Plans and Specs 6242-87 TH280 Broadway St. and Hennepin Ave.
Project Information
- Bid Title
- Plans and Specs 6242-87 TH280 Broadway St. and Hennepin Ave.
- Issuing Agency
- State Government of Minnesota
- Location
- Minnesota
- Published Date
- Feb 24, 2026
- Closing Date
- Mar 10, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Plans and Specs 6242-87 TH280 Broadway St. and Hennepin Ave.
Brief Description: MnDOT requests letters of interest to prepare final road plans, specifications, cost estimates, a stormwater management plan, and all related documents and agreements for: Trunk Highway (TH) 280: From Wabash Avenue (Ave.) in St. Paul to just north of Broadway Street (St.). Hennepin Avenue: (Hennepin Reconstruction) From the 33rd Ave. intersection to 300 feet west of Industrial Boulevard (Blvd.), in coordination with Hennepin County. The final plan will also incorporate five bridge preservation plans developed by the MnDOT Bridge Office for bridge numbers 9471, 9472, 62033, 62034, and 62843 and accommodating Minnesota Commercial Railway Crossing plans at Hennepin Ave. and Industrial Blvd. and a drainage repair on Energy Park Drive.
Date posted: 02/24/2026
Due date: 03/10/2026- Announcement
- Scope of Work
- TGB/VET Special Provisions
-
Official List
: In order to submit a letter of interest to this project, consultants must be pre-qualified in the following work types:
- 2.11 Highway Design - Level 1
- 14.1 Traffic Signal Design
- 14.2 Traffic Signal Operations
- 14.3 Roadway Lighting Design
- 14.42 Temporary Traffic Control Plan Design & Special Provisions - Level 2
- 14.62 Signing Plan Desing & Special Provisions - Level 2
- Attachment Preview
-
MnDOT Contract No. 1062357Exhibit C: Specifications, Duties, and Scope of WorkTable of Contents1. Project Overview .................................................................................................................................. 22. Project Management............................................................................................................................ 73. MnDOT Roadway Design Plans and Division S Special Provisions ....................................................... 94. Construction Limits ............................................................................................................................ 125. Hydraulic Design Stormwater Design and Permitting and Stormwater Management Plan andPreliminary Drainage Plan........................................................................................................................... 136. ADA Design ......................................................................................................................................... 157. Signing Plan ........................................................................................................................................ 168. Pavement Marking Plan ..................................................................................................................... 189. Signal Plan .......................................................................................................................................... 2010. Lighting Plan................................................................................................................................... 2311. Retaining Wall Design .................................................................................................................... 2612. Environmental Management Plan (EMP) - State ........................................................................... 2813. Transportation Management Plan (TMP) - State........................................................................... 2814. Traffic Control/Staging Plan ........................................................................................................... 2915. Project Turn-In - State ................................................................................................................... 3116. Utility Coordination........................................................................................................................ 3317. Understandings:............................................................................................................................. 351MnDOT Contract No. 1062357Exhibit C: Specifications, Duties, and Scope of Work1. Project Overview1.1. General Statement of Scope of WorkThe objective of this contract is to prepare final road plans, specifications, cost estimates, a stormwatermanagement plan, and all related documents and agreements for State Project (SP) 6242-87, whoseproject limits are:a. Trunk Highway (TH) 280: From Wabash Avenue (Ave.) in St. Paul to just north of Broadway St.b. Hennepin Ave.: (Hennepin Reconstruction) From the 33rd Ave. intersection to 300 feet west ofIndustrial Boulevard, in coordination with Hennepin County.The final plan will also incorporate five bridge preservation plans developed by State Bridge Office forbridge numbers 9471, 9472, 62033, 62034, and 62843 and accommodating Minnesota CommercialRailway Crossing plans at Hennepin Ave and Industrial Boulevard (Blvd.). A drainage repair on EnergyPark Drive is included.1.1.1. The scope of work includes design services for development of a State biddable final plan andspecifications for the TH 280 Project and reconstruction of Hennepin Ave. (Hennepin Ave.Reconstruction) which includes, but is not limited to, the following: Roadway design, curb ramps,sidewalks and trails in compliance with the Americans with Disabilities Act (ADA) for sidewalks and trails,Drainage design including stormwater management planning and design, Design of guardrail and barriersystems, Traffic signal removal at the intersection of TH 280 and Broadway Street (St.) Northeast (NE),Traffic signal removal and replacement at Hennepin Ave. and Industrial Blvd. which includes signalinterconnect for Minnesota Commercial Railway crossing, Traffic Management Plan (TMP)(communication