Bid Pack 1B - MCS Site & Athletic Improvements
Project Information
- Bid Title
- Bid Pack 1B - MCS Site & Athletic Improvements
- Issuing Agency
- Mattawan Consolidated School District
- Location
- Michigan
- Published Date
- Dec 5, 2025
- Closing Date
- Dec 15, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Pack 1B - MCS Site & Athletic Improvements
- Attachment Preview
-
MCS Site & AthleticImprovementsBP1BMattawan, MIAVB-25-113AVB 01 0000SUBCONTRACTOR GENERAL REQUIREMENTSBelow is a list of the Sections that help comprise the AVB Contractual General Requirements Article. Documents may be addedor deleted as seen fit by AVB Construction with or without notice to the Bidders/Contractors. While this list is a general overview,it is not an all-inclusive list by any means. Other Contractual documents such as drawings, specifications, addenda, Bulletins,RFIs, reports, etc. are to be included as well (See Project Manual for additional information):01 10 0001 14 0001 25 0001 26 0001 29 7601 31 0001 32 1301 33 1301 33 2301 35 2001 35 2101 35 4001 35 4301 40 0001 51 0001 52 0001 71 0001 73 0001 74 0001 77 1901 78 3601 80 00Summary/General Items........................................................................................................Access to/Use of Site ...............................................................................................................Substitution Procedures .........................................................................................................Contract Modification Procedures.......................................................................................Payment Procedures...............................................................................................................Project Coordination..............................................................................................................Construction Scheduling........................................................................................................Administrative Submittals (Certifications, Signed Contracts, etc.) ...................................Submittals (Drawings, Product Data, Samples, etc.)...........................................................Safety .......................................................................................................................................Asbestos Awareness................................................................................................................Environmental Goals..............................................................................................................Construction Waste Management Plan ................................................................................Reference Standards and Definitions....................................................................................Temporary Utilities ................................................................................................................Temporary Facilities ..............................................................................................................Layout ......................................................................................................................................Cutting and Patching .............................................................................................................Cleaning and Debris Control.................................................................................................Project Close-Out ...................................................................................................................Warranty Requirements ........................................................................................................General Installation Provisions .............................................................................................Within the following pages are the descriptions of each Section noted above as it pertains to MCS Campus Site and AthleticImprovements, BP1B also referred to herein as “The Project”. Each Bidder/Contractor/Sub-Contractor will be held responsibleRev 7/2020for reading and adhering to any and all data as found within the following pages. See also Article AVB 00 0000 BidderInstructions and Requirements.MCS CAMPUS SITE AND ATHLETIC IMPROVEMENTS2. AVB 01 0000 SUBCONTRACTOR GEN REQ TEMPLATE V15 07272020Page 2 of 4301 10 00 Summary/General Items1.1. The Subcontractor shall determine all quantities required and indicate same where required, and verify all quantitiesindicated on the Form of Bid Proposal, and provide any and all quantity information requested.1.2. The Subcontractor shall have full-time supervision on the jobsite at all times who is knowledgeable and competent inthe detailed requirements of the work of this work category. This person shall not be removed from this project untilthe work is complete and shall not be removed or replaced without the approval of AVB Construction.1.3. The Subcontractor shall provide all quality safety and dust control required for the work of this work category,including specific layout and location of all items.1.4. The Subcontractor shall not commence work until the following insurance certificates and other items are receivedfrom the Subcontractor and approved by AVB Construction (See Section 01 33 13 for requirements and deadlines):1. Signed construction Subcontract2. Bonds (if applicable to project)3. Commercial General Liability, Auto and Worker’s Compensation Insurance Certificates4. Safety Manual5. Schedule of Values1.5. All work installed under this work category must meet all applicable codes and governing body requirements, as wellas applicable or referenced standards.1.6. Subcontractors shall comply with those items as noted in Article 00 00 00, Section 00 45 00 which includes MichiganDepartment of Civil Rights and Michigan’s Right-To-Know-Law.1.7. The Subcontractor shall keep pace with the project schedule, as it accelerates or decelerates with other trades, asdirected by AVB Construction. The Subcontractor will be given a twenty four (24) hour notice to increase/decreaseproduction to maintain schedule. Failure to comply will be just cause for AVB Construction to contract with othersources to maintain schedule. The cost of this additional work will be borne by the Subcontractor.1.8. Subcontractor shall schedule all required inspections applicable to this work with the Governing InspectionDepartment. Subcontractor shall have sole responsibility for the completed function of the work of this work categoryto