**RFQ for Design-Build**Pitt CC Greenville Center Renovation-Public Services
Project Information
- Bid Title
- **RFQ for Design-Build**Pitt CC Greenville Center Renovation-Public Services
- Issuing Agency
- State Government of North Carolina
- Location
- North Carolina
- Published Date
- May 26, 2026
- Closing Date
- Jun 19, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 115C-PCC-013
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Solicitation Number: 115C-PCC-013 Project Title: **RFQ for Design-Build**Pitt CC Greenville Center Renovation-Public Services Description: This is RFQ is for Design Build services. Pitt CC will be relocating our various Public Service programs to space available at our Greenville Center location. Relocating in this facility empowers the programs to operate in a space specifically tailored for them. The building is approximately 27,105 square feet with existing floorplan (Exhibit A), Study preliminary floorplan (Exhibit B) as well as exterior façade upgrade (Exhibit C). Additional work will include painting and finishes in other areas of the building as identified during design. All design guidelines are to follow minimum requirements identified by NC Law Enforcement, Fire, and EMS Training requirements. Opening Date: 6/19/2026 3:00 PM Posted Date: 5/27/2026 Status: Open Department: PITT COMMUNITY COLLEGE - CONSTRUCTION Solicitation Number*115C-PCC-013DepartmentPITT COMMUNITY COLLEGE - CONSTRUCTIONStatus ReasonOpenOpening Date2026-06-19T15:00:00.0000000Posted Date*2026-05-26T15:34:03.0000000ZPrimary Commodity CodeConstruction ServicesMandatory Conference/Site Visit2026-06-04T04:00:00.0000000ZSpecial InstructionsPre-submittal meeting will be held on site at 10:00am on June 4th, 2026. The address is 3107 S Memorial Road, Greenville, NC 27834. Please enter at front of building.Solicitation Type*Select RFP IFB RFIOwnerGlenn SheppardDescriptionThis is RFQ is for Design Build services. Pitt CC will be relocating our various Public Service programs to space available at our Greenville Center location. Relocating in this facility empowers the programs to operate in a space specifically tailored for them. The building is approximately 27,105 square feet with existing floorplan (Exhibit A), Study preliminary floorplan (Exhibit B) as well as exterior façade upgrade (Exhibit C). Additional work will include painting and finishes in other areas of the building as identified during design. All design guidelines are to follow minimum requirements identified by NC Law Enforcement, Fire, and EMS Training requirements. - Attachment Preview
-
DESIGN-BUILD REQUEST FOR QUALIFICATIONS (RFQ)May 15, 2026Department/AgencyPitt Community CollegeProject TitleGreenville Center Renovation-Public ServicesScope of WorkRenovation of approximately 27,000 sq.ft. for educational purposes andupdating finishes in remaining areas.ContactGlenn Sheppard, AVP of Facilities and ConstructionTelephone(252) 493-7593EmailGlsheppard063@m.pittcc.eduTotal Project Budget$4,500,000.00 inclusive of Owners Contingency and ReservesSource of FundsState of NC-SCIFApproved OC-25 #Publish DateMay 15, 2026Closing DateJune 19, 2026 @ 3:00pmSubmit FIVE (5) copies ofBy Main:Pitt Community College-Facilities & Constructionqualifications information package P.O. Drawer 7007to (this is both mailing and delivery Greenville, NC 27836-7200address):Attn: Glenn SheppardSubmit one electronic copy toGlsheppard063@my.pittcc.edu Hand Delivery*Pitt Community College-Facilities and Construction2064 Warren DriveWinterville, NC 28590*Fedex, UPS, or similar carrier methods may require this address for delivery.Please verify information with carrier.The proposing Design-Build entity must be able to perform the requisite Designand Construction services with appropriately qualified personnel having validprofessional and business licenses in good standing under the laws of the Stateof North Carolina. Relevant information can be found the following websites:CONSTRUCTION:NC Licensing Board for General Contractors: (https://nclbgc.org)NC State Board of Examiners of Electrical Contractors:(https://www.ncbeec.org)NC State Board of Examiners of Plumbing, Heating and Fire SprinklerContractors: (https://www.nclicensing.org)NC Landscape Contractors’ Licensing Board:(https://nclclb.com)DESIGN:NC Board of Architecture & Interior Designers: (http://www.ncbarch.org)NC Board of Examiners for Engineers and Surveyors:(http://www.ncbels.org)NC Board of Landscape Architects: (http://www.ncbola.org)Page 1 of 8DESIGN-BUILD REQUEST FOR QUALIFICATIONS (RFQ)May 15, 2026I. SCOPEPitt CC will be relocating our various Public Service programs to space available at ourGreenville Center location. Relocating in this facility empowers the programs to operate in aspace specifically tailored for them. The building is approximately 27,105 square feet withexisting floorplan (Exhibit A), Study preliminary floorplan (Exhibit B) as well as exterior façadeupgrade (Exhibit C). Additional work will include painting and finishes in other areas of thebuilding as identified during design. All design guidelines are to follow minimum requirementsidentified by NC Law Enforcement, Fire, and EMS Training requirements.Total project cost is $4,500,000.00 inclusive of 5% Contingency.The project delivery method will be Design-Build under NC Statute 143-128.1A Design-Build Contracts.Form of contract can be found at https://www.doa.nc.gov/documents/files/sco-design-build-construction-contract-forms-and-bonds-3-1-2023/openDesign-Build General Conditions: https://www.doa.nc.gov/documents/files/sco-design-build-general-conditions-contract/openII. SCHEDULEAdvertise RFQPre-submittal Scope Briefing (Mandatory Attendance)RFQ Submission DeadlineShortlist Preferred Candidates (Rank top three)Interview & Recommend Preferred FinalistObtain Board of Trustees ApprovalExecute Pre-Construction AgreementStart Pre-Construction ServicesStart Construction ServicesProject Complete05/12/202606/04/2026 - 10:00 AM06/19/2026 - 3:00 PM06/26/202607/08/2026-1:00pm to 5:00pm07/28/202608/21/2026Fall 2026Winter 2026/Spring 2027Fall 2027Page 2 of 8DESIGN-BUILD REQUEST FOR QUALIFICATIONS (RFQ)May 15, 2026III. SELECTION CRITERIAPCC will evaluate RFQ respondents according to the provisions of North Carolina G.S. 143-64.31,declaration of public policy regarding qualifications-based selection for Design-Build services. Additionally,and consistent with the University’s goal of achieving at least 10% minority participation for providingproducts and services in this project, PCC will evaluate respondents’ plans to address the provisions of G.S.143-128.2 and 143-128.4 for Minority Participation. The criteria for weighted percentage information isprovided in the RFQ Information Package Response.Also note that under G.S.143-128.1A.(c) (8), PCC has the discretion to require either option “a” or “b” tospecify procedural criteria by which Design-Builders may select team participants. PCC specifies “optiona”.IV. RFQ INFORMATION PACKAGE RESPONSEFormat:Provide FIVE (5) copies of the qualification information package. Provide hardcopy in 8 ½ x 11 size,bound by clips or staple, and not exceeding 20 double-sided (or 40 single-sided) pages ofcopy/illustrations. Do not bind user plastic or wire binders or notebooks. E-mail and Fax submittals willnot be accepted; however, a PDF copy via flash-drive or email- attachment is requested in addition tothe hardcopy submittal.Contents:Provide ONE (1) cover letter for the submittal package acting as an expression of interest and astransmittal.The contents of the RFQ submittal describe the composition of the Design-Build team; the reason for theirinclusion; the personnel and roles; the management approach; and relevant experience pertinent to thisand comparable projects. Use the following outline as a guide.A.The Design-Build Team (25%)(1) Name of key firms selected by the Design-Build Team dedicated to the project(2) Describe ownership, thumbnail history, services, location, staff-size of each key firm(3) Show/describe each firm’s involvement in relevant, successfully completedprojects(4) Indicate extent of history collaborating with selected firms(5) Disclose any current or impending legal issues associated with collaboratingparticipants(6) Provide evidence of appropriate certifications (See “F” below)B. Personnel (10%)The Design-Build team will identify its roster of key personnel who will be dedicated