planning not included), Traffic Control Plans and Preliminary Staging, Pedestriancrossing design, Geotechnical design (geotechnical exploration is an optional project task to be includedby amendment), Traffic control planning and staging, Signage and roadway lighting design, and utilitynotification and coordination.1.1.2. The scope of work includes coordination of design activities with State, Hennepin County, theCity of Minneapolis and Minneapolis Park and Recreational Board (MPRB) and others as appropriate tosuccessfully deliver the final plans and specifications.1.1.3. It is expected Contractor will lead the development of the plans and specifications for thisproject to Minnesota Department of Transportation (MnDOT) standards and State-Aid standards,Computer-Aided Design and Drafting (CADD) Standards, MnDOT specifications and where appropriate,City of Minneapolis and Hennepin County Standards, and MnDOT’s MS4 permit requirements.1.2. Project Background1.2.1. In summer 2026, TH 280 will be closed for a pavement rehabilitation project SP 6242-83. Finalplans and specifications for this project are available to the public in States Electronic DocumentManagement System, EDOCS. The plans include drainage features which were in preparation for theremoval of the signal at TH 280 and Broadway St. NE.1.2.2. In 2028, the MPRB will be construct the “Grand Rounds Missing Link Concept” after State hascompleted the Industrial Blvd. and Hennepin Ave. project. Visit the MPRB website for more informationand a concept design. The MPRB project will omit Grand Rounds Missing Link Concept construction atthe intersection of Hennepin Ave. and Industrial Blvd., this portion will be built in 2028 with SP 6242-87.1.2.3. The primary goal of SP 6242-87 is to remove the traffic signal and close the left turn fromnorthbound TH 280 to Broadway St. to improve safety. Because of removing the signal, more traffic,including a significant amount of truck traffic, will be re-routed via Hennepin Ave. and Industrial Blvd.2MnDOT Contract No. 1062357Exhibit C: Specifications, Duties, and Scope of WorkHowever, a large semi-truck cannot successfully navigate that intersection today, so State will fundintersection improvements to allow better truck turns. At Hennepin County’s request, we are alsoincluding the reconstruction of Hennepin Ave. between Industrial Blvd. and 33rd, to be paid for by othersin accordance with Hennepin County cost participation policy.1.2.4. For the signal removal at TH 280 and Broadway St. NE, WSB Engineering Inc. led thedevelopment of a preliminary design for roadway resurfacing, reconstructed driveways, curb and gutterdesign, this includes the Hennepin Reconstruction including new trails, a segment of the Grand RoundsMissing Link Concept trail network for MPRB. For Hennepin Ave. Reconstruction of a multimodalimprovement on Broadway St. NE and Hennepin Reconstruction.1.2.5. The Preliminary roadway layouts and cost estimates can be found can be found https://edocs-public.dot.state.mn.us/edocs_public/DMResultSet/Urlsearch?columns=docnumber,docname&folderid=39011127.Planned approval by State Metro District Layout approval committee in January 2026. The layouts havebeen presented to the City of Minneapolis Citizen Participation Task Force (CPTF), Hennepin CountyAlcohol, Tobacco, Firearms and Explosives (ATF), Minneapolis Bicycle Advisory Committee(BAC)/Pedestrian Advisory Committee (PAC) and comments have been resolved.1.2.6. The drainage preliminary design for Broadway St. NE has been scoped; and the drainagedesign for Hennepin Ave. has been scoped for full replacement. However, stormwater managementplanning and preliminary and final drainage design is required to be completed as part of this scope ofservices. The project is to develop a Stormwater Management Plan which addresses Rice CreekWatershed Requirements, State MS4 Permit Requirements, Hennepin County MS4 Permit Requirementsand explore applicable Upper Mississippi River Watershed Management Organization which State doesnot adhere to but attempts to comply.1.2.7. Contractor will develop a biddable construction plan set which encompasses the regiondescribed in 1.1.1 and tie down as necessary to City of Minneapolis and Hennepin County roads theproject intersects. The project will be turned in for final delivery on May 1, 2027, to be let for delivery onOctober 27, 2027. The plans are to incorporate and include bridge plans developed by State BridgeOffice and Time and Traffic Specifications developed by State Metro Resident Engineers Office.1.2.8. The services to be provided by the Contractor for the project includes the development of thefinal plans and specifications within the project limits for:a. Pavement reconstruction for Hennepin Reconstruction which includes the complete removal andreplacement of the pavement structure and narrowing the road from four lanes to three lanes.County will review, confirm and approve pavement design proposed by others/Contractor basedon Geotech data collected and calculated by others/Contractor (R-value, soil classification, trafficdata, ESALs - basically, an Material Design Recommendations (MDR).b. Pavement reconstruction of Broadway St. NE using a mill and overlay, A MDR is being developedfor the roadway by Metro Districts Materials Office and will be provided to implement in thedesign.c. Removal and replacement of curb and gutter within the project limits.d. Removal and replacement of sidewalk and trails and pedestrian ramps to be compliant with ADA;add curb extensions from side streets and provide widened boulevard space between street andsidewalks. Landscaping, other than necessary green infrastructure will not be included in this plan.e. Removal and replacement of deficient catch basins and storm sewer structures in the corridor andprovide catch basins to meet State Roadway design spread conditions and Hennepin CountySpread criteria.3MnDOT Contract No. 1062357Exhibit C: Specifications, Duties, and Scope of Workf. Construction of stormwater treatment