Pre-Qualification for Substation Contractors
Project Information
- Bid Title
- Pre-Qualification for Substation Contractors
- Issuing Agency
- SECO Energy
- Location
- Florida
- Published Date
- May 29, 2025
- Closing Date
- Jun 6, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 2025-41
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
The selected solicitation details are below. In order to view solicitation documents, you must register with VendorLink.
Agency SECO Energy Status Active Fiscal Year 2025 Primary Contact Karen Bennett Secondary Contact Substation Engineering Bid Tertiary Contact Purchasing and Contracting SECO Energy Title Pre-Qualification for Substation Contractors Number 2025-41 Type Request for Qualifications Online Quote/Bid Yes Department Purchasing Piggyback Solicitation No Insurance Required No Bid Bond Required No Bid Bond Amount Performance Bond Required No Performance Bond Amount Scope of Services SECO Energy is seeking qualified contractors to bid on substation construction projects. See attached bidder qualification specifications.
Introduction: Sumter Electric Cooperative, also known as SECO Energy, is a not-for-profit, member-owned electric utility. With over 250K active accounts (90/10 residential/commercial split), SECO Energy is the third largest electric cooperative in Florida and the seventh largest in the entire United States. The service territory area is approximately 2,000 square miles. SECO maintains a sophisticated electrical network with a maximum operating voltage of 25 KV. This system includes 48 substations comprised of over 198 feeders. SECO Energy is a very customer-focused utility which has high expectations for all its various contracted services.
Additional information on SECO Energy can be found on its website at www.secoenergy.com.
***NOTE***
All questions and proposals must be submitted on VendorLink. PLEASE NO PHONE CALLS OR EMAILS.
The following requirements must be met, in order to submit your bid on VendorLink:
Must upload your proposal, choosing `Proposal` as your file type
Broadcast Date 5/7/2025 7:00 PM Question End Date 6/4/2025 5:00 PM Due Date 6/6/2025 2:00 PM Anticipated Award Date *PDF files require Adobe Reader to view.
Preconference(s) Total: 0
Date Time Mandatory Location
Documents Total: 2
Type Name Description File Type Request for Qualifications Substation Construction Qualification.docx Substation Construction Qualifications Word All Solicitation Types SECO - PO Terms and Conditions for RUS Goods Acquisition - revApril2022.pdf RUS T&Cs for Purchase Order PDF
Quote/Bid Items Total: 0Commodity Codes Total: 21
# Required Group Make Model Description Quantity Unit of Measure Price/ Percent Type Delivery Date None Include Shipping in
Price of ItemsNo Shipping None Terms and Conditions See SECO Energy`s Terms and Conditions Files to Request None Display Bid Tabulation to Vendors Display Vendor Submissions to Vendors View Vendor Submissions while Bid Solicitation is Active
Code Description [280-58] High Voltage Cables and Wires (601-15,000V), Solid and Stranded, Single and Multiconductor [725-42] Poles, Metal, Transmission, High Voltage (EFFECTIVE 3-1-07 THIS CLASS-ITEM INACTIVATED FOR NEW USE, REFER TO 839-60) [839-60] Poles, High Voltage Transmission [936-77] Substation/High Voltage (Electrical) Maintenance and Repair [936-87] Transformer (High Voltage) Maintenance and Repair [936-77] Substation/High Voltage (Electrical) Maintenance and Repair [936-87] Transformer (High Voltage) Maintenance and Repair [450-62] Pads, Equipment Foundation, All Types (Including Recycled Type) [913-48] Construction, Special Foundation [912-21] Construction, Energy Related (All Types) [914-38] Electrical [914-84] Trade Services, Construction (Not Otherwise Classified) [914-79] Structural and Reinforcement Steel [914-85] Welding [909-76] Site Work (Incl. Site Clean-Up) [912-16] Boring, Drilling, Testing, and Soundings [912-23] Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.) [912-30] Construction, Power Plant [912-40] Demolition Services [912-44] Excavation Services [285-87] Transformers, Power, Electric Sub-Station
Publications Total: 0
Publication Date
Questions Total: 7
Question Date Asked Answer Date Answered Is this bid applicable to tubular steel pole manufacturers? For example, for tall steel structures like H-Frames and static masts? 5/8/2025 12:23:17 PM No, we are not asking for any corrosion control. This proposal is seeking qualified substation construction contractors to bid on our projects. See requirements under Documents. 5/9/2025 12:42:52 PM Does the scope of services you require for Pre-Qualification for Substation Contractors, include Corrosion Control? 5/8/2025 1:05:22 PM 2. No, this is not a material bid, but a construction bid. This proposal is seeking qualified substation construction contractors to bid on our projects. See requirements under Documents. 5/9/2025 12:43:50 PM What is the average expected length per job for these rates? 5/16/2025 1:58:03 PM The requested labor and equipment rates will be used solely for evaluation purposes as part of this prequalification. While a service agreement is not anticipated at this time, the submitted rates may be referenced should such an agreement be considered in 5/29/2025 2:00:15 PM Will the contractor be responsible for the testing and commissioning scope on substation projects, or will SECO handle with support from the contractor? 5/22/2025 10:45:16 AM Contractor is not responsible for testing and commissioning of any equipment or relays. Contractor is responsible for pulling and terminating interconnects per drawings and conduit/cable schedule 5/22/2025 2:36:53 PM Do SECO`s substation projects typically include fiber splicing and testing? If so, would this scope be the contractor`s responsibility? 5/22/2025 10:46:30 AM Contractor is not responsible for splicing or testing fiber. SECO will splice and test all fiber. Contractor may be required to pull fiber based on the conduit and cable schedules. 5/22/2025 2:36:30 PM The pre-qualification form is requesting labor rates for emergency and non-emergency storm rates, as well as equipment rates. Would you please clarify how requested rates will be utilized? Are the rates intended for a service agreement, and if so, what would be the duration of the agreement? Thank you. 5/28/2025 3:49:07 PM This solicitation is part of SECO’s Substation Contractor Qualification process, intended to identify and approve Substation Construction Contractors eligible to participate in future closed-bid construction opportunities. The requested labor and equipment rates will be used solely for evaluation purposes as part of this prequalification. While a service agreement is not anticipated at this time, the submitted rates may be referenced should such an agreement be considered in the future 5/29/2025 1:59:31 PM Would SECO consider extending the bid event by a couple days? 5/29/2025 3:01:38 PM Yes. Extended until June 6, 2025 5/29/2025 4:40:18 PM
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237130Power and Communication Line and Related Structures Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Pasadena Lakes - Cul de Sac M...
Project ID: PSEN-2026-QQ-01 Title: Pasadena Lakes - Cul de Sac Modification Addenda: 0
City of Pembroke Pines
Bid Due: 7/20/2026
LEGACY LANDING CRAFT AIR CUSH...
Follow LEGACY LANDING CRAFT AIR CUSHION (LCAC) AND LCAC100 CLASS MAINTENANCE AND REPAIR
DEPT OF DEFENSE
Bid Due: 7/31/2026