Third Party Construction Inspection Services
Project Information
- Bid Title
- Third Party Construction Inspection Services
- Issuing Agency
- Hutto city
- Location
- Texas
- Published Date
- May 4, 2026
- Closing Date
- Jun 3, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFQ# 2026-020-KM-02
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: RFQ# 2026-020-KM-02
Bid Title: Third Party Construction Inspection Services
Category: ALL BID OPPORTUNITIES Status: Open Description: The City of Hutto, TX is seeking qualified firms to provide comprehensive third-party construction inspection services for public infrastructure and capital improvement projects within the City of Hutto, TX. These services are required to ensure that all construction activities are performed in accordance with approved plans, project specifications, applicable codes, and the adopted standards of the City of Hutto, TX. The selected firm will act as an extension of City of Hutto, TX staff, providing independent and objective oversight throughout the construction process from pre-construction through project closeout.
The City of Hutto, TX anticipates a range of projects that may include roadway improvements, drainage and stormwater infrastructure, water and wastewater system improvements, utility relocations, site development, and other municipal capital improvement projects. The scope of services described herein is intended to cover the full spectrum of inspection and quality assurance activities required to protect the public interest and verify compliance with all applicable requirements.
Full solicitation, maps, and related documents will be available for viewing on Bonfire at 12:00 pm CST Monday 5/4/2026.
Publication Date/Time: 5/4/2026 8:00 AM Publication Information: https://huttotx.bonfirehub.com/projects Closing Date/Time: 6/3/2026 5:00 PM Submittal Information: https://huttotx.bonfirehub.com/projects Bid Opening Information: n/a Pre-bid Meeting: 5/13/2026 3 PM CST Contact Person: All personnel assigned to perform inspection services under the resulting contract shall possess qualifications appropriate to the nature of the work being inspected. The following minimum qualifications are anticipated:
- Demonstrated experience in the inspection of public infrastructure construction projects, including roadways, water, wastewater, and drainage systems
- Applicable certifications relevant to the type of work being inspected, which may include certifications from recognized professional organizations in the areas of construction inspection, materials testing, and quality assurance
- Familiarity with Texas Department of Transportation standard specifications and construction practices as they apply to local roadway projects
- Knowledge of The City standards, specifications, and development regulations
- Ability to read and interpret construction plans, specifications, geotechnical reports, and technical documents
- Valid driver's license and reliable transportation to project sites within the City and surrounding jurisdiction
- Strong written and verbal communication skills necessary to interact effectively with contractors, developers, engineers, and The City staff
Download Available: https://huttotx.bonfirehub.com Fee: 0 Plan & Spec Available: Full solicitation, maps, and related documents will be available for viewing on Bonfire at 12:00 pm CST Monday 5/4/2026. Miscellaneous: A non-mandatory Pre-Submission meeting will be held virtually via Microsoft Teams on Wednesday, May 13, 2026 at 3:00 PM CST using the following information: Meeting ID: 254 909 509 807 981 Passcode: Nj9MZ69a
https://teams.microsoft.com/meet/254909509807981?p=fJhR1ACCbyJx5BoNLbThe City will be accepting Qualification Submissions online via Bonfire at www.Bonfire.com until 5:00 pm CST on June 3, 2026.
Hard copies, or late submissions will not be accepted. Solicitation will be available on the City’s webpage. Solicitation and plans are available free of charge through www.Bonfire.com
Related Documents: - Attachment Preview
-
Request for QualificationsSolicitation Response No.RFQ# 2026-020-KM-02Third-Party Construction Inspection ServicesIssue Date: 5/4/2026Due date: 6/3/2026 at 5:00 PM CSTTable of ContentsArticle I. Executive Summary and Exhibits .................................................................................................. 41.1 Executive Summary ......................................................................................................................... 41.2 Exhibits ......................................................................................................................................... 4Article II. Administrative Information ........................................................................................................... 52.1 Schedule of Events....................................................................................................................... 52.2 Inquiries: ....................................................................................................................................... 52.2.1 Important Notes & Contact ...................................................................................................... 52.2.2 Prohibited Communications ................................................................................................ 62.3 General Requirements for Solicitation Response....................................................................... 62.3.1 Solicitation Response Format and Deadlines ......................................................................... 62.3.3 Alterations, Modifications, Withdrawals ............................................................................. 6Article III: Detail and Scope of Work ............................................................................................................. 63.1 Project Types & Applicable infrastructure................................................................................... 63.2 Scope of Inspection Services ....................................................................................................... 73.2.1 On-Call / As-Needed Inspection Services (As applicable)......................................................... 73.2.2 Pre-Construction Activities (As applicable) ........................................................................ 83.2.3 Construction Phase Inspection (As applicable) ................................................................... 83.2.4 Material Testing Coordination (As applicable) .................................................................... 93.2.5 Documentation and Reporting (As applicable) ................................................................... 93.2.6 Infrastructure Acceptance Inspections (As applicable)..................................................... 103.3 Inspector Qualification ............................................................................................................... 103.4 Coordination with City of Hutto Staff ........................................................................................ 113.5 Contract Structure & Deployment ............................................................................................. 123.6 General Requirements ............................................................................................................... 12Article IV. Evaluation and Award................................................................................................................ 124.1 Evaluation Criteria ...................................................................................................................... 124.2 Scoring Methodology................................................................................................................. 134.3 Contract Award & Terms of Contract ........................................................................................ 134.3.1 Contract Award ......................................................................................................................... 134.3.2 Terms of Contract .................................................................................................................... 