Cherry Point Preserve Stormwater Pipe
Project Information
- Bid Title
- Cherry Point Preserve Stormwater Pipe
- Issuing Agency
- Beaufort County
- Location
- South Carolina
- Published Date
- Jun 3, 2026
- Closing Date
- Jul 7, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: Cherry Point Preserve Stormwater Pipe
Addenda: 0
Release Date: 6/3/2026
Due Date: 7/7/2026
Cherry Point Preserve Stormwater PipeFollowInvitation For BidLand Preservation90900 , 91000 , 91200 , 91300 , 91400 ... show allProject ID: 070726Release Date: Wednesday, June 3, 2026ยท Due Date: Tuesday, July 7, 2026 3:00pmPosted Wednesday, June 3, 2026 4:02pmAll dates & times in Eastern TimeDraft Response Events RSVP No Bid33 days, 17 hours, 25 minutesOverview
Post Information
Posted At:Wed, Jun 3, 2026 4:02 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryThe parcel owned and maintained by Beaufort County known as Cherry Point Preserve is currently bisected by an existing drainage ditch that ultimately conveys runoff to the Okatie River. To maintain County access from the staff entrance gate to the east portion of the property, a new crossing is proposed across the drainage ditch. The parcel (Beaufort County TMS #R600 013 000 0061 0000) is located parallel to Pritcher Point Road, bordered by Heffallump Road to the north, the Beaufort County Animal Shelter and US-170 to the west, Pritcher Point Road to the south, and an unnamed tributary to the Okatie River along the eastern boundary. The property is predominantly wooded and undeveloped, and closed to the public. Stormwater currently flows into and through the existing ditch running through the center of the site, ultimately discharging toward the Okatie River. Minimal tree removal is anticipated to accommodate the proposed stormwater crossing and the culvert design was developed to avoid impacts to significant or specimen trees to the extent practicable. The approved improvements include installation of a 60-inch reinforced concrete pipe (RCP) to maintain uninterrupted flow within the ditch, along with a gravel-stone surface crossing above the pipe to facilitate access. No utilities are proposed as part of this project, as the site is unoccupied. An existing 30-inch pipe extending from the Malind Bluff subdivision appears to initiate the ditch system, which widens naturally moving northeast. The drainage areas contributing to the ditch upstream of the proposed 60-inch pipe were delineated and analyzed for the 100-year storm. These areas were combined and modeled using the Rational Method within an AutoCAD Express model to appropriately size the culvert for 103.42 cfs.
Timeline
Release Project Date:June 3, 2026Pre-Bid Meeting (Non-Mandatory):June 16, 2026, 2:00pmPlease email gmurray@bcgov.net for your TEAMs InviteQuestion Submission Deadline:June 24, 2026, 5:00pmResponse Submission Deadline:July 7, 2026, 3:00pm
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
UNITY TANK R-26-1438 DIVISION...
Project Name: UNITY TANK R-26-1438 DIVISION I & DIVISION II Agency/Owner: City of
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/16/2026
Project 3500 Western Peninsul...
Ad Title: Project 3500 Western Peninsula - Civil Engineering and Landscape Architecturre Services
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/21/2026