RFP - MATERIALS TESTING & SPECIAL INSPECTION SERVICES - VARIOUS MUSD PROJECTS
Project Information
- Bid Title
- RFP - MATERIALS TESTING & SPECIAL INSPECTION SERVICES - VARIOUS MUSD PROJECTS
- Issuing Agency
- Martinez Unified School District
- Location
- California
- Published Date
- May 13, 2026
- Closing Date
- May 28, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
- RFP - MATERIALS TESTING & SPECIAL INSPECTION SERVICES - VARIOUS MUSD PROJECTS
RFP - Material Testing & Special Inspection Services - Various MUSD Projects
- RFP Due Date: May 28, 2026 by 2:00pm
- RFP - MATERIALS TESTING & SPECIAL INSPECTION SERVICES - VARIOUS MUSD PROJECTS
- Attachment Preview
-
MARTINEZ UNIFIED SCHOOL DISTRICT921 Susana StreetMartinez, CA 94553REQUEST FOR PROPOSALMay 12, 2026MATERIAL TESTING & SPECIAL INSPECTION SERVICESMorello Park Elementary School - TK Building ProjectAlhambra High School - New Gymnasium ProjectAlhambra High School - Upper Field, Track, and Tennis Court Project1200 Morello Park Drive, Martinez, CA 94553 (Morello Park Elementary School)150 E Street, Martinez, CA 94553 (Alhambra High School)The Martinez Unified School District is seeking proposals from qualified material testing firms approved byDSA for material testing and special inspection services for the Alhambra High School and Morello ParkElementary School Campuses.Background Information:General testing and special inspection services, including but not limited to building structures, on/off-siteand site service work for construction of new t/k elementary school buildings, a new gymnasium building,and new upper synthetic turf field, new track, and new tennis court (PT-slab) and additions to the existingcampus, located at 1200 Morello Park Drive, & 150 E Street, Martinez, CA 94553. Project consists ofapproximately 9,424 (AHS Gym) and 2,621 (Morello Park TK) square feet of new structures (single storywood framed) in accordance with the plans and specifications prepared by SVA Architects. AHS UpperField Project consists of & Huckabee. The project is bound by a project labor agreement. The successfulbidder is required to execute the agreement to be bound. This will occur at the time of award.AHS GYMStart of Construction:Construction Period:Estimated Total Construction Cost:Morello Park TKConstruction Period:Estimated Total Construction Cost:AHS Upper Field, Track, Tennis CourtStart of Construction:Construction Period:Estimated Total Construction Cost:June 5, 2026June 5, 2026 through July 30, 2027$ 9,000,000.00Start of Construction: June 5, 2026June 5, 2026 through July 30, 2027$ 3,800,000.00June 5, 2026June 5, 2026 through November 30, 2026$ 3,500,000.00Proposals:Due Date: May 28, 2026, by 2:00pmMartinez Unified School DistrictMorello Park TK Building & Various AHS ProjectsRFP - Material Testing and Special InspectionPage 1 of 6Location:Martinez Unified School District921 Susana StreetMartinez Ca 94553ATTN: Jared Ruddell, Facilities and Operations CoordinatorPhone: (925) 335-5800Refer all inquiries concerning this RFP to:Patrick WalshCumming GroupCell:E-mail:Copy:(925) 326-0166patrick.walsh@cumming-group.comramon.parocua@cumming-group.comProposal Criteria:Provide general information about your firm including:a. Number of years in business.b. Location of office from which work will be performed/dispatched.c. Professional credentials, licenses, etc.d. Verification of DSA approval.e. Relevant experience including:1. Project name/location2. Year completed/current status3. Client name (District name) and contact. 2 only4. IOR names and contact information. 2 onlyf. Identify any proposed consultants to be used on the project.g. Identify lead time requirements for schedulingh. Include any client references and/or letters of recommendation. 