134.4 New Vendor Packet.................................................................................................................... 144.5 Non-Appropriation..................................................................................................................... 14Page 2 of 24Article V. Required Respondent Information............................................................................................. 145.1 Solicitation Response Form ....................................................................................................... 145.2 Respondent Information............................................................................................................ 155.2.1 Company Profile..................................................................................................................... 155.3 List of Machinery and Equipment.............................................................................................. 165.4 Litigation History ........................................................................................................................ 165.5 References.................................................................................................................................. 165.6 Deviation or Compliance............................................................................................................ 175.6.1 Deviation................................................................................................................................. 175.7.2 No Deviations ..................................................................................................................... 175.7 Cooperative/ Interlocal Purchasing ........................................................................................... 185.8 Conflict of Interest Questionnaire.............................................................................................. 195.9 Subcontractors ........................................................................................................................... 19Article VI. Responses .................................................................................................................................. 20Article VII. Standard Terms and Special Conditions.................................................................................. 207.1 Standard Terms and Special Conditions....................................................................................... 207.1.1 Labor, Materials, and Time .................................................................................................... 207.1.2 OSHA Compliance .................................................................................................................. 207.1.4 Amendments, Rejections, and or withdrawals ................................................................. 217.1.5 Irregularities............................................................................................................................ 217.1.6 Evaluation, Offer Period and Contract Award ....................................................................... 217.1.7 Affirmations and Solicitation Acceptance ............................................................................. 227.1.8 Open Records ......................................................................................................................... 227.1.9 Contract Responsibility .......................................................................................................... 227.1.10 Public Disclosure ................................................................................................................ 227.1.11 Remedies................................................................................................................................ 237.2 Insurance and Bonds.................................................................................................................. 237.2.1 Required Insurance Coverages .............................................................................................. 237.2.2 Performance and Payment Bond Amounts ...................................................................... 237.3 Disclosure of Interested Parties................................................................................................. 24Article VIII. Submission Checklist ............................................................................................................... 24Page 3 of 24Article I. Executive Summary and Exhibits1.1 Executive SummaryThe City of Hutto, TX is seeking qualified firms to provide comprehensive third-partyconstruction inspection services for public infrastructure; capital improvement projects;street and transportation projects, water and wastewater projects (includingwastewater treatment plant projects), within the City of Hutto. These services arerequired to ensure that all construction activities are performed in accordance withapproved plans, project specifications, applicable codes, and the adopted standards ofthe City of Hutto. The selected firm will act as an extension of the City staff, providingindependent and objective oversight throughout the construction process from pre-construction through project closeout.The City of Hutto, TX anticipates a range of projects that may include roadwayimprovements, drainage and stormwater infrastructure, water and wastewater systemimprovements, utility relocations, site development, and other municipal capitalimprovement projects. The scope of services described herein is intended to cover thefull spectrum of inspection and quality assurance activities required to protect the publicinterest and verify compliance with all applicable requirements.The City of Hutto will consider qualifications from business entities that demonstratethe ability to complete the Project within the guidelines of this solicitation, following allapplicable federal, state, and local rules, laws, and regulations and the terms andconditions contained in Exhibit B. Respondent must execute Exhibit A and completeother items listed on the Submission Checklist to be considered for award.1.2 ExhibitsExhibit A – General Affirmations and Solicitation AcceptanceExhibit B – Definitions, Standard Terms and ConditionsExhibit C – SOQ & Evaluation CriteriaPage 4 of 24Article II. Administrative Information2.1 Schedule of EventsThe dates provided represent a tentative schedule of events related to this solicitation.The City of Hutto reserves the right to modify these dates before the deadline forsubmission of Solicitation Responses upon notice being posted on the City website andits Vendor Connection website, Bonfire.Schedule of EventsEventDeadlineSolicitation Issuance5/4/2026Pre-Submittal Conference (optional) 3:00 PM 5/13/2026Deadline for Question Submittal 5:00 PM 5/27/2026Anticipated Addenda Release, ifapplicable.Submission Deadline5/29/20265:00 PM 6/3/2026Notice of Intent to Award6/10/2026Tentative Award Date7/2/20262.2 Inquiries:2.2.1 Important Notes & ContactQuestion deadline is 5/27/2026 at 5:00 PM CST. Any question submitted afterthis time will not be answered.Any questions, clarifications, concerns or requests for general informationshould be submitted in writing via Bonfire.Solicitation documents may be examined or obtained electronically at the City’sBid postings website and its Vendor Connection website, Bonfire. All addendawill be posted on the City’s Bid postings website and its Vendor Connectionwebsite. It is the sole responsibility of the Respondent to check for Addenda.Page 5 of 24
- Commodity Codes
-
- NAICS 541330Engineering Services
- NAICS 541350Building Inspection Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
LOCAL LET MAINTENANCE CONTRAC...
LOCAL LET MAINTENANCE CONTRACT, EL PASO CO, CULVERT CLEANING Solicitation ID: 6500-71-001_0726 Due
State Government of Texas
Bid Due: 7/09/2026
Rolling Stock Inspection Serv...
Project: Rolling Stock Inspection Services Ref. #: RFP Doc2104296360 Department: Purchasing Type: RFP
METRO - Metropolitan Transit Authority of Harris County, Houston, TX
Bid Due: 7/08/2026