CM Rustic Cabins at New Discovery & Lake Carmi State Parks Addendum 1
Project Information
- Bid Title
- CM Rustic Cabins at New Discovery & Lake Carmi State Parks Addendum 1
- Issuing Agency
- State of Vermont
- Location
- Vermont
- Published Date
- Mar 30, 2026
- Closing Date
- Apr 8, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER CM Rustic Cabins at New Discovery & Lake Carmi State Parks
Addendum 1
03/20/2026 04:30PM
04/08/2026 04:30PM
- Attachment Preview
-
REQUEST FOR PROPOSALCONSTRUCTION MANAGEMENT SERVICES FOR MULTIPLE RUSTIC CABININSTALLATIONS ATNEW DISCOVERY STATE PARK, MARSHFIELD, VT AND LAKE CARMI STATE PARK,FRANKLIN, VTADDENDUM # 1State of VermontDepartment of Buildings and General ServicesOffice of Purchasing & Contracting133 State StreetMontpelier, Vermont 05633-8000DATE March 30, 2026TO ALL BIDDERS OF RECORD:This Addendum consists of (2) pages.Acknowledge receipt of this Addendum by entering its number and date on the Proposal Form. This Addendum formsa part of the Contract Documents and modifies them as follows:Items:1. Date Changes:RESPONSES DUE BY: April 8, 2026 – 4:30 PM (EST)Non-Mandatory Pre-Bid Meeting (held in person and online) Attendeesa.Frank Spaulding, Vermont State Parksb.Jill Korcoulis, Construction Summary of NH/Maine/VT, Incc.Jordan Royer, ReArch Constructiond.Mark Fyrberg, Opus Corporatione.Brian Sprague, Opus Corporationf.Josh Mather, Black Bear Constructiong.Joe Slayton, Juggernaut Constructionh.Bud Stevens, Juggernaut Construction2. Questions & Answers:a.Q.Will bonding be required for the project?A.1.7.2. BONDING: Full bonding is required for this Project.b.Q.What type of rustic building (Log, Timber or stick frame with rustic siding)?A.Bidders’ attention is directed to, and the following text is appended to 3.1.3 CabinStructure–The designs are provided to convey the desired character, dimensions and aesthetic of thecomplete structure. State Parks will be flexible in approving the type of construction, (Stick, Postand Beam, Log, etc.) as long as the structure meets the program requirements detailed in the RFP,including but not necessarily limited to attractive aesthetic, ADA compliance, and price point thatresults in a value investment.FPR cannot compromise on elements of aesthetic and quality to the point where the cabinbecomes unattractive to rental or compromises the protected image and “brand” of Vermont StateParksc.Q.If Log will that be put out as a separate bid or to be through the Management service?A.All work, including labor and materials will be coordinated by and through the managementRev 03.20.2026service and will be incorporated in the Guaranteed Maximum Price (GMP) as structured in theRFPd.Q.Why and do bidders need to complete B – Hourly Rate Schedule on page 2 of 3 of the BidProposal Form?A.This is additional information to assist in evaluating the proposals for award and biddersmust provide hourly rates as appropriate for their firm to the best of their knowledge.e.Q.Where is the nearest power source? (New Discovery State Park)A.The nearest power source is located at road junction near Campsite #30 at New DiscoveryState Park as indicated on sheet 1 of 12 of the drawings titled New Discovery State Park Rustic Cabinsreferenced as 11.10 in ATTACHMENTS in the RFP.f.Q.Required Amperage?A.Power requirements for the Cabins are outlined beginning in Section 3.1.4 in the RFP andservice requirements will be dictated by what is needed to power the desired program in accordance withNEC.For the purposes of conduit sizing for proposed RV electrical sites, each powered siteassumes a 50 AMP RV pedestal.Power requirements for the toilet building will be what is required by the existing demandsof the building.Repowered existing host site shall be a 50 AMP RV pedestal.END OF ADDENDUM # 1Rev 03.20.2026
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Bay Street Water, Sewer & Sto...
Bay Street Water, Sewer & Storm Improvements, St. Johnsbury, VT Request Date: 6/25/2026
State Government of Vermont
Bid Due: 7/23/2026
Paving Project Request Date: 6/22/2026 1:46:08 PM Open Date: Closing Date: 7/8/2026 1:00
State Government of Vermont
Bid Due: 7/08/2026