CMAR for Kortsen Road from Pinal Ave to Peart Rd
Project Information
- Bid Title
- CMAR for Kortsen Road from Pinal Ave to Peart Rd
- Issuing Agency
- City of Casa Grande
- Location
- Arizona
- Published Date
- Mar 24, 2026
- Closing Date
- Apr 21, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 1057-26-CG
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 1057-26-CG
Bid Title: CMAR for Kortsen Road from Pinal Ave to Peart Rd
Category: BID/RFP/RFQ/SOQ Status: Open Description: CITY OF CASA GRANDE, ARIZONAREQUEST FOR STATEMENT OF QUALIFICATIONSFOR CONSTRUCTION MANAGER AT RISK FORKORTSEN ROAD FROM PINAL AVE TO PEART RD
The City of Casa Grande requests Statements of Qualifications (SOQs) for a qualified Construction Manager at Risk (CMAR) to provide pre-construction services and complete construction services for Kortsen Road from Pinal Ave. to Peart Rd.
Each response shall be per the SOQ instructions and scope of work package on file with the City Clerk at City Hall, 510 East Florence Boulevard, Casa Grande, Arizona, 85122. Copies can be obtained by calling the City Clerk's Office at (520) 421-8600 or by downloading a complete packet below.
All responses must be submitted by 2:00 p.m. local time on April 21, 2026, to the City Clerk, 510 East Florence Boulevard, Casa Grande, Arizona 85122. The responses will be evaluated in accordance with Section Five (5) of the SOQ.
Responses must be addressed to:
Office of the City Clerk
City of Casa Grande
510 East Florence Boulevard
Casa Grande, Arizona 85122The envelope must be boldly marked:
April 21, 2026 – 2:00 p.m.
STATEMENT OF QUALIFICATIONS
FOR CONSTRUCTION MANAGER AT RISK
KORTSEN ROAD FROM PINAL AVE TO PEART RDSolicitation Number 1057-26-CG
The City of Casa Grande reserves the right to waive any informalities or irregularities in this Statement of Qualifications solicitation, or to reject any or all responses; to be the sole judge of the suitability of the services and materials offered, and to award a contract for the furnishing of the services it deems to be in the best interest of the City.
/s/ Larry Rains
City ManagerPublication Date/Time: 3/24/2026 12:00 AM Closing Date/Time: 4/21/2026 2:00 PM Related Documents: - Attachment Preview
-
REQUEST FOR QUALIFICATIONSFORCONSTRUCTION MANAGER AT RISKFORKORTSEN ROAD FROM PINAL AVENUE TO PEARTROADSOLICITATION NUMBER RFQ 1057-26-CGMARCH 2026CITY OF CASA GRANDE, ARIZONAREQUEST FOR STATEMENT OF QUALIFICATIONSFOR CONSTRUCTION MANAGER AT RISK FORKORTSEN ROAD FROM PINAL AVENUE TO PEART ROADThe City of Casa Grande requests Statements of Qualifications (SOQs) for a ConstructionManager at Risk (CMAR) to provide preconstruction services and complete construction servicesfor the City’s Kortsen Road from Pinal Avenue to Peart Road Project in the City of Casa Grande,Arizona.Each response shall be per the SOQ instructions and scope of work package on file with the CityClerk at City Hall, 510 East Florence Boulevard, Casa Grande, Arizona, 85122. Copies can beobtained by calling the City Clerk's Office (520) 421-8600 or downloading a complete packet at theCity's website: www.casagrandeaz.gov.All responses must be submitted by 2:00 p.m. local time on Tuesday, April 21, 2026 to the Officeof the City Clerk, 510 East Florence Boulevard, Casa Grande, Arizona 85122. The responses willbe evaluated in accordance with Section Five (5) of the SOQ.Responses must be addressed to:Office of the City ClerkCity of Casa Grande510 East Florence BoulevardCasa Grande, Arizona 85122The envelope must be boldly marked:Tuesday, April 21, 2026 – 2:00 P.M.STATEMENT OF QUALIFICATIONSFOR CONSTRUCTION MANAGER AT RISK FORKORTSEN ROAD FROM PINAL AVENUE TO PEART ROADSolicitation Number RFQ 1057-26-CGThe City of Casa Grande reserves the right to waive any informalities or irregularities in thisStatement of Qualifications solicitation or to reject any or all responses, to be the sole judge of thesuitability of the services and materials offered, and to award a contract for the furnishing of theservices it deems to be in the best interest of the City./s/ Larry RainsCity ManagerCITY OF CASA GRANDE, ARIZONAREQUEST FOR STATEMENT OF QUALIFICATIONSFOR CONSTRUCTION MANAGER AT RISK FORKORTSEN ROAD FROM PINAL AVENUE TO PEART ROADTABLE OF CONTENTSSECTIONPAGESECTION 1 - PROJECT DESCRIPTION ....................................................................................................... 3SECTION 2 - SCOPE OF WORK................................................................................................................... 4SECTION 3 - TERMS, CONDITIONS, AND INSTRUCTIONS........................................................................ 