Sunset Nature Lodge HVAC Replacement
Project Information
- Bid Title
- Sunset Nature Lodge HVAC Replacement
- Issuing Agency
- City of Florissant
- Location
- Missouri
- Published Date
- Jun 18, 2026
- Closing Date
- Jul 16, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 25-0260-PR
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID: 25-0260-PR
Title: Sunset Nature Lodge HVAC Replacement
Addenda: 0
Release Date: 6/18/2026
Due Date: 7/16/2026
Sunset Nature Lodge HVAC ReplacementFollowInvitation For BidParks and Recreation22133 , 23822 , 238220 , 33341 , 333415 ... show allProject ID: 25-0260-PRRelease Date: Thursday, June 18, 2026· Due Date: Thursday, July 16, 2026 10:00amPosted Thursday, June 18, 2026 4:30pmAll dates & times in Central TimeDraft Response Events RSVP No Bid27 days, 13 hours, 47 minutesOverview
Post Information
Posted At:Thu, Jun 18, 2026 4:30 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryGeneral work description: The City of Florissant is soliciting sealed bids from qualified HVAC contractors to furnish all labor, materials, equipment, permits, supervision, and incidentals necessary to remove and replace three (3) existing HVAC split systems at Sunset Nature Lodge.
The replacement units shall be Sure Comfort Vantix™ Line Side-Discharge Universal Heat Pumps, Model RD18AY Series, matched with compatible inverter-driven air handling equipment and electric backup heat as specified herein.
See Exhibit A in attachments for detailed specs.
No substitutions, alternates, equals, or approved equivalents will be accepted.
Project Location:
Sunset Nature Lodge
2300 Sunset Park Drive
Florissant, Missouri 63031Scope of Work
The successful contractor shall provide all labor, materials, equipment, tools, transportation, and supervision necessary to complete the following:
Demolition and Removal
- Disconnect and remove three (3) existing HVAC split systems currently serving Sunset Nature Lodge.
- Recover refrigerant in accordance with EPA regulations.
- Remove and legally dispose of all existing condensers, air handlers, refrigerant piping, controls, and related components designated for replacement.
- Protect existing building finishes and adjacent facilities during removal operations.
New Equipment Installation
Provide and install:
-
Three (3) Sure Comfort Vantix™ Line Side-Discharge Universal Heat Pumps
- Model Series: RD18AY
- Capacity: 5 Ton (or size matching existing load requirements)
-
Efficiency:
- Cooling Efficiencies up to 19 SEER2/13 EER2
- Heating Efficiencies up to 10 HSPF2
- Refrigerant: R-454B
- Inverter-driven variable speed compressor technology
-
Three (3) matching compatible inverter air handlers with:
- Variable-speed blower motors
- Electric backup heat packages
- Factory-approved communicating controls
Refrigerant Piping
- Inspect existing refrigerant line sets.
- Flush and clean reusable line sets using approved refrigerant line flushing procedures.
- Replace any damaged or unsuitable piping as required.
- Pressure test all refrigerant piping systems.
- Evacuate systems to manufacturer-required vacuum levels before charging.
Electrical Work
- Reconnect existing electrical services to new equipment.
- Install new disconnects, whips, breakers, and electrical components as required for code compliance.
- Coordinate all electrical modifications necessary for proper operation of the new equipment.
- Verify compatibility of existing electrical service with installed equipment.
Ductwork Modifications
- Modify and reconnect existing supply and return ductwork as required.
- Seal all duct connections.
- Ensure proper airflow and system balancing throughout the facility.
Controls and Commissioning
- Install manufacturer-approved thermostats and control interfaces.
- Program and configure all equipment controls.
- Start up and commission each HVAC system in accordance with manufacturer requirements.
- Verify proper heating, cooling, airflow, and control operation.
- Provide written startup and commissioning reports.
Testing and Balancing
- Verify system performance and operating pressures.
- Confirm proper refrigerant charge.
- Test heating and cooling modes.
- Balance airflow as required for proper operation.
Contractor Requirements
The contractor shall:
- Be licensed to perform HVAC work in the State of Missouri.
- Maintain all required insurance coverage.
- Comply with all applicable federal, state, and local codes.
- Obtain all permits required for the work.
- Coordinate work with City staff to minimize disruption to facility operations.
- Remove all debris daily and maintain a clean work site.
Warranty Requirements
Contractor shall provide:
- Manufacturer's standard equipment warranty.
- Minimum one (1) year warranty on workmanship and installation.
- Warranty documentation shall be provided at project closeout.
- Provide pricing for additional (1) year maintenance contract
Closeout Documents
Upon completion, contractor shall provide:
- Equipment manuals.
- Warranty certificates.
- Startup and commissioning reports.
- As-built documentation identifying equipment installed.
- Recommended maintenance schedule.
Timeline
Release Project Date:June 18, 2026Pre-Bid Meeting (Non-Mandatory):June 25, 2026, 10:00am2300 Sunset Park Dr, Florissant, MO 63031Question Submission Deadline:July 14, 2026, 5:00pmQuestion Response Deadline:July 15, 2026, 5:00pmSubmission Deadline:July 16, 2026, 10:00amZoom: 6a7iMe
Passcode: https://us04web.zoom.us/j/72145592654?pwd=CVcybztLSpaXRt59JQXPH49h950gqa.1
Session will begin at 10 am and continue until prices for all bidders have been read. - Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
LTUY232044 Repair Buildings 1...
Follow LTUY232044 Repair Buildings 1, 28, and 36 Windows Active Contract Opportunity Notice
DEPT OF DEFENSE
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded
State Government of Missouri
Bid Due: 8/27/2026