FCC Yazoo City - Hot Water Pumps Replacement

Project Information

Bid Title
FCC Yazoo City - Hot Water Pumps Replacement
Issuing Agency
JUSTICE, DEPARTMENT OF
Location
Mississippi
Published Date
Jun 9, 2026
Closing Date
Jun 22, 2026
Government Level
Federal
Status
Closed
Ref. #
26Z3AP2
Original Source
Join to Access Full Details
Project Description
Follow
FCC Yazoo City - Hot Water Pumps Replacement
Active
Contract Opportunity
Notice ID
26Z3AP2
Related Notice
Department/Ind. Agency
JUSTICE, DEPARTMENT OF
Sub-tier
FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
Office
FCC YAZOO CITY
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Jun 09, 2026 09:56 am CDT
  • Original Date Offers Due: Jun 22, 2026 12:00 pm CDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Jul 07, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 4520 - SPACE AND WATER HEATING EQUIPMENT
  • NAICS Code:
    • 333414 - Heating Equipment (except Warm Air Furnaces) Manufacturing
  • Place of Performance:
    Yazoo City , MS 39194
    USA
Description

The primary objective of this project is to replace two (2) existing hot water pumps at the Federal Correctional Complex (FCC) Yazoo City, Low I Powerhouse, located in Yazoo City, Mississippi (26Z3AP2 YA... p. 1). The contractor will provide all labor, materials, and equipment required to legally dispose of the old pumps and install new base-mounted, double-suction split-case centrifugal pumps (26Z3AP2 YA... pp. 1-2).





Key Equipment Specifications




  • Pump Model: Bell & Gossett e-HSC Model 4x6x12 or approved equivalent (26Z3AP2 YA... p. 2).

  • Performance Targets: Design flow of 700 GPM at 152 feet of total dynamic head, operating at 1780 RPM (26Z3AP2 YA... p. 2).

  • Efficiency Standards: Minimum hydraulic efficiency of 82% with a design BHP of 33 (26Z3AP2 YA... p. 2).

  • Motor Requirements: Driven by a 50 HP motor adhering to NEMA premium efficiency standards (26Z3AP2 YA... p. 2).

  • Additional Metrics: Minimum shutoff head of 170 feet and a maximum Net Positive Suction Head required (NPSHr) of 11.1 feet at the design point (26Z3AP2 YA... p. 2).






Contractor Duties & Milestones




  • Pre-Installation: Field-verify all piping sizes, elevations, and equipment clearances before procuring materials (26Z3AP2 YA... p. 2).

  • Installation: Legally dispose of existing pumps, isolation valves, and expansion joints (26Z3AP2 YA... p. 2). Install new full-port isolation valves, suction diffusers, check valves, pressure gauges, and expansion joints with control rods (26Z3AP2 YA... p. 2).

  • Alignment & Protection: Run final laser alignment and lubrication after grouting while ensuring modifications prevent any mechanical strain on pump nozzles (26Z3AP2 YA... p. 2).

  • Commissioning: Manage system startup, balancing, cleaning, and vibration testing using a factory-authorized representative (26Z3AP2 YA... p. 2). Provide the COR with 48 hours' notice prior to system shutdowns (26Z3AP2 YA... p. 2).

  • Handover: Deliver O&M manuals, laser alignment reports, warranty documentation, and manufacturer-specified hours of owner training (26Z3AP2 YA... p. 3).

  • Experience: Must demonstrate a minimum of seven (7) years of documented experience with systems of similar complexity meeting Hydraulic Institute (HI) and NEMA standards (26Z3AP2 YA... p. 3).






Timeline & Security Constraints



Attached is the SOW. Site visit will be held 6/16/26 at 10 AM CST. Please contact B. Wiles @ bhwiles@bop.gov if interested no later than 6/12/26 12 Noon CST.




  • Work Schedule: Monday through Friday, 7:30 AM to 3:30 PM, excluding federal holidays (26Z3AP2 YA... p. 1). Schedule changes require 48-hour advance approval from the COR (26Z3AP2 YA... p. 1).

  • Project Duration: Total project timeline must not exceed 250 calendar days from the issuance of the notice to proceed (26Z3AP2 YA... p. 1).

  • Security & Inmate Interaction: Workers will be escorted by Bureau of Prisons staff at all times and are restricted from unsupervised contact or interaction with inmates (26Z3AP2 YA... pp. 2-3).


Attachments/Links
Contact Information
Contracting Office Address
  • PO BOX 5666
  • YAZOO CITY , MS 39194
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Jun 09, 2026 09:56 am CDTCombined Synopsis/Solicitation (Original)
Commodity Codes
  • FSC 45Plumbing, Heating, and Sanitation Equipment
  • NAICS 333414Heating Equipment (except Warm Air Furnaces) Manufacturing
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

ENID LAKE -SEWER PUMP STATION

Follow ENID LAKE -SEWER PUMP STATION Active Contract Opportunity Notice ID W912EE26QA028 Related

DEPT OF DEFENSE

Bid Due: 7/06/2026