2026 North Valley Full Depth Repair and Culvert Project
Project Information
- Bid Title
- 2026 North Valley Full Depth Repair and Culvert Project
- Issuing Agency
- Yamhill County
- Location
- Oregon
- Published Date
- Jan 26, 2026
- Closing Date
- Feb 10, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: 2026 North Valley Full Depth Repair and Culvert Project
Category: Invitation To Bid (ITB) Status: Open Description: The project work will consist of a 12-day closure of North Valley Road between Ribbon Ridge and Albertson Road, Full Depth Repairs (FDR) in four separate areas, two culvert replacements, and construction of 7 embankment turn outs along the closed portion of the road. Closure to include detour signage and two PCMS reader boards. The FDR work will include 32” of excavation, estimated to be 1,440’ x 12’. The existing pavement is 10”-11” thick. A geotechnical report is available. The pavement is to be removed by Cold Planning and to be placed as subbase. The turn outs will be constructed with the FDR excavation spoils. The upper 12” of the turn outs will be constructed out of salvaged or imported grindings. Approximately 1000 cys of stockpiled grindings owned by Yamhill County will be required to be trucked to the jobsite. Stockpile location is at the Baker Creek Rd. and N. Hill Rd. yard just outside McMinnville. Paving of FDR work will require 4 inches of Level II AC. A Summer 2026 Pre-level and Overlay project from Ribbon Ridge to Albertson Road will follow this work but will not be included in this project. The 48” x 44’ culvert, 8’ deep requires completion during In Water Work Window (IWWW). Oregon Dept. of Fish and Wildlife (ODFW) has stated that the 48” pipe replacement may be installed early than the IWWW if no flows are present in the tributary of Chehalem Creek. It is typical that flows stop by end of June. The second pipe replacement is an 18” x 50’ culvert near the 48” pipe replacement. These two pipes also require 4” of trench patching. All contract work is to be completed by July 10th, 2026.
Electronic bid package may be obtained from the Yamhill County Department of Public Works, NE 2060 Lafayette Avenue, McMinnville, Oregon 97128. Telephone - (503) 434-7515 or Email For security reasons, you must enable JavaScript to view this E-mail address. .
Bids shall be mailed or delivered to Greg Haffner, Yamhill County Engineering Manager at the above address, no later than February 10th, 2026, at 2:00 p.m. at which time they will be publicly opened and read at the same location. Bids may not be submitted by facsimile or electronic means.
Publication Date/Time: 1/23/2026 12:00 AM Closing Date/Time: Open Until Contracted Bid Opening Information: 02/10/2026 @ 2pm Related Documents: - Attachment Preview
-
Yamhill County, OregonInvitation to Bid2026 North Valley RoadFull Depth Repair & Culvert Replacement ProjectAdvertise:January 23rd, 2026Pre-Bid Conference:Not RequiredRefer all questions to:Greg HaffnerEngineering Manager503-434-7365Haffnerg@Yamhillcounty.govBIDS DUE:February 10, 2026by2 PMat2060 NE Lafayette Ave, McMinnville, Or. 97128ITB No. PW26-001Page 2SECTION A – TABLE OF CONTENTSA. TABLE OF CONTENTS .............................................................................................................. 2B. GENERAL BIDDING INFORMATION ......................................................................................... 3B.1 Project Identification ..................................................................................................... 3B.2 Anticipated Schedule .................................................................................................... 3B.3 Pre-Bid Conference ...................................................................................................... 3B.4 ITB Availability and Addenda........................................................................................ 3B.5 Solicitation Law, Rules and Statutes ............................................................................ 4C. OFFER SUBMITTAL ................................................................................................................... 4C.1 Price Submittal Form .................................................................................................... 4C.2 Signature Required....................................................................................................... 4C.3 Sealed Envelope; Address and Cover Information ...................................................... 4C.4 First Tier Disclosure Form ............................................................................................ 4C.5 Bid Security .................................................................................................................. 4C.6 Offer Withdrawal Prior to Closing ................................................................................. 5C.7 Forms Required............................................................................................................ 5D. OREGON PREVAILING WAGE RATES (BOLI) ......................................................................... 5E. CLOSING AND OPENING OF BIDS ........................................................................................... 