gain final inspection approval of all Governing Authorities. Any additional work or process required to gain suchapproval and acceptance is the responsibility of the Subcontractor and is included in the bid cost of the work of thiswork category.1.9. Subcontractor must coordinate its work with the work of other Subcontractor at the site to eliminate conflicts. Noadditional costs as a result of a lack of coordination will be allowed.1.10. Subcontractor shall complete the work of this work category according to the schedule provided by AVBConstruction, or complete it sooner, and as a part of the work of this work category agrees to comply with any and allschedule changes, updates and directives.1.11. Any requests for extra charges presented by Subcontractor to AVB Construction will be considered if, and only if,AVB Construction is contacted regarding the necessity of a revision, alteration, and/or additional work prior to theperformance of the work. AVB Construction must authorize the work to be performed and agree to the charges inadvance and in writing by issuing a written change order for the work. AVB Construction will not be responsible forthe cost of extra work performed without written approval.1.12. Subcontractor shall be responsible to perform all work of this work category in a 100% safe manner, without any riskto its employees or the employees of others at the site. Subcontractor shall be responsible for the cost of repairs as aresult of this Subcontractor damaging its work, and shall be responsible for the cost of repairs as a result of thisSubcontractor damaging the work of other Subcontractor, with the repair costs by others deducted from thisSubcontractor’s contract by change order.1.13. Subcontractor, if applicable, is to verify that the required “fall” of any surface will meet its required intercept pointprior to Subcontractor starting installation of the work.MCS CAMPUS SITE AND ATHLETIC IMPROVEMENTS2. AVB 01 0000 SUBCONTRACTOR GEN REQ TEMPLATE V15 07272020Page 3 of 431.14. Subcontractor shall provide all layout required for the work of this work category for:1. Specific line2. Grade3. Control4. and location1.15. Subcontractor shall store all equipment and materials in locations approved and as directed by AVB Construction,and will relocate these items, at no cost, if so directed by AVB Construction.1.16. Subcontractor shall be responsible for cleaning up debris resulting from its work on a daily basis. Debris will bedisposed of in the jobsite dumpster provided by AVB Construction. Failure to comply will result in AVBConstruction completing the clean-up work on behalf of the Subcontractor with a deductive Change Order written tothe Subcontract, including applicable equipment costs.1.17. Temporary jobsite power will be available at 110 Volts, 20 Amps at the site. Any power requirements in addition tothat provided must be supplied by this Subcontractor.1.18. Final payment application will be processed per Section 01 77 19 Project Close-out.1.19. Subcontractor shall warranty, as applicable, the workmanship of the materials supplied or materials and installationof the work of this work category for a period of two (2) years from the date of receipt of the final certificate ofoccupancy, such period as required, or such period as provided by the manufacturer, whichever is longer.1.20. Subcontractor shall be responsible to repair a minor amount of damage to its work caused by others.1.21. Retainage will be held against payments to the Subcontractor at the rate of ten percent (10%) until the completion ofthe project.1.22. Change Orders will not be considered on the monthly application for payment until the Change Orders have beenissued and formally executed by both parties.1.23. Tobacco Products are prohibited on the MCS Campus, including, but not limited to, the footprint of the building orin the Construction Management Building/Facility.1.24. Dress Code: Proper work attire is required for all Subcontractors working on site. Long pants, shirts with sleeves (nocut-offs), proper PPE including: work boots, safety glasses and hard hats are required at all times.1.25. Self Conduct: Improper language or behavior will not be tolerated and will be considered applicable grounds fordismissal from the site/project. Subcontractors and vendors are not to communicate with students or staff. Ifapproached by students or staff, subcontractor is to direct persons to the AVB field office to speak with AVB ProjectManagement Team.End of Section 01 10 00 General ItemsMCS CAMPUS SITE AND ATHLETIC IMPROVEMENTS2. AVB 01 0000 SUBCONTRACTOR GEN REQ TEMPLATE V15 07272020Page 4 of 4301 14 00 Access to/Use of Site1.1. Site Logistics will be discussed at Post Bid Interviews.1.2. Subcontractor shall limit his use of the premises for his work and for storage to allow for:1. work by other Subcontractors,2. Owner occupancy, and3. public use.1.3. Limitations on site usage as well as specified requirements that impact site utilization are indicated on the drawingsand by other contract documents. In addition to these limitations and requirements, the Construction Manager willadminister allocation of available space equitably among entities needing both access and space so as to produce thebest overall efficiency in performance as the total work of the project. Schedule deliveries so as to minimize spaceand time requirements for storage of materials and equipment on site.1.4. SubContractor shall obtain and pay for the use of additional storage or work areas needed for operations.1.5. Subcontractor shall assume full responsibility for the protection and safekeeping of products under his contract thatare stored on the site. This includes moving, at no additional cost, any stored products, under Subcontractor’s control,which interfere with operations of the Owner or other Subcontractors.1.6. See Section 01 51 00 for Temporary Utilities and Section 01 52 00 for Temporary Facilities if applicable.End of Section 01 14 00 Access to/Use of SiteMCS CAMPUS SITE AND ATHLETIC IMPROVEMENTS2. AVB 01 0000 SUBCONTRACTOR GEN REQ TEMPLATE V15 07272020Page 5 of 43
- Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 238910Site Preparation Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
511/26306.JLM; Alpena CRTC - ...
Description: 511/26306.JLM; Alpena CRTC - Bldg 370 Roof Repair Department: Technology, Management and
State of Michigan
Bid Due: 7/16/2026
DWP HVAC Replacements Department Contact: Dan Kleinheksel Dan.Kleinheksel@wyomingmi.gov Purchasing Dept. Email: Laura.Jackson@wyomingmi.gov Bid
City of Wyoming
Bid Due: 7/14/2026