5SECTION 4 - SUBMITTAL REQUIREMENTS................................................................................................ 8SECTION 5 - SUBMITTAL EVALUATION PROCESS ................................................................................. 10SECTION 6 - SELECTION PROCESS......................................................................................................... 14APPENDIX A – REQUIRED SUBMITTAL FORMSAPPENDIX B – SAMPLE CMAR PRE-CONSTRUCTION CONTRACTAPPENDIX C – SAMPLE CMAR CONSTRUCTION CONTRACT2SECTION 1 - PROJECT DESCRIPTIONThe City of Casa Grande (City) is seeking a qualified Construction Manager at Risk (CMAR) to providepreconstruction services and complete construction services as the CMAR for roadway constructionfor the following project, herein referred to as "the Project":Kortsen Road from Pinal Avenue to Peart Road Project will be built in two separate segments:• Segment 1: Kortsen Road, Peart Road to Maria Avenue• Segment 2: Kortsen Road, Maria Avenue to Pinal AvenueThis procurement is conducted pursuant to A.R.S. Section 34-603. The City intends to select aCMAR based on qualifications and to negotiate a contract for preconstruction services, followed bynegotiating a Guaranteed Maximum Price (“GMP”) for construction services.The Project limits are shown below.The improvements are based on the following objectives:• Expanding capacity to reduce congestion while maintaining safety performance for allroad users. Pedestrian enhancements will focus on safer crossings, better sidewalks,and improved signal timing.• Improving pavement drainage by providing roadside retention basins to managestormwater runoff.• Engaging all relevant stakeholders ensures diverse perspectives, transparentdecision-making, and smoother project execution from planning throughmaintenance.• Engaging all relevant stakeholders to share project information, obtain input, andwork together to meet community needs.3SECTION 2 - SCOPE OF WORKThe Scope of Work will include, but not be limited to, the following tasks:The Construction Management at Risk (CMAR) will be responsible for working with the engineeringdesign team. The CMAR will serve as the general contractor during the design and constructionphases of this Project. During this design phase of the Project, the CMAR will be required toactively participate in the design process while determining the constructability and cost estimatingfor the Project. The Project's cost estimation shall consist of determining the design parametersrequired to ensure the Project can be designed and constructed within budget.Before construction, the CMAR will assume the risk of delivering the Project through a GMPconstruction contract. The CMAR will be responsible for construction means and methods. TheCMAR may also self-perform work or solicit bids from qualified subcontractors.Prior to execution of the construction contract, CMAR shall provide the City a Payment Bond anda Performance Bond in accordance with A.R.S. Section 34-222.The following are the minimum requirements of the CMAR:A. During the pre-construction phase services by the CMAR may, at a minimum, berequired to:1. Work with the design team in the development of final design plans and quantities,including providing suggestions or recommendations for value engineering and otherpotential cost-savings opportunities.2. Develop a Guaranteed Maximum Price (GMP) to perform the work identified in theplans developed by the Project design team.3. Identify any long-lead items required.4. Provide a conceptual schedule for the Project, primarily the construction phase.B. During the Construction phase services by the CMAR may, at a minimum be requiredto:1. Construct all improvements.2. Coordinate with various City of Casa Grande departments, other agencies,utility companies, etc.3. Arrange for procurement of materials and equipment.4. Maintain the approved Project schedule.5. Bid, award, and manage all construction-related contracts while meetingCity requirements for procurement of subcontractor and supplier bids.6. Provide quality controls, including QA/QC testing.7. Provide payment and performance bonds to ensure construction.8. Address and obtain federal, state, and local permitting requirements.9. Assist in the resolution of owner issues.10. Maintain a safe work site for all Project participants.4
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
30 Main - ABATEMENT OF REGULA...
Bid Number: 26-015 Bid Title: 30 Main - ABATEMENT OF REGULATED BUILDING MATERIAL
City of Bisbee
Bid Due: 7/09/2026
Gravel, Rock, and Supplies (S...
Code: BPM007682 Label: Gravel, Rock, and Supplies (Southern Region) Commodity: Sand Agency: Arizona
State Government of Arizona
Bid Due: 7/16/2026