5E.1 Bid Closing.................................................................................................................... 5E.2 Bid Opening .................................................................................................................. 5F. BID/OFFER EVALUATION .......................................................................................................... 5F.1 Right to Reject .............................................................................................................. 5F.2 Time for Offer Acceptance ............................................................................................ 5F.3 Evaluation Criteria......................................................................................................... 6F.4 Special Price Evaluation Factors .................................................................................. 6G. CONTRACT AWARD .................................................................................................................. 6G.1 Method of Bid Award .................................................................................................... 6G.2 Intent-to-Award Announcement ................................................................................... 6H. PROTEST PROCEDURES ......................................................................................................... 6H.1 Solicitation Protests ...................................................................................................... 6H.2 Contract Award Protests .............................................................................................. 6I. INFORMATION TO BE SUBMITTED BY THE APPARENT SUCCESSFUL OFFEROR ............ 7I.1 Insurance ....................................................................................................................... 7I.2 Performance and Payment Bonds ................................................................................. 7I.3 Commencement of Work ............................................................................................... 7J. CONTRACTUAL PROVISIONS ................................................................................................... 7J.1 Compliance with State & Federal Law .......................................................................... 7J.2 Venue, Governing law, and Attorney Fees ................................................................... 8J.3 Insurance....................................................................................................................... 8J.4 Independent Contractor ................................................................................................ 8J.5 Indemnification .............................................................................................................. 9J.6 Assignment or Transfer Restricted................................................................................ 9J.7 Termination Rights ........................................................................................................ 9J.8 Records Maintenance; Access.................................................................................... 10J.9 Foreign Contractor ...................................................................................................... 10EXHIBITSExhibit A: Pricing Submittal FormExhibit B: First Tier Disclosure FormExhibit C: Certifications & Acknowledgment FormExhibit D: Offeror Signature FormExhibit E: Sample ContractExhibit F: Bond FormsExhibit G: Special Provisions and Standard SpecificationsExhibit H: Design PlansExhibit I: In-Water-Work-Permit for ODFWExhibit J: Geotechnical ReportPW26001CON0Last updated Jan. 22, 2026ITB No. PW26-001Page 3SECTION B – GENERAL BIDDING INFORMATIONYamhill County (County) invites qualified contractors to respond to the following Invitation to Bid (ITB) for Yamhill County2025 Overlay Project.B.1 Project Identification. This Project, titled “2026 North Valley Road Full Depth Repairs & CulvertReplacement Project". consists of a 12-day closure of North Valley Road (NV) between Ribbon Ridge andAlbertson Road, Full Depth Repairs (FDR) in four separate areas, two culvert replacements, and Bid Alternatework to construct 7 embankment turn outs along the closed portion of the road. Closure includes detour signage,two PCMS reader boards, and temporary closure signs. The FDR work will include cold planning & excavation,estimated to be 1,783 cys. The existing pavement is 10”-11” thick. A geotechnical report is available. Thepavement is to be removed by Cold Planning and to be placed as 12” subbase in FDR. The turnouts will beconstructed with the FDR excavation spoils if awarded. If the Turn outs are not awarded, spoils below existing ACwill need to be hauled off site. A no cost disposal site is noted on the plans. The upper 12” of the turnouts will beconstructed out of imported grindings owned by Yamhill County located at the Baker Creek Rd./N. Hill Rd. yardjust outside McMinnville. Paving FDR work will require 4 inches of Level III AC. A Summer 2026 Pre-level andOverlay project from Ribbon Ridge to Albertson Road will