facilities to satisfy States municipal separate storm sewersystem (MS4) Permit with the Minnesota Pollution Control Agency (MPCA), including vegetationnecessary for infiltrating design requirements. The Stormwater Management Plan will review theproject limits and the construction limits and propose a treatment plan for the project.g. To include the Environmental Management Plan and assistance with development of the plan tomeet environmental commitments on the project and assure full environmental compliance withthe project.h. Removal and replacement of roadway signing and pavement markings per Minneapolis standardsi. City utility improvements (sanitary and watermain) prepared by others as necessary.j. Removal and replacement of roadway lighting per City of Minneapolis standards along HennepinAve. in agreement with the applicable cost participation policy.k. Removal and replacement of signal system at Hennepin and Industrial Blvd. City of Minneapolisoperates and maintains the signal, and signal system to include interconnect with the MinnesotaCommercial Railroad signal and stop arm functionality on Hennepin Ave., and interconnect toadjacent signals.l. Signal removal at Broadway St. NE and TH 280m. Barrier construction to close intersection at Broadway St. NE and TH 280n. Removal and replacement of traffic barrier & guardrail to current design standards. Smallquantities unknown at time of scope preservation.o. Drainage design for Energy Park Drive failing storm sewer.p. To include bridge plans to be developed by others andq. To include Time and Traffic Specifications to be inserted into the plans and specificationsdeveloped by others.1.2.9. The services to be provided also includes:a. The development of the Transportation Management Plan and the necessary planning meetingsfor developing the staging and traffic control plan development for the TransportationManagement Plan. This includes investigating other roadway projects in the vicinity of the projectand providing recommendations for maintenance of traffic during construction and thedevelopment of construction staging plans, traffic control plans, and detour plans to minimizingtraffic interruptions from the projects for the traveling public and corridor business needs.b. Utility coordination and notification activities have not occurred and is required to be completedas part of this scope of services.c. Drainage design - The drainage preliminary design for Broadway St. NE has been completed;however, the preliminary drainage design has not been completed for Hennepin Ave. Stormwatermanagement planning and preliminary and final drainage design is required to be completed aspart of this scope of services.d. Development of the Transportation Management Plan, including the coordination of planningmeetings to establish staging and traffic control strategies. This involves reviewing nearbyroadway projects, recommending maintenance of traffic measures during construction, andpreparing construction staging plans, traffic control plans, and detour plans to minimizedisruptions for the traveling public and meet the needs of corridor businesses. Review of thetraffic control plans and develop the Time and Traffic Specifications are to be developed by MetroDistrict Resident Engineers to be included in the project’s special provisions.e. Adherence to the District’s signed Scoping Report for this project and follows Metro District scopechange request guidelines through the State’s Project Manager (PM) for any scope changes.4MnDOT Contract No. 1062357Exhibit C: Specifications, Duties, and Scope of Workf. Assistance with development of the Turn in Memorandum and documents required for thissubmittal including for example Cost Effectiveness Finding (CEF)’s, Public Interest Findings (PIFs)and other documents necessary for a successful turn in.g. Assistance with the development of the cooperative construction agreement and any othernecessary project-related agreements, including the preparation and provision of required dataand supporting documentation.h. Assistance with layouts and details in support of the Categorical Exclusion (CATEX) and projectcommunications.1.2.10. Services not included are:a. Surveysb. Utility Surveys and/or Subsurface Utility Engineering (SUE) investigationsc. Geotechnical Exploration Effortsd. CATEX Developmente. Contaminated soils investigations1.3. Milestones and Contract Completion Timeline1.3.1. Project Kickoff Meeting –1 week after contract executiona. Preliminary and Drainage Design – 4 weeks after contract executionb. Draft Stormwater Management Plan Memorandumc. Summary table of applicable drainage design standardsd. Plan outlining additional studies required to finalize drainage and stormwater design for thecorridore. Preliminary drainage design plan compliant with MnDOT and State Aid Spread Standards1.3.2. 30% Plans Complete – July 31, 2026a. TMP Completeb. Title Page and Other Requisite Pagesc. Review Checklistd. Summary list of likely non-boilerplate special provisions.e. 30% Construction Cost Estimatef. Preliminary stormwater Management Plan and 30% Drainage Plang. Memo: Geotechnical Recommendations and Geotechnical Investigations Neededh. Memo: Utility Coordination Plan and Schedulei. MEMO: Recommendations, Understandings and Design Standards – Pavement, Signing, Lighting,Pavement Markings, Signals and Statement of Estimated Quantities (SEQ)j. Draft Complex B Submittal Memorandum (Preliminary Draft)1.3.3. CATEX Completed by Others – October 15, 20261.3.4. 60% Plans Complete – October 15, 2026a. Final Hydraulics Designb. Final Signal Designc. Final Road Designd. Signing Designe. Lighting Design5
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
I494 Design Build Project 2 V...
I494 Design Build Project 2 Verification Team Brief Description: MnDOT requests responses for
State Government of Minnesota
Bid Due: 7/14/2026
26-21 - Maple Grove Community...
Bid Title: 26-21 - Maple Grove Community Center Phase 2 - BP2 Category:
City of Maple Grove
Bid Due: 7/28/2026