2026
- Closing Date
- Feb 25, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- On-Call Sidewalk Construction RFIs & Answers (pdf)
- Attachment Preview
-
On-Call Sidewalk Construction RFIs & AnswersDate: 2/19/2026Question 1: Would the town consider for year 2 of the contract a 2 or 3 % escalationcharge?Not at this time.Question 2: Is there a bid bond or performance bond required?No.Question 3: Would there be any bonding requirements for work in CT DOT right of way?Not unless CTDOT requires it specifically. Generally, we submit the encroachmentpermits as the applicant which alleviates the bonding needs.Question 4: What size cast iron ADA plates will be used?Plates must be 2 feet in width, ramps are 4 feet wide minimum, typical is 2’x2’ platesplaced and cut as needed to meet Public Right-of-Way Accessibility Guidelines(PROWAG) standards.Question 5: Cast Iron ADA plates - straight or radius?Straight; if radius is required, that can be worked out with a difference in material cost.Question 6: Will wire mesh be installed in all concrete?See details, 5 inch concrete typically will not require mesh where 8 inch typically will.Question 7: Will a concrete sealant needed to be applied to all installed concrete?Sealant, moisture cure, etc. should be considered for a quality product. Minimumspecifications not detailed will follow CTDOT Form 819, or most current edition.Question 8: For concrete thru a residential driveway - will the bituminous concrete bepermanent or temporary?Bit. conc. asphalt repair is not part of this base contract, typically the Town will usedept. personnel or a separate contractor. If not, a unit price may be agreed uponseparately with the awarded sidewalk/concrete contractor.Question 9: Any sediment erosion controls needed for this bid?Sediment and erosion controls as well as traffic protection and work zone protectionshould be included (except flaggers).Question 10; What is the required installation of topsoil and seed and asphalt - 1 ft on eachside? How would long transitions be compensated for when grades have largeradjustments?This depends on the cut/disturbance needed; any effected areas should beloamed/seeded and restored as part of the base bid.Question 11: Will a certified payroll be neededNo, this contract is not intended to be used for projects over $100,000.Question 12: what is the annual budget for this bid - $ 100,000.00 - 200,000.00This varies, currently we are projecting our sidewalk capital budget to be $50,000annually but if more repairs are needed, we may use other funding sources.
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
DEEP Standardized Cold Storag...
DEEP Standardized Cold Storage Building at Thomaston Garage Construction of a two-story cold
State Government of Connecticut
Bid Due: 7/31/2026
Lake Road Sidewalk Extension Construct approximately 400 feet of 4 foot six wide
State Government of Connecticut
Bid Due: 7/07/2026