James J. Eagan HVAC Replacement
Project Information
- Bid Title
- James J. Eagan HVAC Replacement
- Issuing Agency
- City of Florissant
- Location
- Missouri
- Published Date
- Feb 28, 2026
- Closing Date
- Mar 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 25-0239
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID: 25-0239
Title: James J. Eagan HVAC Replacement
Addenda: 0
Release Date: 2/27/2026
Due Date: 3/20/2026
James J. Eagan HVAC ReplacementFollowInvitation For BidParks and Recreation23 , 237 , 2382Project ID: 25-0239Release Date: Friday, February 27, 2026· Due Date: Friday, March 20, 2026 12:00pmPosted Friday, February 27, 2026 4:30pmAll dates & times in Central TimeDraft Response Events RSVP No Bid20 days, 9 hours, 54 minutesOverview
Post Information
Posted At:Fri, Feb 27, 2026 4:30 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryGeneral work description: The City of Florissant is seeking sealed bids from qualified HVAC contractors to provide all labor, equipment, materials, and supervision necessary to remove and replace the existing air-cooled chiller system at the James J. Eagan Community Center.
Equipment Specification
Contractor shall furnish and install one (1) air-cooled scroll chiller meeting or exceeding the following specifications:
-
Manufacturer: Carrier (or approved equal)
-
Model: 30RCM1526S055-7-2
-
Type: Air-Cooled Scroll Chiller
-
Cooling Capacity: ~142.6 Tons
-
Refrigerant: R-32
-
Dual Refrigerant Circuits
-
Brazed Plate Heat Exchanger (BPHE)
-
Microchannel Condenser Coil
-
Variable Condenser Fans (High-Efficiency)
-
BACnet IP & MS/TP Compatibility
-
7” Control Display with Quick Restart/Capacity Recovery
-
Low Sound Package with Aero-Acoustic Fans
-
Single Point Power
-
Evaporator Heater (Freeze Protection)
All equipment shall be new, factory-authorized, and AHRI-certified.
Scope of Work
The contractor shall provide turnkey installation including, but not limited to:
1. Demolition & Removal
-
Drain, disconnect, and remove existing chiller.
-
Recover refrigerant and dispose of equipment per EPA regulations.
2. Rigging & Placement
-
Provide crane and rigging services.
-
Set and secure new chiller on existing pad/structure.
3. Mechanical Installation
-
Modify and reconnect piping as required.
-
Reconnect to existing building systems.
-
Reuse existing shutoff valves where feasible.
-
Insulate piping and components as needed.
4. Electrical & Controls
-
Reconnect existing electrical service.
-
Re-land existing control wiring.
5. System Start-Up
-
Fill system, test for leaks, and purge air.
-
Provide factory startup and commissioning.
-
Verify full operational performance.
5. Contractor Responsibilities
-
Field verify all dimensions and utilities.
-
Coordinate work with City staff.
-
Maintain site safety and protection.
-
Provide cleanup and debris disposal.
-
Obtain permits if required.
-
Comply with all applicable codes.
Timeline
Release Project Date:February 27, 2026Pre-Bid Meeting (Non-Mandatory):March 4, 2026, 9:00am1 James J. Eagan Drive, Florissant, MO 63033Question Submission Deadline:March 18, 2026, 5:00pmQuestion Response Deadline:March 19, 2026, 5:00pmSubmission Deadline:March 20, 2026, 12:00pmZoom link: https://us04web.zoom.us/j/72235527422?pwd=GpWOxcPy5ngS2bGDakhhCDdW63Onat.1
Passcode: F47bSG -
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Jefferson City Readiness Cent...
Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded
State Government of Missouri
Bid Due: 7/28/2026
Coffeyville HS Natatorium Roo...
Coffeyville HS Natatorium Roof Replacement & Renovations 26-403 StatusAccepting Bids Prebid Date 7/1/26
Drexel Technologies
Bid Due: 7/15/2026