tothis project. Describe why they were selected and the role they will play. Describehow key personnel have demonstrated their qualifications, capacity and relevantsuccessful experience performing the required work. Include appropriate evidence ofprofessional licensure and/or certifications. Note: the successful Design-Buildermust obtain advanced written approval from PCC Facilities and Construction assignedProject Manager noted in this RFP prior to any change in personnel listed in theirPage 3 of 8DESIGN-BUILD REQUEST FOR QUALIFICATIONS (RFQ)May 15, 2026submittal.CHUB Plan (10%)The Design-Build team will include its plan to obtain participation by HUB firms. PittCommunity College encourages participation by MWBE firms and supports NC SCO andNCCC system’s policy of ensuring and promoting opportunities for minority businessesto meet or exceed the goals set by North Carolina General Statute 143-128.2. Provideevidence of past projects and efforts. Outline specific outreach efforts to engage HUBfirms for participation in this project. Indicate the minority participation goal expectedto be achieved on the project.D. Describe Design-Build team’s Methodology to achieve PCC’s project objectives (45%):(1) Your techniques for collaboration in comparable educational environments(2) Your plan for determining the true scope of the Work(3) Your plan for determining the likely cost and maintaining a workable budget(4) Your plan for determining and managing a workable schedule consistent with the Item II(5) Your plan for managing personnel who are involved in each step of project execution(6) Your examples or evidence of applying these techniques on comparableprojects of similar scope and complexityE. Capacity to Deliver Design-Build Services (5%)Bonding:Provide a letter, dated within the last 30 days, from Design-Builder’s surety company,signed by their Attorney in Fact, verifying the surety’s willingness to issue sufficientpayment and performance bonds for this project, on behalf of design-builder or itsagent licensed to do business in North Carolina, and verifying the firm’s capability andcapacity based on current value of work. Surety company bond rating shall be rated “A”or better under the A.M. Best Rating system or The Federal Treasury List.F.Certifications (5%)Each Design-Builder shall provide the written certifications that that each designprofessional who is a member of the design build team is licensed and in good standingin the State of North Carolina, including sub-consultants, was selected based upondemonstrated competence and qualifications in the manner provided by G.S. 143-64.31,based solely on qualifications without regard to fee.V. Pre-submittal BriefingInterested parties must attend a mandatory pre-submittal briefing on the date shown in Item II. -Schedule above. Attendees will observe the project site or sites to examine existing conditions and receivea briefing by the PCC Project Representative. The meeting will be held at the PCC-Greenville Center, 3107S Memorial Road, Greenville, NC 27834. There will be no individual meetings or marketing meetingsconducted or allowed.VI. Design-Build SelectionComplete submittals are due at PCC Facilities and Construction on the date and time indicated in Item II –Page 4 of 8DESIGN-BUILD REQUEST FOR QUALIFICATIONS (RFQ)May 15, 2026Schedule.Pursuant to G.S. 143.64.31, a selection committee of PCC representatives will shortlist and rank-order thetop three Design-Build candidates who will be invited to interview. The selection committee will rankorder the candidates and submit the ranked candidates to the PCC-Board of Trustees. Pending approval,contract negotiations will commence.In the event fewer than three respondents provide submittals, the project will be re-advertised and theselection process will continue as described above.Page 5 of 8
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Project: SIA - Nevada Blvd RRFB Ref. #: 269-2027-004 Department: City Procurement Type:
City of Charlotte
Bid Due: 7/22/2026
Invitation for Bid #: 54-DM-3...
Solicitation Number: 54-DM-37001 Project Title: Invitation for Bid #: 54-DM-37001 Description: Corrugated Aluminum
State Government of North Carolina
Bid Due: 7/06/2026