James J. Eagan HVAC Replacement

Project Information

Bid Title
James J. Eagan HVAC Replacement
Issuing Agency
City of Florissant
Location
Missouri
Published Date
Feb 28, 2026
Closing Date
Mar 20, 2026
Government Level
State & Local
Status
Closed
Ref. #
25-0239
Original Source
Join to Access Full Details
Project Description


Project ID: 25-0239

Title: James J. Eagan HVAC Replacement

Addenda: 0

Release Date: 2/27/2026

Due Date: 3/20/2026

Follow
James J. Eagan HVAC Replacement
Invitation For Bid
Parks and Recreation
23 , 237 , 2382
Project ID: 25-0239
Release Date: Friday, February 27, 2026
· Due Date: Friday, March 20, 2026 12:00pm
Posted Friday, February 27, 2026 4:30pm
All dates & times in Central Time
Draft Response Events RSVP No Bid20 days, 9 hours, 54 minutes


Post Information

Posted At:Fri, Feb 27, 2026 4:30 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

General work description: The City of Florissant is seeking sealed bids from qualified HVAC contractors to provide all labor, equipment, materials, and supervision necessary to remove and replace the existing air-cooled chiller system at the James J. Eagan Community Center.

Equipment Specification

Contractor shall furnish and install one (1) air-cooled scroll chiller meeting or exceeding the following specifications:

  • Manufacturer: Carrier (or approved equal)

  • Model: 30RCM1526S055-7-2

  • Type: Air-Cooled Scroll Chiller

  • Cooling Capacity: ~142.6 Tons

  • Refrigerant: R-32

  • Dual Refrigerant Circuits

  • Brazed Plate Heat Exchanger (BPHE)

  • Microchannel Condenser Coil

  • Variable Condenser Fans (High-Efficiency)

  • BACnet IP & MS/TP Compatibility

  • 7” Control Display with Quick Restart/Capacity Recovery

  • Low Sound Package with Aero-Acoustic Fans

  • Single Point Power

  • Evaporator Heater (Freeze Protection)

All equipment shall be new, factory-authorized, and AHRI-certified.

Scope of Work

The contractor shall provide turnkey installation including, but not limited to:

1. Demolition & Removal

  • Drain, disconnect, and remove existing chiller.

  • Recover refrigerant and dispose of equipment per EPA regulations.

2. Rigging & Placement

  • Provide crane and rigging services.

  • Set and secure new chiller on existing pad/structure.

3. Mechanical Installation

  • Modify and reconnect piping as required.

  • Reconnect to existing building systems.

  • Reuse existing shutoff valves where feasible.

  • Insulate piping and components as needed.

4. Electrical & Controls

  • Reconnect existing electrical service.

  • Re-land existing control wiring.

5. System Start-Up

  • Fill system, test for leaks, and purge air.

  • Provide factory startup and commissioning.

  • Verify full operational performance.

5. Contractor Responsibilities

  • Field verify all dimensions and utilities.

  • Coordinate work with City staff.

  • Maintain site safety and protection.

  • Provide cleanup and debris disposal.

  • Obtain permits if required.

  • Comply with all applicable codes.



Timeline

Release Project Date:
February 27, 2026
Pre-Bid Meeting (Non-Mandatory):
March 4, 2026, 9:00am
1 James J. Eagan Drive, Florissant, MO 63033
Question Submission Deadline:
March 18, 2026, 5:00pm
Question Response Deadline:
March 19, 2026, 5:00pm
Submission Deadline:
March 20, 2026, 12:00pm
Commodity Codes
  • NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Jefferson City Readiness Cent...

Project Number Title Bid Date/ IFB/ RFQ/Electronic Plans Bid Addendum(s) Bid Results/ Awarded

State Government of Missouri

Bid Due: 7/28/2026

Coffeyville HS Natatorium Roo...

Coffeyville HS Natatorium Roof Replacement & Renovations 26-403 StatusAccepting Bids Prebid Date 7/1/26

Drexel Technologies

Bid Due: 7/15/2026