follow this work but will not be included in this project.The 48” x 44’ culvert, 8’ deep, requires completion during In the Water Work Window (IWWW). Oregon Dept. ofFish and Wildlife (ODFW) has stated that the 48” pipe replacement may be installed early than the IWWW if noflows are present in the tributary of Chehalem Creek. It is typical that flows stop by end of June. The second pipereplacement is an 18” x 50’ culvert. These two pipes also require 4” of trench patching.B.2 Anticipated Schedule:CALL FOR BIDS ADVERTISEDQUESTIONS DUECLARIFICATIONS/ADDENDAJanuary 23, 2026February 4th, 2026February 6th, 2026BID SUBMITTAL DUENOTICE OF INTENT TO AWARDDEADLINE TO SUBMIT WRITTEN PROTESTFebruary 10th, 2026February 19th, 2026February 26th, 2026CONTRACT AWARD (TENTATIVE)March 5th, 2026CONTRACT SIGNED (TENTATIVE)March 12th, 2026START DATE NOT BEFOREJune 1st, 2026 ***COMPLETION DATEJuly 18th, 2026******** Start will be contingent on In-water-work-window (IWWW) for 48” Culvert if contractor chooses to complete Pipeand FDR work during the same 12 calendar day road closure.***** Completion date may be adjusted if IWWW for 48” pipe is delayed due to wet spring.B.3 Pre-Bid Conference.There is no pre-bid conference for this project.B.4 ITB Availability and AddendaB.4.1 ITB Public Viewing. This Invitation to Bid (“ITB”), including all Exhibits and Addenda, are available at 2060 NELafayette Ave, McMinnville and will not be mailed to prospective Offerors unless requested pursuant to Section B.4.3.PW26001CON0Last updated Jan. 22, 2026ITB No. PW26-001Page 4B.4.2 Point of Contact. The single contact point for questions regarding the ITB, forms, Specifications, Plans, biddingprocess, change, clarification, the award process, protests and any other issues that may arise, is Greg Haffner at (503-434-7365) fax (503-472-4068) and e-mail Haffnerg@Yamhillcounty.gov.B.4.3 Hard Copy Document Fees & Delivery. Offerors may also request hardcopies of the ITB, Addenda, and mostattachments from the Point of Contact listed in Section B.4.2. All costs for these documents and any associated deliveryfees are at Offeror’s expense.B.4.4 Addenda. Any amendments to the original solicitation will be issued as an Addendum and will be available forviewing at the location provided in Section B.4.1. Offerors may request automatic notifications of any subsequentAddenda to the ITB through the Point of Contact listed in Section B.4.2. Except to the extent required by public interest,County shall not issue an Addenda less than 72 hours before the closing date and time unless the Addenda also extendsthe closing date and time.B.4.5 Clarifications, Objections, and Questions. Any Offeror that finds discrepancies in, or omissions from any provision ofthe ITB, Plans, or Specifications, or has doubt as to the meaning, shall make a request for clarification or modification inwriting, to the contact point listed in Section B.4.2. To be considered, the request for clarification or modification must bereceived by the County at least ten (10) prior to the bid closing. Clarifications, whether verbal or in writing, do not changethe Plans, Specifications, contractual terms, or procurement requirements of this ITB unless a formal ITB Addendum hasbeen issued by the County.B.5 Solicitation Law, Rules and Statutes. This ITB and the resulting contract are governed by Oregon Law and YamhillCounty Code. Specific laws and rules that govern the solicitation process are found in Chapters 279A and 279C of theOregon Revised Statues, and Divisions 246 and 249 of the Administrative Rules of the Oregon Department ofAdministrative Services, and the Yamhill County Code, Volume 3, Subtitle 2, Public Contracting Rules and Regulations.The ITB and resulting contract may be subject to other laws and rules. Offerors should obtain and become acquaintedwith the applicable provisions of the above laws and rules. Copies may be obtained as follows:B.6 Prequalification Requirements. The County requires all Offerors to be prequalified with the Oregon Department ofTransportation (ODOT) in the following Classes of Work:ACP – Asphalt Concrete Paving and Oiling, TTC- Temporary Traffic ControlThe County will only consider an Offer from an Offeror who submits the following with their Offer:1) A copy of its ODOT Prequalification Approval Letter; or2) Documentation that the Offeror submitted a complete prequalification application at least seven (7) days priorto the Bid Opening, and then, no later than fourteen (14) days following Bid Opening, submits to the County acopy of the applicable ODOT Prequalification Letter.The ODOT prequalification application, along with approval time frames, procedures, and additional information on theprequalification process is available at: https://www.oregon.gov/ODOT/Business/Procurement/Pages/Bid_Award.aspxB.7 Specialized Licensing Required. “This ITB has no specialized licensing requirements.”SECTION C – OFFER SUBMITTALC.1 Price Submittal Form. Offerors shall enter pricing and other required information for all bid items listed in Exhibit A,Price Submittal Form. If the Price Submittal Form is replaced via an Addendum, Offerors shall use the amended form toprovide pricing and other required information. Failure