2 onlyPricing Format:Please provide unit pricing and total sum as noted below for all applicable services listed below.Location assumptions:ConcreteAsphaltRecycled base rockVirgin base rockStructural SteelRebarCentral Concrete, Martinez CACounty Quarry, Concord CACounty Quarry, Concord CASyar Industries, Vallejo CAWithin a 100 mile radius of projectWithin a 125 mile radius of projectThe District recognizes that the unit pricing proposed by the vendor is an estimate and as such, quantitiesare subject to change based on actual site requirements.ALL SOIL INSPECTIONS RELATED TO THE BUILDING PAD, SITE GRADING, TRENCHING ANDMartinez Unified School DistrictMorello Park TK Building & Various AHS ProjectsRFP – Material Testing and Special InspectionPage 2 of 6BASE ROCK, AB SAMPLING, AC IN-PLACE DENSITY, LIME TREATMENT, SUBDRAINOBSERVATION, CONSTRUCTION WILL BE BY OTHERS. (District Geo Tech: Geo EngineeringSolutions, Inc)AHS GYM:1) ConcreteA) Concrete mix design reviewB) Batch plant inspectionsC) On site concrete samplingD) Break tests6 hours32 hours40 hours60 total2) Anchor Bolts/Connecting boltsA) Material IDB) Connecting bolts16 hours16 hours3) Structural steelA) Material IDB) Shop weldingC) On site welding4) Re-BarA) Material ID sample and tagB) Testing rebar5) Glu Lamb BeamsA) In plant inspection (Oregon)6) AnchorsA) Epoxy/wedge anchor pull testsB) Anchor bolt and connecting bolt torque test7) PavingA) Asphalt submittal reviewB) Quality control during paving8) Walk Way Awning/Canopy.A) Material IDMartinez Unified School DistrictMorello Park TK Building & Various AHS ProjectsRFP – Material Testing and Special Inspection12 hours20 hours16 hours20 hours16 testsLS $12,000.0016 hours16 hours4 hours24 hours8 hoursPage 3 of 6B) Shop weldingC) On-site WeldingD) Concrete batch plant inspectionE) Concrete site samples20 hours12 hours4 hours4 hours9) Estimate total administration fees based on above information $_____________Budget10) Travel Time Lump Sum100 hours $_____________11) Minimum Charge(hours) ____________Morello Park TK:12) ConcreteE) Concrete mix design reviewF) Batch plant inspectionsG) On site concrete samplingH) Break tests13) Anchor Bolts/Connecting boltsC) Material IDD) Connecting bolts14) Re-BarC) Material ID sample and tagD) Testing rebar15) AnchorsC) Epoxy/wedge anchor pull testsD) Anchor bolt and connecting bolt torque test4 hours10 hours10 hours20 total6 hours4 hours8 hours8 tests6 hours6 hours16) PavingC) Asphalt submittal reviewD) Quality control during paving2 hours10 hours17) Estimate total administration fees based on above information $_____________Budget18) Travel Time Lump Sum60 hours $_____________19) Minimum ChargeMartinez Unified School DistrictMorello Park TK Building & Various AHS ProjectsRFP – Material Testing and Special Inspection(hours) ____________Page 4 of 6AHS Upper Field, Track, Tennis Court:20) ConcreteI) Concrete mix design reviewJ) Batch plant inspectionsK) On site concrete samplingL) Break tests21) PT Tendon Placement & Stressing Inspection6 hours40 hours60 hours50 total80 hours22) Re-BarE) Material ID sample and tagF) Testing rebar24 hours15 tests23) AnchorsE) Epoxy/wedge anchor pull testsF) Anchor bolt and connecting bolt torque test16 hours8 hours24) PavingE) Asphalt submittal reviewF) Quality control during paving4 hours16 hours25) Estimate total administration fees based on above information $_____________Budget26) Travel Time Lump Sum60 hours $_____________27) Minimum Charge(hours) ____________Additional Fees (Rates):Enclose Firm Rate Sheeta. Staff Engineerb. Travel Timec. Mileaged. Vehiclee. Overtime Ratef. Double-time RateMartinez Unified School DistrictMorello Park TK Building & Various AHS ProjectsRFP – Material Testing and Special InspectionPage 5 of 6
- Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541350Building Inspection Services
- NAICS 541380Testing Laboratories
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFP for Comprehensive Coordin...
RFP for Comprehensive Coordination and Arc Flash Study Assessment and Update of GWRS/Fountain
Orange County Water District
Bid Due: 7/07/2026
Request for Qualifications (R...
Bid Number: RFQ-12-026 Bid Title: Request for Qualifications (RFQ): Plan Review & Inspection
City of Healdsburg
Bid Due: 7/22/2026