REQUEST FOR FORMAL WRITTEN PROPOSALS FOR TREE REMOVAL, STUMP GRINDING, AND DISPOSAL OF TREES/GRINDINGS OF CITY OF SAINT PETER RIGHTS-OF-WAY ASH TREES #4 (REVISED 2:30PM 3/3/2026)

Project Information

Bid Title
REQUEST FOR FORMAL WRITTEN PROPOSALS FOR TREE REMOVAL, STUMP GRINDING, AND DISPOSAL OF TREES/GRINDINGS OF CITY OF SAINT PETER RIGHTS-OF-WAY ASH TREES #4 (REVISED 2:30PM 3/3/2026)
Issuing Agency
St. Peter city
Location
Minnesota
Published Date
Mar 3, 2026
Closing Date
Mar 16, 2026
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description

REQUEST FOR FORMAL WRITTEN PROPOSALS FOR TREE REMOVAL, STUMP GRINDING, AND DISPOSAL OF TREES/GRINDINGS OF CITY OF SAINT PETER RIGHTS-OF-WAY ASH TREES #4 (REVISED 2:30PM 3/3/2026)

The City of Saint Peter, Department of Public Works, is requesting formal written proposals for tree removal, stump grinding, and disposal of trees/grindings of City rights-of-way Ash Trees.  The City reserves the right to reject any and all proposals, to waive defects in the proposal, and to accept the proposal that is in the best interest of the City.

Scope of Work:

  • All the work described below must be included in the total cost.
  • All fees, mobilization, or other charges shall be included in the unit price.  The city is tax-exempt. This request for proposal is funded by the Department of Natural Resources Community Tree planting grant and must comply with prevailing wage rules per Minnesota Statutes 177.41 through 177.50, as applicable.
  • Prior to commencement of work, the contractor shall be licensed as a commercial tree worker with the City of Saint Peter.
  • Proposals over $25,000 will need City Council approval before work can begin.
  • The contractor is responsible for traffic control and job site safety protection. Include all traffic and safety costs in the unit price. Traffic control is mandatory.
  • The contractor is responsible for tree removal and disposal of all tree debris (trees must be removed to no more than 12” above ground level).
  • The contractor may dispose of trees, and grindings, at the City’s compost site located in LeSueur County south of Saint Peter, or another Minnesota Department of Agriculture approved EAB disposal site (the site is locked/gated, pre-coordination is required).
  • The contractor is responsible for the grinding of the stump and maintaining street cleanliness.
  • The contractor will remove all grindings/debris from the site (the contractor must restore any areas disturbed outside the tree stump perimeter to pre-work conditions).
  • City staff will install black dirt and reseed the ground-stump area.
  • The contractor must complete GSOC locates for each job site as required.
  • Stumps and roots must be removed to a minimum of 12” below ground level unless otherwise noted, or approved, by City staff.
  • The contractor must grind any surface roots outside of the tree stump perimeter (until removed, not necessarily to the minimum 12” depth).
  • All trees are marked with a green ‘X4.’

Please submit a completed formal written proposal form OR provide a signed and dated formal written proposal on your company letterhead.

All work is to be completed between March 17, 2026 – April 30, 2026.

TREE REMOVAL, STUMP GRINDING, and DISPOSAL OF TREES/GRINDINGS PROPOSAL

Quantity DBH      Unit PriceTotal Cost

  1. Removal, Grinding, and Disposal of 26 Trees (15” DBH & under)  $                  $
  2. Removal, Grinding, and Disposal of 15 Trees (16”-20” DBH)          $                  $
  3. Removal, Grinding, and Disposal of 3 Trees (21” & above)              $                  $

Contractor Name: _________________________________________

Address: ______________________________________________

City: _____________________ State: ___________ Zip:

Authorized Representative:

Title:                                         Phone:                                     Email:

Signature                                                                                  Date:

Formal written proposals will be received until 10:00 A.M. on Monday, March 16, 2026 and should be sent to the City of Saint Peter, Department of Public Works, Attn: Andrew Bach, 405 W St. Julien Street, Saint Peter, MN 56082 or by e-mail to andrewb@saintpetermn.gov . Questions to be directed to the Maintenance Superintendent, Andrew Bach at 507-934-0670. AA/EOE

Commodity Codes
  • NAICS 561730Landscaping Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

2026-2027 ReLeaf Private & Pu...

Bid Title: 2026-2027 ReLeaf Private & Public Tree Removal, Stump Grinding & Tree

League of Minnesota Cities

Bid Due: 7/17/2026

Site Restoration - Prairie Bl...

Event# Event Name Type of Opportunity Format Type End Date HNCTY-NFB0000403 Site Restoration

Hennepin County

Bid Due: 7/07/2026