to supply the required information in the Pricing Submittal Form orsubsequent Addenda, if any, may result in bid rejection as non-responsive.C.2 Signature Required. OFFER SUBMITTED BY OFFEROR MUST BEAR AN ORIGINAL SIGNATURE. FAILURE TOSUBMIT AN OFFER BEARING AN ORIGINAL SIGNATURE WILL RESULT IN REJECTION OF THE BID.C.3 Sealed Envelope; Address and Cover Information. Offers shall be submitted in sealed packages or envelopes. Toensure proper identification and handling, all packages and envelopes shall be clearly marked as follows:ITB NumberClosing Date & Time2060 NE Lafayette Ave, McMinnville OR 97128PW26001CON0Last updated Jan. 22, 2026ITB No. PW26-001Page 5C.4 First Tier Subcontractor Disclosure Form. The First Tier Subcontractor Disclosure Form must be submitted eitherwith the bid submission or within two (2) working hours after the closing. Failure to comply with this requirement shallresult in rejection of the offer as non-responsive. Additional information can be found within Exhibit B, First TierSubcontractor Disclosure Form.C.5 Bid Security Required. Each offer must be accompanied by a certified or cashier's check, irrevocable letter of creditissued by an insured institution as defined in ORS 706.008, or Bid Bond payable to Yamhill County in an amount equal toten percent (10%) of the total amount of the Offer. The bid security shall be furnished as security against the failure of theOfferor to comply with all requirements within the time frames established subsequent to notification of intent to award. Ifthe Offeror fails to (1) execute the contract, (2) furnish a Performance Bond and a Payment Bond, or (3) furnishcertificates of insurance within the time specified in the written notification of intent to award a contract, the County maycash the check, draw under the letter of credit, or otherwise collect under the bid security.C.6 Offer Withdrawal Prior to Closing. Offers may be withdrawn in writing when submitted on Offeror's letterhead,signed by an authorized representative, and received by the County prior to closing. Offer withdrawals submitted in writingmust be labeled as such and contain the ITB number. Offers may also be withdrawn in person before closing uponpresentation of appropriate identification and evidence of authorization to act for Offeror. Signature confirmation ofwithdrawal may also be required. Offerors may not modify offers after closing.C.7 Forms Required. The following forms must be submitted prior to closing:• Price Submittal Form, Exhibit A• First Tier Disclosure Form, Exhibit B• Certifications & Acknowledgement Form, Exhibit C• Offeror Signature Form, Exhibit D• Prequalification DocumentationSECTION D – OREGON PREVAILING WAGE RATES (BOLI)D.1 The contractor and all subcontractors shall comply with the provisions of ORS 279C.800 through 279C.870 relative toPrevailing Wage Rates. No Offer shall be received or considered by the County unless the Offeror agrees to be bound byand comply with the provisions of 279C.838, 279C.840 (or 40 U.S.C. 3141 to 3148 where applicable.) Before startingwork the contractor shall file with the Construction Contractors Board, and maintain in full force and effect, the separatepublic works bond required by ORS 279C.836 and OAR 839-025-0015, unless otherwise exempt under those provisions.The contractor shall also include in every subcontract a provision requiring the subcontractor to have a public works bondfiled with the Construction Contractors Board before starting work, unless otherwise exempt, and shall verify that theSubcontractor has filed a public works bond before permitting the Subcontractor to start work.D.2 This ITB and the resulting contract are subject to the following Bureau of Labor and Industries (BOLI) wagerequirements and the prevailing wages rates set forth in the following booklet, as amended, which is incorporated hereinby reference with the same force and effect as though fully set forth herein, and is available at the following web link:Prevailing Wage Rates for Public Works Contracts in Oregon issued January 5th, 2025.Prevailing Wage Rates Apprenticeship Rates issued January 5th, 2025.These BOLI wage rates are available on line at:http://egov.oregon.gov/BOLI/WHD/PWR/pwr_book.shtmlD.3 The work will take place in Yamhill County, on 5 county roads.SECTION E – CLOSING AND OPENING OF BIDSE.1 Bid Closing. Bids must be received, and date/time stamped at 2060 NE Lafayette Ave, McMinnville Or Public Worksby the closing date/time. Bids will not be accepted after the closing date/time as stated on page one (1) of this ITB, or asmay be extended by any subsequently issued Addenda. Facsimile offers will not be allowed or accepted. Failure tocomply with this requirement will result in rejection of the offer as non-responsive.PW26001CON0Last updated Jan. 22, 2026
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
NE 1 st, 2 nd, Fogarty, and G...
Bid Solicitation # S-KN0010-00017300 Bid Solicitation # S-KN0010-00017300 Organization Name City of Newport
State Government of Oregon
Bid Due: 7/09/2026
RESERVE CONTRACT FOR CONSTRUC...
Description Oregon State University ("OSU" and/or "Owner") is seeking Offers ("Offers") from qualified
Oregon State University
Bid Due: 8/30/2030